# Site weather record · Accra · May 2026

Site 5.6037, -0.1870. 31 of 31 days recorded, 31 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 139.4 mm against a pro-rata normal of 108 mm (129 % of normal; full-month normal 108 mm, 1991-2020).
- Rain days (1 mm or more): 24 against a pro-rata normal of 19.9.
- Heavy rain days (above the site's 1-in-10-day amount, 9 mm): 5; exceptional (above 1-in-100-day, 22 mm): 0.
- Days with gusts above the 1-in-10-day value (10 m/s): 2; days hotter than the 1-in-10-day maximum (33.3 °C): 1.
- Working hours lost to weather (caution or stop): outdoor labour 177 h, concrete pour 36 h, asphalt & surfacing 193 h, crane lifts 0 h, work at height 92 h, painting & coatings 175 h, earthworks 111 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-05-01 | ERA5 (final) | 0.0 | 0.0 | 32.5 | 8.6 | 31.1 |  | 0 | 7 | 8 | 8 | 8 | 7 | 8 |
| 2026-05-02 | ERA5 (final) | 1.5 | 0.7 | 32.7 | 9.5 | 31.2 |  | 0 | 5 | 2 | 8 | 6 | 4 | 6 |
| 2026-05-03 | ERA5 (final) | 0.8 | 0.2 | 32.1 | 9.5 | 31.5 |  | 0 | 8 | 0 | 8 | 7 | 3 | 8 |
| 2026-05-04 | ERA5 (final) | 0.4 | 0.2 | 32.5 | 8.1 | 32.9 |  | 0 | 8 | 5 | 8 | 7 | 5 | 8 |
| 2026-05-05 | ERA5 (final) | 0.4 | 0.4 | 33.4 | 10.0 | 31.4 | heat above 1-in-10-day | 0 | 5 | 6 | 8 | 7 | 5 | 7 |
| 2026-05-06 | ERA5 (final) | 2.6 | 0.4 | 29.5 | 9.4 | 30.1 |  | 3 | 8 | 0 | 8 | 4 | 0 | 6 |
| 2026-05-07 | ERA5 (final) | 4.0 | 2.2 | 32.0 | 9.1 | 31.6 |  | 1 | 7 | 3 | 8 | 6 | 4 | 7 |
| 2026-05-08 | ERA5 (final) | 7.0 | 6.0 | 31.9 | 8.3 | 32.0 |  | 3 | 8 | 0 | 8 | 8 | 3 | 5 |
| 2026-05-09 | ERA5 (final) | 1.6 | 0.4 | 32.0 | 8.6 | 30.8 |  | 1 | 8 | 1 | 8 | 5 | 2 | 2 |
| 2026-05-10 | ERA5 (final) | 0.6 | 0.2 | 32.7 | 8.3 | 31.8 |  | 0 | 8 | 3 | 8 | 8 | 6 | 8 |
| 2026-05-11 | ERA5 (final) | 2.6 | 0.5 | 31.7 | 10.5 | 30.2 | gust above 1-in-10-day | 0 | 6 | 0 | 8 | 2 | 1 | 6 |
| 2026-05-12 | ERA5 (final) | 0.6 | 0.1 | 32.9 | 8.3 | 31.6 |  | 0 | 8 | 3 | 8 | 8 | 6 | 8 |
| 2026-05-13 | ERA5 (final) | 1.7 | 0.3 | 32.8 | 8.7 | 31.6 |  | 0 | 8 | 1 | 8 | 4 | 2 | 6 |
| 2026-05-14 | ERA5 (final) | 4.6 | 2.3 | 32.7 | 11.1 | 31.1 | gust above 1-in-10-day | 0 | 5 | 0 | 8 | 2 | 0 | 5 |
| 2026-05-15 | ERA5 (final) | 6.8 | 5.0 | 28.8 | 9.4 | 28.0 |  | 8 | 5 | 0 | 8 | 5 | 0 | 2 |
| 2026-05-16 | ERA5 (final) | 3.6 | 2.6 | 32.5 | 7.5 | 31.1 |  | 2 | 8 | 3 | 8 | 5 | 3 | 3 |
| 2026-05-17 | ERA5 (final) | 4.2 | 1.4 | 32.1 | 10.0 | 31.2 |  | 0 | 7 | 4 | 8 | 6 | 4 | 7 |
| 2026-05-18 | ERA5 (final) | 14.1 | 5.3 | 30.6 | 8.0 | 30.6 | rain heavy (above 1-in-10-day) | 4 | 6 | 1 | 8 | 3 | 1 | 2 |
| 2026-05-19 | ERA5 (final) | 5.4 | 1.9 | 32.1 | 8.2 | 32.0 |  | 3 | 6 | 0 | 8 | 2 | 1 | 0 |
| 2026-05-20 | ERA5 (final) | 15.0 | 7.5 | 29.7 | 7.0 | 29.4 | rain heavy (above 1-in-10-day) | 6 | 6 | 1 | 8 | 2 | 0 | 3 |
| 2026-05-21 | ERA5 (final) | 10.6 | 5.1 | 29.7 | 7.1 | 29.5 | rain heavy (above 1-in-10-day) | 3 | 7 | 0 | 8 | 4 | 0 | 0 |
| 2026-05-22 | ERA5 (final) | 6.3 | 2.3 | 28.9 | 7.8 | 28.9 |  | 5 | 7 | 2 | 8 | 5 | 0 | 1 |
| 2026-05-23 | ERA5 (final) | 12.0 | 6.7 | 30.3 | 7.6 | 29.4 | rain heavy (above 1-in-10-day) | 2 | 6 | 0 | 8 | 2 | 0 | 0 |
| 2026-05-24 | ERA5 (final) | 1.7 | 0.8 | 32.4 | 6.8 | 31.1 |  | 1 | 7 | 1 | 8 | 6 | 4 | 2 |
| 2026-05-25 | ERA5 (final) | 19.8 | 4.7 | 27.2 | 6.3 | 26.8 | rain heavy (above 1-in-10-day) | 8 | 3 | 0 | 8 | 0 | 0 | 0 |
| 2026-05-26 | ERA5 (final) | 1.6 | 0.5 | 28.4 | 5.3 | 28.2 |  | 5 | 8 | 0 | 8 | 6 | 1 | 0 |
| 2026-05-27 | ERA5 (final) | 1.1 | 0.4 | 30.9 | 6.8 | 30.6 |  | 2 | 8 | 3 | 8 | 5 | 3 | 7 |
| 2026-05-28 | ERA5 (final) | 5.4 | 3.3 | 28.2 | 7.6 | 27.9 |  | 8 | 6 | 1 | 8 | 4 | 0 | 2 |
| 2026-05-29 | ERA5 (final) | 1.4 | 0.4 | 31.3 | 7.0 | 30.8 |  | 2 | 8 | 0 | 8 | 6 | 4 | 4 |
| 2026-05-30 | ERA5 (final) | 0.3 | 0.1 | 31.5 | 8.3 | 31.6 |  | 2 | 8 | 4 | 8 | 8 | 4 | 8 |
| 2026-05-31 | ERA5 (final) | 1.7 | 0.5 | 30.7 | 8.8 | 30.1 |  | 2 | 7 | 3 | 8 | 5 | 0 | 6 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*