# Site weather record · Central Kampala · November 2026

Site 0.3136, 32.5811. 13 of 30 days recorded, 6 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 93.3 mm against a pro-rata normal of 78 mm (120 % of normal; full-month normal 179 mm, 1991-2020).
- Rain days (1 mm or more): 13 against a pro-rata normal of 11.6.
- Heavy rain days (above the site's 1-in-10-day amount, 12 mm): 3; exceptional (above 1-in-100-day, 21 mm): 0.
- Days with gusts above the 1-in-10-day value (8 m/s): 7; days hotter than the 1-in-10-day maximum (25.5 °C): 7.
- Working hours lost to weather (caution or stop): outdoor labour 0 h, concrete pour 24 h, asphalt & surfacing 92 h, crane lifts 0 h, work at height 49 h, painting & coatings 80 h, earthworks 49 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-11-01 | ERA5 (final) | 4.8 | 1.2 | 25.7 | 7.2 | 25.6 | heat above 1-in-10-day | 8 | 5 | 0 | 8 | 1 | 1 | 1 |
| 2026-11-02 | ERA5 (final) | 2.9 | 1.3 | 25.9 | 5.6 | 26.8 | heat above 1-in-10-day | 8 | 7 | 0 | 8 | 6 | 3 | 6 |
| 2026-11-03 | ERA5 (final) | 1.6 | 0.7 | 25.4 | 5.9 | 25.8 |  | 8 | 7 | 0 | 8 | 5 | 1 | 7 |
| 2026-11-04 | ERA5 (final) | 2.5 | 0.9 | 25.4 | 8.6 | 25.0 | gust above 1-in-10-day | 8 | 8 | 0 | 8 | 4 | 2 | 7 |
| 2026-11-11 | ERA5 (final) | 9.2 | 2.6 | 25.3 | 7.3 | 25.7 |  | 8 | 6 | 0 | 8 | 5 | 1 | 6 |
| 2026-11-12 | ERA5 (final) | 8.6 | 0.9 | 22.9 | 6.7 | 24.0 |  | 8 | 4 | 0 | 8 | 2 | 0 | 0 |
| 2026-11-13 | model analysis (preliminary) | 20.2 | 9.4 | 25.4 | 7.8 | 26.0 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 8 | 5 | 1 | 8 | 4 | 2 | 4 |
| 2026-11-14 | model analysis (preliminary) | 13.1 | 3.3 | 25.3 | 8.3 | 26.4 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 8 | 5 | 3 | 8 | 5 | 2 | 5 |
| 2026-11-15 | model analysis (preliminary) | 2.5 | 1.3 | 26.2 | 8.0 | 26.7 | gust above 1-in-10-day; heat above 1-in-10-day | 8 | 6 | 4 | 8 | 5 | 3 | 6 |
| 2026-11-16 | model analysis (preliminary) | 12.3 | 2.8 | 25.5 | 8.9 | 26.1 | rain heavy (above 1-in-10-day); gust above 1-in-10-day; heat above 1-in-10-day | 8 | 5 | 0 | 8 | 3 | 3 | 0 |
| 2026-11-17 | model analysis (preliminary) | 8.5 | 3.0 | 26.1 | 7.6 | 26.5 | gust above 1-in-10-day; heat above 1-in-10-day | 8 | 7 | 0 | 8 | 4 | 3 | 0 |
| 2026-11-18 | model analysis (preliminary) | 4.7 | 3.6 | 25.9 | 6.7 | 26.1 | heat above 1-in-10-day | 8 | 8 | 2 | 8 | 6 | 1 | 6 |
| 2026-11-19 | model analysis (preliminary) | 2.4 | 1.3 | 26.5 | 9.6 | 26.5 | gust above 1-in-10-day; heat above 1-in-10-day | 8 | 7 | 2 | 8 | 5 | 2 | 7 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*