Brazil construction costs — week of 23 October 2026
In one line
Construction material prices in Brazil are likely to rise — about 1.2% by January 2027.
What it means for your money
For every 1,000,000 BRL you spend on materials today, budget about 1,012,000 BRL for the same materials in January 2027 (most likely between 1,001,000 and 1,028,000).
Prices to watch
- ⬆ Construction costs (all) — up about 1.2% by January 2027
Why
- World oil prices are up 15% in the last 3 months — this feeds diesel, transport, asphalt and plastics.
- The BRL is 1% stronger against the US dollar than 3 months ago — imported steel, cement inputs, paint and fittings cost a little less.
What to do this week
- Prices are creeping up: compare at least two quotes before big orders.
- Keep a small contingency for price rises in new quotes.
How well does the forecast do here?
Brazil is a benchmark: CiO Costs runs the same kind of forecast here as in the African pilot countries, on an official index that is published every month and on time — so anyone can check how well the tool does.
- Tested month by month over the last 48 months, using only the data available at the time.
- The real change fell inside the likely range 88% of the time one month ahead and 94% three months ahead (the aim is 80%).
- Average miss one month ahead: 0.19 points, against 0.44 for simply assuming no change. The forecast beats that simple rule here.
Official figures
The latest official figures are for September 2026, from the Fundação Getulio Vargas (FGV), via Banco Central do Brasil.
How to read this
"Likely" means about 7 times in 10; "almost certain" about 9 in 10. Changes are measured from today. CiO Costs is a forecasting tool: these are estimates with a range, not official statistics, a price list or advice.
See all the figures for Brazil
Get this note free every week: follow CiO Costs on WhatsApp
CiO Costs · free weekly note · CiO Lab