# Site weather record · Abuja · November 2026

Site 9.0765, 7.3986. 13 of 30 days recorded, 6 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 8.2 mm against a pro-rata normal of 4 mm (198 % of normal; full-month normal 10 mm, 1991-2020).
- Rain days (1 mm or more): 1 against a pro-rata normal of 0.8.
- Heavy rain days (above the site's 1-in-10-day amount, 0 mm): 0; exceptional (above 1-in-100-day, 8 mm): 1.
- Days with gusts above the 1-in-10-day value (8 m/s): 0; days hotter than the 1-in-10-day maximum (34.5 °C): 1.
- Working hours lost to weather (caution or stop): outdoor labour 50 h, concrete pour 34 h, asphalt & surfacing 3 h, crane lifts 0 h, work at height 3 h, painting & coatings 18 h, earthworks 9 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-11-01 | ERA5 (final) | 0.1 | 0.1 | 34.1 | 6.7 | 32.2 |  | 1 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-11-02 | ERA5 (final) | 8.1 | 2.8 | 32.9 | 7.1 | 32.9 | rain exceptional (above 1-in-100-day) | 1 | 5 | 5 | 8 | 5 | 2 | 5 |
| 2026-11-03 | ERA5 (final) | 0.0 | 0.0 | 34.5 | 6.7 | 32.1 | heat above 1-in-10-day | 2 | 6 | 8 | 8 | 8 | 5 | 2 |
| 2026-11-04 | ERA5 (final) | 0.0 | 0.0 | 32.6 | 6.1 | 31.0 |  | 2 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-11-05 | ERA5 (final) | 0.0 | 0.0 | 33.5 | 4.3 | 32.2 |  | 2 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-11-12 | ERA5 (final) | 0.0 | 0.0 | 34.3 | 4.5 | 30.0 |  | 2 | 8 | 8 | 8 | 8 | 8 | 8 |
| 2026-11-13 | model analysis (preliminary) | 0.0 | 0.0 | 32.2 | 5.5 | 29.0 |  | 6 | 8 | 8 | 8 | 8 | 8 | 8 |
| 2026-11-14 | model analysis (preliminary) | 0.0 | 0.0 | 32.0 | 5.7 | 27.6 |  | 8 | 4 | 8 | 8 | 8 | 8 | 8 |
| 2026-11-15 | model analysis (preliminary) | 0.0 | 0.0 | 33.5 | 6.8 | 27.2 |  | 8 | 1 | 8 | 8 | 8 | 8 | 8 |
| 2026-11-16 | model analysis (preliminary) | 0.0 | 0.0 | 33.7 | 6.3 | 26.8 |  | 8 | 0 | 8 | 8 | 8 | 8 | 8 |
| 2026-11-17 | model analysis (preliminary) | 0.0 | 0.0 | 33.0 | 4.7 | 29.3 |  | 4 | 6 | 8 | 8 | 8 | 8 | 8 |
| 2026-11-18 | model analysis (preliminary) | 0.0 | 0.0 | 33.7 | 4.9 | 29.1 |  | 3 | 7 | 8 | 8 | 8 | 8 | 8 |
| 2026-11-19 | model analysis (preliminary) | 0.0 | 0.0 | 34.0 | 6.1 | 28.4 |  | 7 | 1 | 8 | 8 | 8 | 8 | 8 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*