Site 24.4539, 54.3773. 31 of 31 days recorded, 31 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 83.9 mm against a pro-rata normal of 13 mm (670 % of normal; full-month normal 13 mm, 1991-2020).
- Rain days (1 mm or more): 5 against a pro-rata normal of 1.6.
- Heavy rain days (above the site's 1-in-10-day amount, 0 mm): 7; exceptional (above 1-in-100-day, 10 mm): 3.
- Days with gusts above the 1-in-10-day value (14 m/s): 5; days hotter than the 1-in-10-day maximum (32.3 °C): 4.
- Working hours lost to weather (caution or stop): outdoor labour 2 h, concrete pour 177 h, asphalt & surfacing 86 h, crane lifts 19 h, work at height 65 h, painting & coatings 69 h, earthworks 50 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-03-01 | ERA5 (final) | 0.0 | 0.0 | 32.8 | 7.7 | 26.8 | heat above 1-in-10-day | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-03-02 | ERA5 (final) | 0.0 | 0.0 | 32.1 | 9.2 | 25.9 |  | 9 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-03-03 | ERA5 (final) | 0.0 | 0.0 | 31.4 | 7.9 | 25.6 |  | 9 | 1 | 9 | 9 | 9 | 9 | 9 |
| 2026-03-04 | ERA5 (final) | 0.0 | 0.0 | 27.1 | 14.5 | 25.4 | gust above 1-in-10-day | 9 | 5 | 8 | 8 | 7 | 7 | 9 |
| 2026-03-05 | ERA5 (final) | 0.0 | 0.0 | 25.1 | 11.3 | 23.0 |  | 9 | 5 | 9 | 9 | 7 | 6 | 9 |
| 2026-03-06 | ERA5 (final) | 0.0 | 0.0 | 24.3 | 11.2 | 21.0 |  | 9 | 4 | 9 | 9 | 7 | 9 | 9 |
| 2026-03-07 | ERA5 (final) | 0.0 | 0.0 | 25.9 | 10.2 | 22.1 |  | 9 | 4 | 9 | 9 | 9 | 8 | 9 |
| 2026-03-08 | ERA5 (final) | 0.0 | 0.0 | 25.7 | 10.6 | 23.4 |  | 9 | 5 | 9 | 9 | 9 | 6 | 9 |
| 2026-03-09 | ERA5 (final) | 0.2 | 0.1 | 27.4 | 8.8 | 23.9 | rain heavy (above 1-in-10-day) | 9 | 5 | 6 | 9 | 9 | 8 | 9 |
| 2026-03-10 | ERA5 (final) | 0.6 | 0.2 | 28.4 | 13.4 | 24.3 | rain heavy (above 1-in-10-day) | 9 | 4 | 1 | 9 | 5 | 6 | 9 |
| 2026-03-11 | ERA5 (final) | 0.1 | 0.1 | 29.1 | 11.3 | 25.1 |  | 9 | 2 | 6 | 9 | 8 | 8 | 9 |
| 2026-03-12 | ERA5 (final) | 0.2 | 0.2 | 27.5 | 10.5 | 23.8 | rain heavy (above 1-in-10-day) | 9 | 5 | 6 | 9 | 8 | 6 | 9 |
| 2026-03-13 | ERA5 (final) | 0.1 | 0.1 | 30.6 | 7.4 | 25.9 |  | 9 | 5 | 9 | 9 | 9 | 7 | 9 |
| 2026-03-14 | ERA5 (final) | 0.0 | 0.0 | 30.4 | 10.2 | 26.2 |  | 9 | 3 | 9 | 9 | 9 | 8 | 9 |
| 2026-03-15 | ERA5 (final) | 0.0 | 0.0 | 32.5 | 6.9 | 28.4 | heat above 1-in-10-day | 7 | 5 | 9 | 9 | 9 | 8 | 9 |
| 2026-03-16 | ERA5 (final) | 0.0 | 0.0 | 34.0 | 10.5 | 26.4 | heat above 1-in-10-day | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-03-17 | ERA5 (final) | 0.0 | 0.0 | 32.6 | 10.6 | 25.6 | heat above 1-in-10-day | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-03-18 | ERA5 (final) | 0.1 | 0.1 | 28.1 | 12.4 | 24.9 |  | 9 | 4 | 7 | 9 | 7 | 7 | 9 |
| 2026-03-19 | ERA5 (final) | 0.0 | 0.0 | 28.7 | 6.3 | 24.4 |  | 9 | 6 | 9 | 9 | 9 | 8 | 9 |
| 2026-03-20 | ERA5 (final) | 0.0 | 0.0 | 31.3 | 12.0 | 25.4 |  | 9 | 1 | 8 | 9 | 7 | 9 | 9 |
| 2026-03-21 | ERA5 (final) | 1.1 | 0.3 | 29.7 | 13.8 | 25.2 | rain heavy (above 1-in-10-day) | 9 | 1 | 0 | 7 | 6 | 7 | 9 |
| 2026-03-22 | ERA5 (final) | 0.1 | 0.1 | 30.9 | 7.4 | 27.4 |  | 9 | 4 | 9 | 9 | 9 | 6 | 9 |
| 2026-03-23 | ERA5 (final) | 25.7 | 4.2 | 26.2 | 9.6 | 23.4 | rain exceptional (above 1-in-100-day) | 9 | 0 | 0 | 9 | 0 | 0 | 0 |
| 2026-03-24 | ERA5 (final) | 12.7 | 3.2 | 24.9 | 10.3 | 25.2 | rain exceptional (above 1-in-100-day) | 9 | 3 | 0 | 9 | 1 | 0 | 0 |
| 2026-03-25 | ERA5 (final) | 9.5 | 2.8 | 26.4 | 17.5 | 25.1 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 9 | 5 | 0 | 6 | 2 | 0 | 0 |
| 2026-03-26 | ERA5 (final) | 0.3 | 0.2 | 29.4 | 18.1 | 27.3 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 9 | 2 | 0 | 2 | 0 | 5 | 4 |
| 2026-03-27 | ERA5 (final) | 33.0 | 5.9 | 25.9 | 16.0 | 24.5 | rain exceptional (above 1-in-100-day); gust above 1-in-10-day | 9 | 3 | 0 | 9 | 3 | 1 | 0 |
| 2026-03-28 | ERA5 (final) | 0.0 | 0.0 | 23.8 | 10.9 | 21.2 |  | 9 | 2 | 9 | 9 | 9 | 9 | 0 |
| 2026-03-29 | ERA5 (final) | 0.0 | 0.0 | 25.0 | 14.6 | 20.9 | gust above 1-in-10-day | 9 | 1 | 3 | 3 | 2 | 9 | 9 |
| 2026-03-30 | ERA5 (final) | 0.0 | 0.0 | 25.5 | 8.4 | 22.5 |  | 9 | 4 | 9 | 9 | 9 | 9 | 9 |
| 2026-03-31 | ERA5 (final) | 0.2 | 0.1 | 24.9 | 9.9 | 23.8 | rain heavy (above 1-in-10-day) | 9 | 7 | 4 | 9 | 9 | 8 | 9 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*