# Site weather record · Accra · November 2026

Site 5.6037, -0.1870. 13 of 30 days recorded, 6 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 22.8 mm against a pro-rata normal of 24 mm (96 % of normal; full-month normal 55 mm, 1991-2020).
- Rain days (1 mm or more): 5 against a pro-rata normal of 6.7.
- Heavy rain days (above the site's 1-in-10-day amount, 5 mm): 2; exceptional (above 1-in-100-day, 12 mm): 0.
- Days with gusts above the 1-in-10-day value (9 m/s): 7; days hotter than the 1-in-10-day maximum (32.7 °C): 5.
- Working hours lost to weather (caution or stop): outdoor labour 98 h, concrete pour 35 h, asphalt & surfacing 53 h, crane lifts 0 h, work at height 27 h, painting & coatings 34 h, earthworks 20 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-11-01 | ERA5 (final) | 0.6 | 0.3 | 31.9 | 8.0 | 31.2 |  | 0 | 6 | 5 | 8 | 6 | 4 | 7 |
| 2026-11-02 | ERA5 (final) | 0.4 | 0.4 | 32.7 | 8.7 | 32.6 | heat above 1-in-10-day | 0 | 8 | 5 | 8 | 7 | 5 | 7 |
| 2026-11-03 | ERA5 (final) | 7.4 | 5.3 | 31.6 | 8.3 | 30.6 | rain heavy (above 1-in-10-day) | 2 | 5 | 4 | 8 | 5 | 3 | 5 |
| 2026-11-04 | ERA5 (final) | 5.1 | 2.9 | 32.4 | 8.7 | 32.0 | rain heavy (above 1-in-10-day) | 1 | 6 | 2 | 8 | 4 | 3 | 1 |
| 2026-11-05 | ERA5 (final) | 0.9 | 0.4 | 32.7 | 8.0 | 31.8 | heat above 1-in-10-day | 0 | 7 | 3 | 8 | 6 | 4 | 4 |
| 2026-11-12 | ERA5 (final) | 2.5 | 1.2 | 31.2 | 6.8 | 30.8 |  | 2 | 8 | 2 | 8 | 8 | 5 | 8 |
| 2026-11-13 | model analysis (preliminary) | 0.1 | 0.1 | 31.7 | 10.9 | 29.8 | gust above 1-in-10-day | 1 | 5 | 6 | 8 | 8 | 7 | 8 |
| 2026-11-14 | model analysis (preliminary) | 0.5 | 0.4 | 32.5 | 10.9 | 29.9 | gust above 1-in-10-day | 0 | 4 | 3 | 8 | 7 | 7 | 7 |
| 2026-11-15 | model analysis (preliminary) | 0.0 | 0.0 | 32.2 | 11.6 | 30.0 | gust above 1-in-10-day | 0 | 4 | 8 | 8 | 4 | 8 | 8 |
| 2026-11-16 | model analysis (preliminary) | 1.3 | 0.4 | 33.2 | 11.8 | 30.9 | gust above 1-in-10-day; heat above 1-in-10-day | 0 | 3 | 3 | 8 | 3 | 5 | 7 |
| 2026-11-17 | model analysis (preliminary) | 0.7 | 0.3 | 33.4 | 11.8 | 30.8 | gust above 1-in-10-day; heat above 1-in-10-day | 0 | 3 | 4 | 8 | 5 | 7 | 7 |
| 2026-11-18 | model analysis (preliminary) | 2.5 | 2.0 | 33.1 | 10.9 | 30.6 | gust above 1-in-10-day; heat above 1-in-10-day | 0 | 3 | 2 | 8 | 7 | 6 | 7 |
| 2026-11-19 | model analysis (preliminary) | 0.8 | 0.2 | 32.2 | 10.6 | 30.9 | gust above 1-in-10-day | 0 | 7 | 4 | 8 | 7 | 6 | 8 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*