# Site weather record · Doha · June 2026

Site 25.2854, 51.5310. 30 of 30 days recorded, 30 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 0.0 mm against a pro-rata normal of 0 mm (normal under 1 mm, so no percentage; full-month normal 0 mm, 1991-2020).
- Rain days (1 mm or more): 0 against a pro-rata normal of 0.0.
- Heavy rain days (above the site's 1-in-10-day amount, 0 mm): 0; exceptional (above 1-in-100-day, 0 mm): 30.
- Days with gusts above the 1-in-10-day value (16 m/s): 4; days hotter than the 1-in-10-day maximum (41.9 °C): 4.
- Working hours lost to weather (caution or stop): outdoor labour 250 h, concrete pour 255 h, asphalt & surfacing 68 h, crane lifts 47 h, work at height 85 h, painting & coatings 2 h, earthworks 0 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-06-01 | ERA5 (final) | 0.0 | 0.0 | 40.5 | 10.9 | 30.2 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-02 | ERA5 (final) | 0.0 | 0.0 | 41.2 | 10.5 | 30.4 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-03 | ERA5 (final) | 0.0 | 0.0 | 42.2 | 12.1 | 31.2 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 1 | 0 | 6 | 9 | 5 | 9 | 9 |
| 2026-06-04 | ERA5 (final) | 0.0 | 0.0 | 41.1 | 13.7 | 30.5 | rain exceptional (above 1-in-100-day) | 1 | 0 | 1 | 4 | 1 | 9 | 9 |
| 2026-06-05 | ERA5 (final) | 0.0 | 0.0 | 39.6 | 16.8 | 29.6 | rain exceptional (above 1-in-100-day); gust above 1-in-10-day | 1 | 0 | 0 | 1 | 0 | 9 | 9 |
| 2026-06-06 | ERA5 (final) | 0.0 | 0.0 | 39.7 | 15.5 | 29.6 | rain exceptional (above 1-in-100-day); gust above 1-in-10-day | 1 | 0 | 1 | 1 | 0 | 9 | 9 |
| 2026-06-07 | ERA5 (final) | 0.0 | 0.0 | 40.1 | 11.1 | 30.9 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 7 | 9 | 9 |
| 2026-06-08 | ERA5 (final) | 0.0 | 0.0 | 40.3 | 11.7 | 29.9 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 5 | 9 | 9 |
| 2026-06-09 | ERA5 (final) | 0.0 | 0.0 | 41.4 | 9.7 | 31.0 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-10 | ERA5 (final) | 0.0 | 0.0 | 42.3 | 7.0 | 32.0 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-11 | ERA5 (final) | 0.0 | 0.0 | 41.4 | 10.4 | 31.4 | rain exceptional (above 1-in-100-day) | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-12 | ERA5 (final) | 0.0 | 0.0 | 41.5 | 12.2 | 31.2 | rain exceptional (above 1-in-100-day) | 1 | 0 | 5 | 9 | 1 | 9 | 9 |
| 2026-06-13 | ERA5 (final) | 0.0 | 0.0 | 40.1 | 13.5 | 30.6 | rain exceptional (above 1-in-100-day) | 0 | 0 | 3 | 6 | 2 | 9 | 9 |
| 2026-06-14 | ERA5 (final) | 0.0 | 0.0 | 42.4 | 9.8 | 31.5 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-15 | ERA5 (final) | 0.0 | 0.0 | 42.7 | 8.1 | 31.1 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-16 | ERA5 (final) | 0.0 | 0.0 | 39.6 | 15.6 | 29.8 | rain exceptional (above 1-in-100-day); gust above 1-in-10-day | 0 | 0 | 4 | 4 | 3 | 9 | 9 |
| 2026-06-17 | ERA5 (final) | 0.0 | 0.0 | 38.3 | 13.3 | 29.8 | rain exceptional (above 1-in-100-day) | 1 | 0 | 1 | 3 | 1 | 9 | 9 |
| 2026-06-18 | ERA5 (final) | 0.0 | 0.0 | 38.3 | 8.5 | 31.7 | rain exceptional (above 1-in-100-day) | 1 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-19 | ERA5 (final) | 0.0 | 0.0 | 36.6 | 7.8 | 32.4 | rain exceptional (above 1-in-100-day) | 0 | 4 | 9 | 9 | 9 | 8 | 9 |
| 2026-06-20 | ERA5 (final) | 0.0 | 0.0 | 39.6 | 7.4 | 32.0 | rain exceptional (above 1-in-100-day) | 0 | 1 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-21 | ERA5 (final) | 0.0 | 0.0 | 41.5 | 7.8 | 31.8 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-22 | ERA5 (final) | 0.0 | 0.0 | 41.8 | 9.5 | 32.3 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-23 | ERA5 (final) | 0.0 | 0.0 | 39.4 | 6.5 | 33.2 | rain exceptional (above 1-in-100-day) | 0 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-24 | ERA5 (final) | 0.0 | 0.0 | 40.4 | 8.1 | 33.1 | rain exceptional (above 1-in-100-day) | 0 | 2 | 9 | 9 | 9 | 8 | 9 |
| 2026-06-25 | ERA5 (final) | 0.0 | 0.0 | 40.5 | 15.6 | 31.1 | rain exceptional (above 1-in-100-day); gust above 1-in-10-day | 0 | 0 | 1 | 2 | 1 | 9 | 9 |
| 2026-06-26 | ERA5 (final) | 0.0 | 0.0 | 40.9 | 10.1 | 30.6 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-27 | ERA5 (final) | 0.0 | 0.0 | 40.2 | 8.9 | 30.7 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-28 | ERA5 (final) | 0.0 | 0.0 | 38.3 | 9.9 | 31.2 | rain exceptional (above 1-in-100-day) | 0 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-29 | ERA5 (final) | 0.0 | 0.0 | 40.9 | 12.1 | 31.7 | rain exceptional (above 1-in-100-day) | 0 | 0 | 7 | 9 | 5 | 9 | 9 |
| 2026-06-30 | ERA5 (final) | 0.0 | 0.0 | 41.0 | 13.8 | 31.3 | rain exceptional (above 1-in-100-day) | 1 | 0 | 2 | 4 | 1 | 9 | 9 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*
