# Site weather record · Durban · February 2026

Site -29.8587, 31.0218. 28 of 28 days recorded, 28 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 88.4 mm against a pro-rata normal of 84 mm (105 % of normal; full-month normal 84 mm, 1991-2020).
- Rain days (1 mm or more): 12 against a pro-rata normal of 11.4.
- Heavy rain days (above the site's 1-in-10-day amount, 9 mm): 3; exceptional (above 1-in-100-day, 30 mm): 0.
- Days with gusts above the 1-in-10-day value (15 m/s): 3; days hotter than the 1-in-10-day maximum (31.4 °C): 8.
- Working hours lost to weather (caution or stop): outdoor labour 107 h, concrete pour 112 h, asphalt & surfacing 81 h, crane lifts 37 h, work at height 86 h, painting & coatings 107 h, earthworks 74 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-02-01 | ERA5 (final) | 0.2 | 0.1 | 29.9 | 9.3 | 28.9 |  | 3 | 7 | 5 | 9 | 9 | 7 | 9 |
| 2026-02-02 | ERA5 (final) | 0.0 | 0.0 | 31.5 | 10.2 | 29.6 | heat above 1-in-10-day | 1 | 4 | 9 | 9 | 9 | 7 | 9 |
| 2026-02-03 | ERA5 (final) | 0.0 | 0.0 | 31.9 | 14.5 | 30.0 | heat above 1-in-10-day | 2 | 3 | 9 | 5 | 5 | 7 | 9 |
| 2026-02-04 | ERA5 (final) | 0.0 | 0.0 | 31.8 | 14.3 | 29.7 | heat above 1-in-10-day | 4 | 4 | 9 | 6 | 5 | 7 | 9 |
| 2026-02-05 | ERA5 (final) | 0.0 | 0.0 | 32.3 | 15.1 | 29.6 | gust above 1-in-10-day; heat above 1-in-10-day | 2 | 3 | 9 | 5 | 5 | 8 | 9 |
| 2026-02-06 | ERA5 (final) | 0.3 | 0.1 | 32.6 | 12.3 | 30.6 | heat above 1-in-10-day | 1 | 4 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-07 | ERA5 (final) | 0.0 | 0.0 | 31.2 | 12.6 | 29.7 |  | 3 | 4 | 9 | 9 | 7 | 7 | 9 |
| 2026-02-08 | ERA5 (final) | 12.0 | 4.2 | 31.3 | 12.5 | 30.0 | rain heavy (above 1-in-10-day) | 2 | 4 | 5 | 9 | 6 | 5 | 9 |
| 2026-02-09 | ERA5 (final) | 3.5 | 2.4 | 30.2 | 11.1 | 29.3 |  | 2 | 9 | 7 | 9 | 7 | 2 | 0 |
| 2026-02-10 | ERA5 (final) | 0.0 | 0.0 | 32.2 | 14.1 | 30.3 | heat above 1-in-10-day | 1 | 4 | 9 | 6 | 5 | 6 | 9 |
| 2026-02-11 | ERA5 (final) | 0.0 | 0.0 | 32.5 | 14.5 | 30.1 | heat above 1-in-10-day | 2 | 3 | 9 | 5 | 5 | 7 | 9 |
| 2026-02-12 | ERA5 (final) | 0.0 | 0.0 | 29.3 | 12.9 | 28.2 |  | 8 | 2 | 9 | 8 | 1 | 8 | 9 |
| 2026-02-13 | ERA5 (final) | 6.4 | 1.3 | 29.5 | 9.9 | 28.4 |  | 6 | 9 | 3 | 9 | 8 | 2 | 0 |
| 2026-02-14 | ERA5 (final) | 4.4 | 0.7 | 25.8 | 20.1 | 25.1 | gust above 1-in-10-day | 9 | 0 | 0 | 0 | 0 | 4 | 7 |
| 2026-02-15 | ERA5 (final) | 6.3 | 1.0 | 24.4 | 12.1 | 21.9 |  | 9 | 3 | 0 | 9 | 4 | 5 | 0 |
| 2026-02-16 | ERA5 (final) | 0.7 | 0.2 | 25.2 | 7.1 | 23.3 |  | 9 | 9 | 1 | 9 | 9 | 9 | 9 |
| 2026-02-17 | ERA5 (final) | 0.0 | 0.0 | 27.1 | 10.4 | 25.4 |  | 9 | 4 | 9 | 9 | 9 | 8 | 9 |
| 2026-02-18 | ERA5 (final) | 1.0 | 0.6 | 28.4 | 9.7 | 27.1 |  | 9 | 5 | 9 | 9 | 9 | 7 | 9 |
| 2026-02-19 | ERA5 (final) | 0.0 | 0.0 | 30.7 | 7.8 | 30.0 |  | 2 | 9 | 9 | 9 | 9 | 5 | 9 |
| 2026-02-20 | ERA5 (final) | 1.6 | 0.5 | 31.1 | 9.4 | 30.3 |  | 2 | 7 | 9 | 9 | 9 | 4 | 9 |
| 2026-02-21 | ERA5 (final) | 20.6 | 3.7 | 28.1 | 8.2 | 28.9 | rain heavy (above 1-in-10-day) | 7 | 3 | 0 | 9 | 3 | 0 | 0 |
| 2026-02-22 | ERA5 (final) | 13.9 | 2.7 | 27.9 | 10.7 | 28.0 | rain heavy (above 1-in-10-day) | 9 | 5 | 0 | 9 | 0 | 0 | 0 |
| 2026-02-23 | ERA5 (final) | 3.6 | 0.5 | 28.7 | 14.6 | 27.3 |  | 9 | 3 | 7 | 5 | 2 | 3 | 4 |
| 2026-02-24 | ERA5 (final) | 6.8 | 2.2 | 30.8 | 10.1 | 30.0 |  | 5 | 8 | 0 | 9 | 2 | 2 | 3 |
| 2026-02-25 | ERA5 (final) | 0.1 | 0.1 | 29.2 | 10.4 | 27.5 |  | 9 | 5 | 8 | 9 | 9 | 7 | 2 |
| 2026-02-26 | ERA5 (final) | 0.0 | 0.0 | 29.7 | 10.4 | 28.5 |  | 8 | 8 | 9 | 9 | 9 | 4 | 9 |
| 2026-02-27 | ERA5 (final) | 7.0 | 2.5 | 25.1 | 16.3 | 23.8 | gust above 1-in-10-day | 9 | 7 | 0 | 4 | 2 | 0 | 0 |
| 2026-02-28 | ERA5 (final) | 0.0 | 0.0 | 33.1 | 10.0 | 31.4 | heat above 1-in-10-day | 3 | 4 | 9 | 9 | 9 | 5 | 9 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*