# Site weather record · Abuja · February 2026

Site 9.0765, 7.3986. 28 of 28 days recorded, 28 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 0.0 mm against a pro-rata normal of 5 mm (0 % of normal; full-month normal 5 mm, 1991-2020).
- Rain days (1 mm or more): 0 against a pro-rata normal of 1.3.
- Heavy rain days (above the site's 1-in-10-day amount, 0 mm): 0; exceptional (above 1-in-100-day, 4 mm): 0.
- Days with gusts above the 1-in-10-day value (9 m/s): 0; days hotter than the 1-in-10-day maximum (37.0 °C): 3.
- Working hours lost to weather (caution or stop): outdoor labour 111 h, concrete pour 122 h, asphalt & surfacing 0 h, crane lifts 0 h, work at height 0 h, painting & coatings 10 h, earthworks 0 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-02-01 | ERA5 (final) | 0.0 | 0.0 | 35.6 | 5.7 | 31.3 |  | 2 | 7 | 8 | 8 | 8 | 7 | 8 |
| 2026-02-02 | ERA5 (final) | 0.0 | 0.0 | 36.1 | 6.8 | 30.7 |  | 2 | 3 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-03 | ERA5 (final) | 0.0 | 0.0 | 35.3 | 5.1 | 30.6 |  | 3 | 7 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-04 | ERA5 (final) | 0.0 | 0.0 | 36.7 | 5.3 | 30.2 |  | 2 | 4 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-05 | ERA5 (final) | 0.0 | 0.0 | 38.0 | 4.2 | 31.4 | heat above 1-in-10-day | 2 | 5 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-06 | ERA5 (final) | 0.0 | 0.0 | 34.9 | 7.5 | 30.6 |  | 3 | 5 | 8 | 8 | 8 | 6 | 8 |
| 2026-02-07 | ERA5 (final) | 0.0 | 0.0 | 35.9 | 6.0 | 31.9 |  | 2 | 7 | 8 | 8 | 8 | 7 | 8 |
| 2026-02-08 | ERA5 (final) | 0.0 | 0.0 | 36.9 | 5.5 | 31.3 |  | 3 | 5 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-09 | ERA5 (final) | 0.0 | 0.0 | 35.5 | 6.9 | 31.2 |  | 2 | 4 | 8 | 8 | 8 | 6 | 8 |
| 2026-02-10 | ERA5 (final) | 0.0 | 0.0 | 35.0 | 7.5 | 31.6 |  | 3 | 8 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-11 | ERA5 (final) | 0.0 | 0.0 | 36.0 | 6.0 | 32.0 |  | 3 | 7 | 8 | 8 | 8 | 6 | 8 |
| 2026-02-12 | ERA5 (final) | 0.0 | 0.0 | 35.2 | 6.5 | 30.9 |  | 2 | 5 | 8 | 8 | 8 | 6 | 8 |
| 2026-02-13 | ERA5 (final) | 0.0 | 0.0 | 35.6 | 5.9 | 31.3 |  | 3 | 6 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-14 | ERA5 (final) | 0.0 | 0.0 | 33.5 | 5.6 | 29.9 |  | 6 | 6 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-15 | ERA5 (final) | 0.0 | 0.0 | 36.6 | 5.4 | 31.7 |  | 3 | 5 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-16 | ERA5 (final) | 0.0 | 0.0 | 39.4 | 7.1 | 30.2 | heat above 1-in-10-day | 1 | 3 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-17 | ERA5 (final) | 0.0 | 0.0 | 34.6 | 7.2 | 29.2 |  | 5 | 0 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-18 | ERA5 (final) | 0.0 | 0.0 | 34.0 | 7.3 | 29.3 |  | 3 | 5 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-19 | ERA5 (final) | 0.0 | 0.0 | 35.4 | 5.7 | 28.4 |  | 5 | 0 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-20 | ERA5 (final) | 0.0 | 0.0 | 36.0 | 7.8 | 28.0 |  | 7 | 2 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-21 | ERA5 (final) | 0.0 | 0.0 | 36.7 | 6.9 | 29.1 |  | 5 | 1 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-22 | ERA5 (final) | 0.0 | 0.0 | 37.3 | 5.9 | 30.6 | heat above 1-in-10-day | 4 | 2 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-23 | ERA5 (final) | 0.0 | 0.0 | 35.9 | 8.2 | 28.8 |  | 5 | 0 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-24 | ERA5 (final) | 0.0 | 0.0 | 35.6 | 6.9 | 27.3 |  | 8 | 0 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-25 | ERA5 (final) | 0.0 | 0.0 | 35.8 | 6.5 | 27.2 |  | 8 | 0 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-26 | ERA5 (final) | 0.0 | 0.0 | 36.1 | 7.7 | 27.2 |  | 8 | 1 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-27 | ERA5 (final) | 0.0 | 0.0 | 35.8 | 6.7 | 29.8 |  | 5 | 3 | 8 | 8 | 8 | 8 | 8 |
| 2026-02-28 | ERA5 (final) | 0.0 | 0.0 | 35.8 | 6.8 | 28.0 |  | 8 | 1 | 8 | 8 | 8 | 8 | 8 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*