# Site weather record · Abuja · October 2026

Site 9.0765, 7.3986. 31 of 31 days recorded, 31 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 65.1 mm against a pro-rata normal of 137 mm (48 % of normal; full-month normal 137 mm, 1991-2020).
- Rain days (1 mm or more): 9 against a pro-rata normal of 20.8.
- Heavy rain days (above the site's 1-in-10-day amount, 11 mm): 2; exceptional (above 1-in-100-day, 22 mm): 0.
- Days with gusts above the 1-in-10-day value (9 m/s): 0; days hotter than the 1-in-10-day maximum (31.9 °C): 16.
- Working hours lost to weather (caution or stop): outdoor labour 176 h, concrete pour 16 h, asphalt & surfacing 49 h, crane lifts 0 h, work at height 16 h, painting & coatings 105 h, earthworks 57 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-10-01 | ERA5 (final) | 1.1 | 0.2 | 28.7 | 5.7 | 28.0 |  | 8 | 8 | 0 | 8 | 7 | 4 | 0 |
| 2026-10-02 | ERA5 (final) | 14.4 | 4.5 | 30.5 | 7.3 | 29.7 | rain heavy (above 1-in-10-day) | 4 | 6 | 3 | 8 | 6 | 3 | 6 |
| 2026-10-03 | ERA5 (final) | 0.3 | 0.2 | 28.8 | 7.2 | 27.4 |  | 8 | 8 | 4 | 8 | 8 | 4 | 0 |
| 2026-10-04 | ERA5 (final) | 12.3 | 5.1 | 31.1 | 8.9 | 30.9 | rain heavy (above 1-in-10-day) | 1 | 5 | 3 | 8 | 5 | 2 | 5 |
| 2026-10-05 | ERA5 (final) | 7.5 | 3.7 | 28.3 | 6.1 | 28.6 |  | 6 | 6 | 3 | 8 | 4 | 0 | 0 |
| 2026-10-06 | ERA5 (final) | 0.2 | 0.1 | 29.0 | 6.2 | 29.0 |  | 6 | 8 | 8 | 8 | 8 | 4 | 2 |
| 2026-10-07 | ERA5 (final) | 8.6 | 2.1 | 29.8 | 7.9 | 30.3 |  | 2 | 7 | 7 | 8 | 7 | 3 | 7 |
| 2026-10-08 | ERA5 (final) | 0.7 | 0.3 | 29.9 | 6.4 | 29.2 |  | 3 | 8 | 8 | 8 | 8 | 5 | 0 |
| 2026-10-09 | ERA5 (final) | 0.1 | 0.1 | 31.5 | 6.9 | 30.3 |  | 1 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-10-10 | ERA5 (final) | 1.9 | 1.1 | 31.6 | 5.2 | 31.1 |  | 2 | 7 | 6 | 8 | 7 | 4 | 7 |
| 2026-10-11 | ERA5 (final) | 0.4 | 0.3 | 31.1 | 5.1 | 30.7 |  | 2 | 8 | 5 | 8 | 8 | 5 | 8 |
| 2026-10-12 | ERA5 (final) | 0.7 | 0.2 | 31.8 | 6.8 | 30.5 |  | 2 | 8 | 2 | 8 | 8 | 5 | 8 |
| 2026-10-13 | ERA5 (final) | 3.7 | 2.2 | 30.5 | 8.9 | 30.7 |  | 2 | 6 | 3 | 8 | 6 | 3 | 6 |
| 2026-10-14 | ERA5 (final) | 6.9 | 3.0 | 31.6 | 7.9 | 31.0 |  | 1 | 7 | 7 | 8 | 7 | 4 | 7 |
| 2026-10-15 | ERA5 (final) | 0.6 | 0.3 | 29.6 | 5.5 | 28.5 |  | 5 | 8 | 8 | 8 | 8 | 5 | 0 |
| 2026-10-16 | ERA5 (final) | 0.0 | 0.0 | 32.3 | 4.2 | 31.7 | heat above 1-in-10-day | 0 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-10-17 | ERA5 (final) | 0.5 | 0.3 | 32.4 | 6.6 | 31.4 | heat above 1-in-10-day | 1 | 8 | 5 | 8 | 8 | 5 | 8 |
| 2026-10-18 | ERA5 (final) | 0.1 | 0.1 | 31.9 | 7.0 | 30.9 | heat above 1-in-10-day | 2 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-10-19 | ERA5 (final) | 0.3 | 0.2 | 32.9 | 6.7 | 31.7 | heat above 1-in-10-day | 1 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-10-20 | ERA5 (final) | 0.0 | 0.0 | 34.0 | 6.3 | 32.2 | heat above 1-in-10-day | 1 | 8 | 8 | 8 | 8 | 6 | 8 |
| 2026-10-21 | ERA5 (final) | 0.0 | 0.0 | 32.4 | 3.9 | 31.4 | heat above 1-in-10-day | 1 | 8 | 8 | 8 | 8 | 6 | 8 |
| 2026-10-22 | ERA5 (final) | 0.1 | 0.1 | 32.6 | 4.7 | 31.4 | heat above 1-in-10-day | 1 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-10-23 | ERA5 (final) | 0.0 | 0.0 | 33.2 | 4.7 | 31.6 | heat above 1-in-10-day | 1 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-10-24 | ERA5 (final) | 0.0 | 0.0 | 33.1 | 4.6 | 30.9 | heat above 1-in-10-day | 1 | 8 | 8 | 8 | 8 | 6 | 8 |
| 2026-10-25 | ERA5 (final) | 0.2 | 0.2 | 32.5 | 5.8 | 31.1 | heat above 1-in-10-day | 1 | 8 | 8 | 8 | 8 | 7 | 8 |
| 2026-10-26 | ERA5 (final) | 0.0 | 0.0 | 33.6 | 5.1 | 31.6 | heat above 1-in-10-day | 1 | 8 | 8 | 8 | 8 | 7 | 8 |
| 2026-10-27 | ERA5 (final) | 3.6 | 1.7 | 33.1 | 6.3 | 31.4 | heat above 1-in-10-day | 2 | 7 | 7 | 8 | 7 | 4 | 7 |
| 2026-10-28 | ERA5 (final) | 0.0 | 0.0 | 33.7 | 6.0 | 32.6 | heat above 1-in-10-day | 1 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-10-29 | ERA5 (final) | 0.0 | 0.0 | 34.6 | 7.9 | 32.1 | heat above 1-in-10-day | 1 | 5 | 8 | 8 | 8 | 5 | 8 |
| 2026-10-30 | ERA5 (final) | 0.8 | 0.6 | 34.5 | 8.2 | 31.9 | heat above 1-in-10-day | 1 | 8 | 8 | 8 | 8 | 6 | 8 |
| 2026-10-31 | ERA5 (final) | 0.1 | 0.1 | 34.0 | 6.3 | 31.8 | heat above 1-in-10-day | 3 | 8 | 8 | 8 | 8 | 5 | 8 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*
