# Site weather record · Abu Dhabi · November 2026

Site 24.4539, 54.3773. 13 of 30 days recorded, 6 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 0.0 mm against a pro-rata normal of 1 mm (0 % of normal; full-month normal 3 mm, 1991-2020).
- Rain days (1 mm or more): 0 against a pro-rata normal of 0.3.
- Heavy rain days (above the site's 1-in-10-day amount, 0 mm): 13; exceptional (above 1-in-100-day, 2 mm): 0.
- Days with gusts above the 1-in-10-day value (12 m/s): 3; days hotter than the 1-in-10-day maximum (32.6 °C): 5.
- Working hours lost to weather (caution or stop): outdoor labour 32 h, concrete pour 70 h, asphalt & surfacing 0 h, crane lifts 7 h, work at height 22 h, painting & coatings 15 h, earthworks 0 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-11-01 | ERA5 (final) | 0.0 | 0.0 | 35.7 | 7.7 | 29.7 | rain heavy (above 1-in-10-day); heat above 1-in-10-day | 4 | 2 | 9 | 9 | 9 | 8 | 9 |
| 2026-11-02 | ERA5 (final) | 0.0 | 0.0 | 35.2 | 9.2 | 29.9 | rain heavy (above 1-in-10-day); heat above 1-in-10-day | 2 | 5 | 9 | 9 | 9 | 7 | 9 |
| 2026-11-03 | ERA5 (final) | 0.0 | 0.0 | 33.3 | 7.7 | 30.0 | rain heavy (above 1-in-10-day); heat above 1-in-10-day | 2 | 5 | 9 | 9 | 9 | 6 | 9 |
| 2026-11-04 | ERA5 (final) | 0.0 | 0.0 | 34.0 | 6.5 | 29.3 | rain heavy (above 1-in-10-day); heat above 1-in-10-day | 2 | 4 | 9 | 9 | 9 | 6 | 9 |
| 2026-11-05 | ERA5 (final) | 0.0 | 0.0 | 33.7 | 6.2 | 31.4 | rain heavy (above 1-in-10-day); heat above 1-in-10-day | 3 | 7 | 9 | 9 | 9 | 6 | 9 |
| 2026-11-12 | ERA5 (final) | 0.0 | 0.0 | 29.1 | 12.3 | 26.1 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 9 | 0 | 9 | 9 | 4 | 9 | 9 |
| 2026-11-13 | model analysis (preliminary) | 0.0 | 0.0 | 28.5 | 13.7 | 24.6 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 9 | 0 | 9 | 5 | 0 | 9 | 9 |
| 2026-11-14 | model analysis (preliminary) | 0.0 | 0.0 | 28.2 | 13.0 | 24.9 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 9 | 0 | 9 | 6 | 1 | 9 | 9 |
| 2026-11-15 | model analysis (preliminary) | 0.0 | 0.0 | 29.3 | 9.8 | 25.7 | rain heavy (above 1-in-10-day) | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-11-16 | model analysis (preliminary) | 0.0 | 0.0 | 28.7 | 8.6 | 26.4 | rain heavy (above 1-in-10-day) | 9 | 5 | 9 | 9 | 9 | 8 | 9 |
| 2026-11-17 | model analysis (preliminary) | 0.0 | 0.0 | 28.8 | 9.1 | 26.2 | rain heavy (above 1-in-10-day) | 9 | 5 | 9 | 9 | 9 | 8 | 9 |
| 2026-11-18 | model analysis (preliminary) | 0.0 | 0.0 | 29.8 | 9.5 | 26.8 | rain heavy (above 1-in-10-day) | 9 | 7 | 9 | 9 | 9 | 9 | 9 |
| 2026-11-19 | model analysis (preliminary) | 0.0 | 0.0 | 29.6 | 10.6 | 26.7 | rain heavy (above 1-in-10-day) | 9 | 5 | 9 | 9 | 9 | 8 | 9 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*
