Site 9.0765, 7.3986. 30 of 30 days recorded, 30 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 12.8 mm against a pro-rata normal of 52 mm (24 % of normal; full-month normal 52 mm, 1991-2020).
- Rain days (1 mm or more): 5 against a pro-rata normal of 9.4.
- Heavy rain days (above the site's 1-in-10-day amount, 6 mm): 0; exceptional (above 1-in-100-day, 18 mm): 0.
- Days with gusts above the 1-in-10-day value (9 m/s): 3; days hotter than the 1-in-10-day maximum (37.1 °C): 1.
- Working hours lost to weather (caution or stop): outdoor labour 152 h, concrete pour 59 h, asphalt & surfacing 19 h, crane lifts 0 h, work at height 3 h, painting & coatings 33 h, earthworks 1 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-04-01 | ERA5 (final) | 0.0 | 0.0 | 35.6 | 5.0 | 31.2 |  | 2 | 5 | 8 | 8 | 8 | 8 | 8 |
| 2026-04-02 | ERA5 (final) | 0.4 | 0.2 | 28.8 | 7.5 | 26.4 |  | 8 | 6 | 5 | 8 | 8 | 8 | 8 |
| 2026-04-03 | ERA5 (final) | 0.0 | 0.0 | 32.4 | 6.3 | 29.6 |  | 3 | 7 | 8 | 8 | 8 | 8 | 8 |
| 2026-04-04 | ERA5 (final) | 0.3 | 0.2 | 31.0 | 5.2 | 27.4 |  | 8 | 8 | 8 | 8 | 8 | 7 | 8 |
| 2026-04-05 | ERA5 (final) | 0.0 | 0.0 | 35.6 | 5.6 | 30.6 |  | 3 | 6 | 8 | 8 | 8 | 8 | 8 |
| 2026-04-06 | ERA5 (final) | 0.0 | 0.0 | 35.3 | 8.3 | 30.4 |  | 2 | 4 | 8 | 8 | 8 | 8 | 8 |
| 2026-04-07 | ERA5 (final) | 1.2 | 1.0 | 35.9 | 8.8 | 32.4 |  | 1 | 5 | 8 | 8 | 8 | 8 | 8 |
| 2026-04-08 | ERA5 (final) | 1.2 | 0.7 | 30.5 | 9.9 | 28.1 | gust above 1-in-10-day | 6 | 8 | 4 | 8 | 7 | 5 | 8 |
| 2026-04-09 | ERA5 (final) | 0.4 | 0.3 | 33.9 | 9.7 | 29.3 | gust above 1-in-10-day | 3 | 3 | 4 | 8 | 8 | 7 | 8 |
| 2026-04-10 | ERA5 (final) | 0.0 | 0.0 | 37.2 | 5.2 | 30.6 | heat above 1-in-10-day | 3 | 4 | 8 | 8 | 8 | 7 | 8 |
| 2026-04-11 | ERA5 (final) | 0.0 | 0.0 | 36.0 | 5.1 | 31.5 |  | 1 | 7 | 8 | 8 | 8 | 8 | 8 |
| 2026-04-12 | ERA5 (final) | 0.0 | 0.0 | 35.6 | 6.7 | 32.2 |  | 2 | 8 | 8 | 8 | 8 | 7 | 8 |
| 2026-04-13 | ERA5 (final) | 0.0 | 0.0 | 35.2 | 7.6 | 31.1 |  | 2 | 6 | 8 | 8 | 8 | 7 | 8 |
| 2026-04-14 | ERA5 (final) | 0.1 | 0.1 | 34.7 | 7.5 | 30.6 |  | 3 | 5 | 8 | 8 | 8 | 6 | 8 |
| 2026-04-15 | ERA5 (final) | 4.1 | 3.0 | 34.9 | 8.1 | 30.7 |  | 3 | 5 | 8 | 8 | 8 | 6 | 8 |
| 2026-04-16 | ERA5 (final) | 0.0 | 0.0 | 33.4 | 7.3 | 30.0 |  | 3 | 5 | 8 | 8 | 8 | 7 | 8 |
| 2026-04-17 | ERA5 (final) | 1.2 | 0.9 | 34.8 | 6.6 | 33.0 |  | 2 | 7 | 5 | 8 | 6 | 4 | 7 |
| 2026-04-18 | ERA5 (final) | 0.9 | 0.5 | 35.5 | 6.0 | 32.3 |  | 2 | 8 | 8 | 8 | 8 | 8 | 8 |
| 2026-04-19 | ERA5 (final) | 0.0 | 0.0 | 33.7 | 6.2 | 31.2 |  | 2 | 5 | 8 | 8 | 8 | 6 | 8 |
| 2026-04-20 | ERA5 (final) | 0.0 | 0.0 | 36.0 | 8.0 | 31.8 |  | 1 | 5 | 8 | 8 | 8 | 7 | 8 |
| 2026-04-21 | ERA5 (final) | 0.0 | 0.0 | 36.1 | 6.2 | 30.8 |  | 1 | 5 | 8 | 8 | 8 | 8 | 8 |
| 2026-04-22 | ERA5 (final) | 0.0 | 0.0 | 35.4 | 5.6 | 32.6 |  | 1 | 7 | 8 | 8 | 8 | 7 | 8 |
| 2026-04-23 | ERA5 (final) | 0.0 | 0.0 | 36.6 | 7.1 | 32.7 |  | 1 | 7 | 8 | 8 | 8 | 7 | 8 |
| 2026-04-24 | ERA5 (final) | 0.8 | 0.6 | 33.8 | 9.2 | 30.1 | gust above 1-in-10-day | 3 | 5 | 5 | 8 | 8 | 5 | 8 |
| 2026-04-25 | ERA5 (final) | 1.4 | 0.8 | 33.1 | 7.5 | 29.1 |  | 3 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-04-26 | ERA5 (final) | 0.1 | 0.1 | 31.7 | 6.4 | 28.4 |  | 7 | 5 | 8 | 8 | 8 | 6 | 8 |
| 2026-04-27 | ERA5 (final) | 0.1 | 0.1 | 32.7 | 4.8 | 29.8 |  | 5 | 8 | 6 | 8 | 8 | 8 | 8 |
| 2026-04-28 | ERA5 (final) | 0.0 | 0.0 | 34.8 | 5.5 | 31.3 |  | 1 | 7 | 8 | 8 | 8 | 8 | 8 |
| 2026-04-29 | ERA5 (final) | 0.1 | 0.1 | 34.6 | 7.1 | 30.8 |  | 3 | 4 | 8 | 8 | 8 | 6 | 8 |
| 2026-04-30 | ERA5 (final) | 0.5 | 0.3 | 33.6 | 7.0 | 31.1 |  | 3 | 8 | 8 | 8 | 8 | 7 | 8 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*