# Site weather record · Dakar · January 2026

Site 14.7167, -17.4677. 31 of 31 days recorded, 31 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 1.6 mm against a pro-rata normal of 2 mm (77 % of normal; full-month normal 2 mm, 1991-2020).
- Rain days (1 mm or more): 0 against a pro-rata normal of 0.2.
- Heavy rain days (above the site's 1-in-10-day amount, 0 mm): 28; exceptional (above 1-in-100-day, 0 mm): 3.
- Days with gusts above the 1-in-10-day value (12 m/s): 1; days hotter than the 1-in-10-day maximum (31.0 °C): 0.
- Working hours lost to weather (caution or stop): outdoor labour 0 h, concrete pour 179 h, asphalt & surfacing 14 h, crane lifts 0 h, work at height 34 h, painting & coatings 38 h, earthworks 1 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-01-01 | ERA5 (final) | 0.0 | 0.0 | 29.2 | 9.2 | 24.4 | rain heavy (above 1-in-10-day) | 8 | 2 | 8 | 8 | 8 | 8 | 8 |
| 2026-01-02 | ERA5 (final) | 0.0 | 0.0 | 26.4 | 9.7 | 23.5 | rain heavy (above 1-in-10-day) | 8 | 3 | 8 | 8 | 8 | 7 | 8 |
| 2026-01-03 | ERA5 (final) | 0.0 | 0.0 | 25.1 | 11.5 | 23.8 | rain heavy (above 1-in-10-day) | 8 | 5 | 8 | 8 | 5 | 4 | 8 |
| 2026-01-04 | ERA5 (final) | 0.0 | 0.0 | 23.3 | 11.4 | 21.9 | rain heavy (above 1-in-10-day) | 8 | 6 | 8 | 8 | 5 | 2 | 8 |
| 2026-01-05 | ERA5 (final) | 0.0 | 0.0 | 23.5 | 11.4 | 22.4 | rain heavy (above 1-in-10-day) | 8 | 7 | 8 | 8 | 5 | 4 | 8 |
| 2026-01-06 | ERA5 (final) | 0.2 | 0.2 | 21.7 | 11.5 | 20.8 | rain heavy (above 1-in-10-day) | 8 | 8 | 4 | 8 | 2 | 0 | 8 |
| 2026-01-07 | ERA5 (final) | 0.6 | 0.3 | 24.9 | 11.2 | 21.9 | rain exceptional (above 1-in-100-day) | 8 | 3 | 3 | 8 | 7 | 5 | 7 |
| 2026-01-08 | ERA5 (final) | 0.4 | 0.2 | 25.4 | 9.5 | 22.3 | rain exceptional (above 1-in-100-day) | 8 | 2 | 8 | 8 | 8 | 7 | 8 |
| 2026-01-09 | ERA5 (final) | 0.4 | 0.1 | 24.4 | 8.9 | 22.5 | rain exceptional (above 1-in-100-day) | 8 | 5 | 3 | 8 | 8 | 7 | 8 |
| 2026-01-10 | ERA5 (final) | 0.0 | 0.0 | 26.2 | 10.6 | 22.5 | rain heavy (above 1-in-10-day) | 8 | 2 | 8 | 8 | 8 | 7 | 8 |
| 2026-01-11 | ERA5 (final) | 0.0 | 0.0 | 25.8 | 9.8 | 22.0 | rain heavy (above 1-in-10-day) | 8 | 2 | 8 | 8 | 8 | 8 | 8 |
| 2026-01-12 | ERA5 (final) | 0.0 | 0.0 | 28.2 | 8.5 | 24.2 | rain heavy (above 1-in-10-day) | 8 | 3 | 8 | 8 | 8 | 7 | 8 |
| 2026-01-13 | ERA5 (final) | 0.0 | 0.0 | 27.7 | 8.7 | 23.9 | rain heavy (above 1-in-10-day) | 8 | 3 | 8 | 8 | 8 | 7 | 8 |
| 2026-01-14 | ERA5 (final) | 0.0 | 0.0 | 27.2 | 10.4 | 22.7 | rain heavy (above 1-in-10-day) | 8 | 2 | 8 | 8 | 8 | 7 | 8 |
| 2026-01-15 | ERA5 (final) | 0.0 | 0.0 | 27.0 | 10.6 | 22.6 | rain heavy (above 1-in-10-day) | 8 | 1 | 8 | 8 | 8 | 7 | 8 |
| 2026-01-16 | ERA5 (final) | 0.0 | 0.0 | 27.3 | 9.4 | 23.3 | rain heavy (above 1-in-10-day) | 8 | 2 | 8 | 8 | 8 | 7 | 8 |
| 2026-01-17 | ERA5 (final) | 0.0 | 0.0 | 27.2 | 10.9 | 22.7 | rain heavy (above 1-in-10-day) | 8 | 2 | 8 | 8 | 8 | 7 | 8 |
| 2026-01-18 | ERA5 (final) | 0.0 | 0.0 | 26.1 | 12.2 | 21.6 | rain heavy (above 1-in-10-day) | 8 | 0 | 8 | 8 | 3 | 8 | 8 |
| 2026-01-19 | ERA5 (final) | 0.0 | 0.0 | 25.2 | 12.5 | 21.9 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 8 | 2 | 8 | 8 | 4 | 7 | 8 |
| 2026-01-20 | ERA5 (final) | 0.0 | 0.0 | 25.2 | 11.7 | 21.0 | rain heavy (above 1-in-10-day) | 8 | 2 | 8 | 8 | 5 | 7 | 8 |
| 2026-01-21 | ERA5 (final) | 0.0 | 0.0 | 25.7 | 11.8 | 20.7 | rain heavy (above 1-in-10-day) | 8 | 1 | 8 | 8 | 5 | 8 | 8 |
| 2026-01-22 | ERA5 (final) | 0.0 | 0.0 | 25.2 | 11.1 | 20.3 | rain heavy (above 1-in-10-day) | 8 | 1 | 8 | 8 | 7 | 8 | 8 |
| 2026-01-23 | ERA5 (final) | 0.0 | 0.0 | 25.9 | 10.1 | 20.9 | rain heavy (above 1-in-10-day) | 8 | 0 | 8 | 8 | 8 | 8 | 8 |
| 2026-01-24 | ERA5 (final) | 0.0 | 0.0 | 27.0 | 10.4 | 21.8 | rain heavy (above 1-in-10-day) | 8 | 2 | 8 | 8 | 8 | 8 | 8 |
| 2026-01-25 | ERA5 (final) | 0.0 | 0.0 | 28.1 | 11.2 | 23.9 | rain heavy (above 1-in-10-day) | 8 | 0 | 8 | 8 | 6 | 8 | 8 |
| 2026-01-26 | ERA5 (final) | 0.0 | 0.0 | 28.7 | 9.9 | 23.0 | rain heavy (above 1-in-10-day) | 8 | 0 | 8 | 8 | 8 | 8 | 8 |
| 2026-01-27 | ERA5 (final) | 0.0 | 0.0 | 29.7 | 9.6 | 23.5 | rain heavy (above 1-in-10-day) | 8 | 0 | 8 | 8 | 8 | 8 | 8 |
| 2026-01-28 | ERA5 (final) | 0.0 | 0.0 | 30.0 | 9.2 | 23.4 | rain heavy (above 1-in-10-day) | 8 | 0 | 8 | 8 | 8 | 8 | 8 |
| 2026-01-29 | ERA5 (final) | 0.0 | 0.0 | 30.1 | 9.0 | 23.8 | rain heavy (above 1-in-10-day) | 8 | 0 | 8 | 8 | 8 | 8 | 8 |
| 2026-01-30 | ERA5 (final) | 0.0 | 0.0 | 30.4 | 9.8 | 24.0 | rain heavy (above 1-in-10-day) | 8 | 1 | 8 | 8 | 8 | 8 | 8 |
| 2026-01-31 | ERA5 (final) | 0.0 | 0.0 | 29.2 | 9.7 | 24.5 | rain heavy (above 1-in-10-day) | 8 | 2 | 8 | 8 | 8 | 7 | 8 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*