Site 9.0765, 7.3986. 31 of 31 days recorded, 31 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 214.2 mm against a pro-rata normal of 314 mm (68 % of normal; full-month normal 314 mm, 1991-2020).
- Rain days (1 mm or more): 27 against a pro-rata normal of 29.2.
- Heavy rain days (above the site's 1-in-10-day amount, 21 mm): 3; exceptional (above 1-in-100-day, 58 mm): 0.
- Days with gusts above the 1-in-10-day value (9 m/s): 0; days hotter than the 1-in-10-day maximum (28.9 °C): 19.
- Working hours lost to weather (caution or stop): outdoor labour 72 h, concrete pour 44 h, asphalt & surfacing 186 h, crane lifts 0 h, work at height 87 h, painting & coatings 177 h, earthworks 119 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-08-01 | ERA5 (final) | 22.6 | 6.3 | 26.4 | 6.4 | 26.4 | rain heavy (above 1-in-10-day) | 8 | 0 | 0 | 8 | 0 | 0 | 0 |
| 2026-08-02 | ERA5 (final) | 28.2 | 4.8 | 27.2 | 8.2 | 27.3 | rain heavy (above 1-in-10-day) | 8 | 4 | 0 | 8 | 1 | 0 | 0 |
| 2026-08-03 | ERA5 (final) | 12.3 | 1.7 | 26.5 | 4.8 | 26.4 |  | 8 | 3 | 0 | 8 | 2 | 0 | 0 |
| 2026-08-04 | ERA5 (final) | 2.9 | 1.3 | 30.5 | 5.7 | 29.5 | heat above 1-in-10-day | 3 | 8 | 2 | 8 | 7 | 4 | 8 |
| 2026-08-05 | ERA5 (final) | 6.6 | 2.1 | 28.4 | 6.6 | 28.9 |  | 6 | 7 | 4 | 8 | 7 | 3 | 7 |
| 2026-08-06 | ERA5 (final) | 6.1 | 2.2 | 29.3 | 6.6 | 28.4 | heat above 1-in-10-day | 6 | 8 | 0 | 8 | 6 | 3 | 0 |
| 2026-08-07 | ERA5 (final) | 10.2 | 2.1 | 30.2 | 6.0 | 29.4 | heat above 1-in-10-day | 5 | 6 | 2 | 8 | 5 | 1 | 0 |
| 2026-08-08 | ERA5 (final) | 11.2 | 2.0 | 27.3 | 5.9 | 27.0 |  | 8 | 4 | 0 | 8 | 1 | 0 | 0 |
| 2026-08-09 | ERA5 (final) | 0.5 | 0.1 | 30.1 | 5.3 | 28.9 | heat above 1-in-10-day | 3 | 8 | 2 | 8 | 8 | 5 | 6 |
| 2026-08-10 | ERA5 (final) | 1.3 | 0.4 | 28.7 | 5.6 | 27.8 |  | 8 | 8 | 5 | 8 | 6 | 1 | 7 |
| 2026-08-11 | ERA5 (final) | 9.3 | 3.1 | 27.8 | 6.2 | 27.6 |  | 8 | 5 | 1 | 8 | 2 | 0 | 4 |
| 2026-08-12 | ERA5 (final) | 2.7 | 0.6 | 29.5 | 6.4 | 29.4 | heat above 1-in-10-day | 4 | 8 | 2 | 8 | 8 | 3 | 2 |
| 2026-08-13 | ERA5 (final) | 7.8 | 1.1 | 26.6 | 5.8 | 26.7 |  | 8 | 2 | 0 | 8 | 1 | 0 | 0 |
| 2026-08-14 | ERA5 (final) | 4.2 | 1.3 | 29.3 | 7.0 | 28.7 | heat above 1-in-10-day | 6 | 7 | 1 | 8 | 3 | 1 | 5 |
| 2026-08-15 | ERA5 (final) | 6.8 | 3.1 | 28.3 | 6.1 | 28.6 |  | 7 | 6 | 2 | 8 | 3 | 1 | 6 |
| 2026-08-16 | ERA5 (final) | 1.2 | 0.2 | 27.8 | 5.6 | 27.3 |  | 8 | 8 | 0 | 8 | 7 | 1 | 2 |
| 2026-08-17 | ERA5 (final) | 3.4 | 1.8 | 29.4 | 4.7 | 29.0 | heat above 1-in-10-day | 4 | 8 | 1 | 8 | 8 | 5 | 8 |
| 2026-08-18 | ERA5 (final) | 23.6 | 5.0 | 30.1 | 8.0 | 30.3 | rain heavy (above 1-in-10-day); heat above 1-in-10-day | 3 | 7 | 0 | 8 | 7 | 2 | 0 |
| 2026-08-19 | ERA5 (final) | 2.2 | 0.7 | 29.6 | 7.8 | 29.0 | heat above 1-in-10-day | 5 | 7 | 0 | 8 | 5 | 3 | 0 |
| 2026-08-20 | ERA5 (final) | 5.2 | 1.4 | 29.9 | 4.7 | 30.6 | heat above 1-in-10-day | 3 | 8 | 1 | 8 | 5 | 3 | 8 |
| 2026-08-21 | ERA5 (final) | 16.4 | 2.9 | 27.7 | 5.6 | 27.8 |  | 8 | 2 | 0 | 8 | 1 | 0 | 0 |
| 2026-08-22 | ERA5 (final) | 2.3 | 1.0 | 30.4 | 6.6 | 29.5 | heat above 1-in-10-day | 3 | 8 | 1 | 8 | 8 | 4 | 4 |
| 2026-08-23 | ERA5 (final) | 0.2 | 0.1 | 30.1 | 4.9 | 28.6 | heat above 1-in-10-day | 6 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-08-24 | ERA5 (final) | 3.1 | 1.6 | 29.6 | 5.6 | 29.3 | heat above 1-in-10-day | 4 | 8 | 2 | 8 | 6 | 3 | 8 |
| 2026-08-25 | ERA5 (final) | 0.1 | 0.1 | 31.3 | 6.1 | 30.4 | heat above 1-in-10-day | 3 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-08-26 | ERA5 (final) | 4.3 | 1.9 | 30.1 | 7.9 | 30.2 | heat above 1-in-10-day | 3 | 8 | 0 | 8 | 2 | 0 | 6 |
| 2026-08-27 | ERA5 (final) | 6.7 | 2.5 | 26.7 | 8.0 | 27.9 |  | 8 | 8 | 2 | 8 | 6 | 0 | 8 |
| 2026-08-28 | ERA5 (final) | 9.5 | 1.9 | 29.0 | 7.2 | 28.3 | heat above 1-in-10-day | 7 | 8 | 0 | 8 | 6 | 3 | 0 |
| 2026-08-29 | ERA5 (final) | 0.5 | 0.4 | 30.5 | 4.8 | 29.7 | heat above 1-in-10-day | 3 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-08-30 | ERA5 (final) | 1.1 | 0.8 | 30.2 | 5.2 | 28.2 | heat above 1-in-10-day | 8 | 8 | 5 | 8 | 8 | 5 | 8 |
| 2026-08-31 | ERA5 (final) | 1.7 | 0.9 | 31.1 | 7.1 | 30.6 | heat above 1-in-10-day | 4 | 8 | 5 | 8 | 8 | 5 | 8 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*