Zambia construction costs — week of 23 October 2026
In one line
Import costs for construction materials in Zambia look steady for the next 3 months.
What it means for your money
For every 1,000,000 ZMW you spend on materials today, budget about 1,001,000 ZMW for the same materials in January 2027 (most likely between 937,000 and 1,077,000).
Prices to watch
- ➡ Imported materials (steel, cement inputs, paint, pipes, fuel) — about the same by January 2027
- ➡ Steel (CiO estimate from world steel prices, rough) — about the same by January 2027
- ➡ Petrol (official pump price) — about the same by January 2027
- ➡ Diesel (official pump price) — about the same by January 2027
- ➡ Local materials and labour — not covered by this estimate; check local quotes.
Why
- World oil prices are up 15% in the last 3 months — this feeds diesel, transport, asphalt and plastics.
- The ZMW is 8% weaker against the US dollar than 3 months ago — imported steel, cement inputs, paint and fittings cost more.
What to do this week
- No rush: today's quotes are a fair guide.
- Use the quiet time to compare suppliers.
What people are paying
Not enough reports yet (3 people in the last 2 months are needed). Tell us what you pay — today or from the last few months; it is anonymous: Report a price on the CiO Costs site.
How CiO builds the estimate for Zambia
Zambia has no official construction price index, so CiO Costs builds an estimate every few hours:
- What goes in: world oil prices in the local currency and the exchange rate against the US dollar, weighted like the official construction baskets of Uganda and South Africa.
- What it covers: the imported part of construction material prices — steel, cement inputs, paint, pipes, fuel and transport.
- What it misses: local materials (sand, stone, blocks, timber) and labour. Your price reports fill this gap.
The CiO estimate index (100 = two years ago): May 86.1 · Jun 81.9 · Jul 82.9 · Aug 84.9 · Sep 88.0 · Oct 89.9.
How reliable is it? Where we can check it against an official index, its 3-month direction matched the official figure about 6 times in 10 (Uganda 63%, South Africa 64%). Use it as an early signal and a contract reference agreed by both sides, not as a measured price.
Using it in a contract: the monthly series is on the CiO Costs contract index page.
How to read this
"Likely" means about 7 times in 10; "almost certain" about 9 in 10. Changes are measured from today. CiO Costs is a forecasting tool: these are estimates with a range, not official statistics, a price list or advice.
See all the figures for Zambia