Site -19.8436, 34.8389. 28 of 28 days recorded, 28 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 45.8 mm against a pro-rata normal of 158 mm (29 % of normal; full-month normal 158 mm, 1991-2020).
- Rain days (1 mm or more): 8 against a pro-rata normal of 17.2.
- Heavy rain days (above the site's 1-in-10-day amount, 17 mm): 1; exceptional (above 1-in-100-day, 44 mm): 0.
- Days with gusts above the 1-in-10-day value (12 m/s): 2; days hotter than the 1-in-10-day maximum (33.8 °C): 4.
- Working hours lost to weather (caution or stop): outdoor labour 173 h, concrete pour 103 h, asphalt & surfacing 123 h, crane lifts 0 h, work at height 34 h, painting & coatings 61 h, earthworks 33 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-02-01 | ERA5 (final) | 0.1 | 0.1 | 33.3 | 9.3 | 28.8 |  | 3 | 2 | 6 | 8 | 8 | 8 | 8 |
| 2026-02-02 | ERA5 (final) | 0.7 | 0.1 | 32.5 | 8.0 | 29.8 |  | 0 | 3 | 1 | 8 | 8 | 8 | 8 |
| 2026-02-03 | ERA5 (final) | 1.7 | 0.3 | 32.1 | 8.6 | 29.8 |  | 1 | 4 | 0 | 8 | 4 | 2 | 7 |
| 2026-02-04 | ERA5 (final) | 1.6 | 0.3 | 31.7 | 8.3 | 29.3 |  | 1 | 5 | 0 | 8 | 8 | 4 | 8 |
| 2026-02-05 | ERA5 (final) | 1.2 | 0.2 | 32.4 | 9.0 | 29.7 |  | 2 | 5 | 1 | 8 | 6 | 5 | 8 |
| 2026-02-06 | ERA5 (final) | 0.4 | 0.1 | 32.8 | 9.1 | 30.3 |  | 0 | 5 | 2 | 8 | 8 | 7 | 8 |
| 2026-02-07 | ERA5 (final) | 1.4 | 0.4 | 31.8 | 9.5 | 30.6 |  | 0 | 5 | 0 | 8 | 5 | 5 | 7 |
| 2026-02-08 | ERA5 (final) | 0.1 | 0.1 | 32.4 | 9.5 | 30.1 |  | 0 | 5 | 4 | 8 | 8 | 7 | 8 |
| 2026-02-09 | ERA5 (final) | 0.2 | 0.1 | 32.8 | 7.9 | 29.8 |  | 2 | 4 | 4 | 8 | 8 | 7 | 8 |
| 2026-02-10 | ERA5 (final) | 0.4 | 0.1 | 33.2 | 9.2 | 30.5 |  | 0 | 4 | 2 | 8 | 8 | 8 | 8 |
| 2026-02-11 | ERA5 (final) | 0.5 | 0.1 | 32.8 | 8.0 | 30.9 |  | 0 | 6 | 1 | 8 | 8 | 8 | 8 |
| 2026-02-12 | ERA5 (final) | 0.0 | 0.0 | 33.5 | 7.7 | 31.3 |  | 0 | 4 | 8 | 8 | 8 | 6 | 8 |
| 2026-02-13 | ERA5 (final) | 0.0 | 0.0 | 36.7 | 7.7 | 31.7 | heat above 1-in-10-day | 1 | 3 | 8 | 8 | 8 | 7 | 8 |
| 2026-02-14 | ERA5 (final) | 0.1 | 0.1 | 38.9 | 8.7 | 33.7 | heat above 1-in-10-day | 0 | 1 | 7 | 8 | 8 | 8 | 8 |
| 2026-02-15 | ERA5 (final) | 19.0 | 3.0 | 29.7 | 11.6 | 27.9 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 8 | 3 | 0 | 8 | 3 | 0 | 0 |
| 2026-02-16 | ERA5 (final) | 0.4 | 0.2 | 28.1 | 12.8 | 25.8 | gust above 1-in-10-day | 8 | 1 | 8 | 8 | 1 | 8 | 1 |
| 2026-02-17 | ERA5 (final) | 0.4 | 0.3 | 29.6 | 10.5 | 27.0 |  | 8 | 4 | 8 | 8 | 8 | 6 | 8 |
| 2026-02-18 | ERA5 (final) | 0.2 | 0.1 | 30.5 | 7.2 | 28.7 |  | 2 | 7 | 5 | 8 | 8 | 5 | 8 |
| 2026-02-19 | ERA5 (final) | 4.5 | 3.3 | 33.1 | 8.0 | 32.1 |  | 0 | 6 | 1 | 8 | 6 | 4 | 6 |
| 2026-02-20 | ERA5 (final) | 8.8 | 1.9 | 32.4 | 7.8 | 31.6 |  | 0 | 6 | 0 | 8 | 3 | 1 | 0 |
| 2026-02-21 | ERA5 (final) | 0.8 | 0.2 | 30.8 | 10.2 | 28.7 |  | 2 | 4 | 7 | 8 | 8 | 7 | 3 |
| 2026-02-22 | ERA5 (final) | 0.7 | 0.2 | 31.5 | 9.2 | 28.4 |  | 6 | 3 | 1 | 8 | 6 | 5 | 8 |
| 2026-02-23 | ERA5 (final) | 0.3 | 0.1 | 32.3 | 7.1 | 29.0 |  | 3 | 4 | 4 | 8 | 8 | 7 | 8 |
| 2026-02-24 | ERA5 (final) | 0.0 | 0.0 | 34.0 | 9.3 | 32.0 | heat above 1-in-10-day | 1 | 7 | 8 | 8 | 8 | 7 | 8 |
| 2026-02-25 | ERA5 (final) | 0.0 | 0.0 | 36.0 | 8.3 | 32.2 | heat above 1-in-10-day | 1 | 3 | 8 | 8 | 8 | 7 | 8 |
| 2026-02-26 | ERA5 (final) | 0.5 | 0.2 | 33.7 | 8.9 | 31.4 |  | 0 | 4 | 3 | 8 | 6 | 6 | 8 |
| 2026-02-27 | ERA5 (final) | 0.6 | 0.2 | 32.6 | 8.1 | 30.3 |  | 1 | 5 | 2 | 8 | 7 | 6 | 8 |
| 2026-02-28 | ERA5 (final) | 1.2 | 0.3 | 32.3 | 7.9 | 31.0 |  | 1 | 8 | 2 | 8 | 7 | 4 | 7 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*