# Site weather record · Gaborone · March 2026

Site -24.6282, 25.9231. 31 of 31 days recorded, 31 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 188.7 mm against a pro-rata normal of 59 mm (322 % of normal; full-month normal 59 mm, 1991-2020).
- Rain days (1 mm or more): 16 against a pro-rata normal of 8.4.
- Heavy rain days (above the site's 1-in-10-day amount, 6 mm): 9; exceptional (above 1-in-100-day, 24 mm): 1.
- Days with gusts above the 1-in-10-day value (11 m/s): 2; days hotter than the 1-in-10-day maximum (33.9 °C): 0.
- Working hours lost to weather (caution or stop): outdoor labour 11 h, concrete pour 51 h, asphalt & surfacing 166 h, crane lifts 1 h, work at height 69 h, painting & coatings 124 h, earthworks 96 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-03-01 | ERA5 (final) | 14.5 | 4.2 | 28.0 | 12.0 | 26.3 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 8 | 5 | 1 | 8 | 2 | 0 | 4 |
| 2026-03-02 | ERA5 (final) | 5.6 | 2.1 | 29.1 | 6.1 | 28.7 |  | 5 | 8 | 3 | 8 | 8 | 5 | 0 |
| 2026-03-03 | ERA5 (final) | 8.0 | 5.4 | 27.5 | 10.1 | 25.4 | rain heavy (above 1-in-10-day) | 8 | 7 | 0 | 8 | 4 | 2 | 5 |
| 2026-03-04 | ERA5 (final) | 0.6 | 0.2 | 26.7 | 8.7 | 25.4 |  | 8 | 8 | 3 | 8 | 8 | 6 | 0 |
| 2026-03-05 | ERA5 (final) | 18.1 | 3.5 | 24.2 | 10.8 | 23.6 | rain heavy (above 1-in-10-day) | 8 | 3 | 0 | 8 | 0 | 0 | 0 |
| 2026-03-06 | ERA5 (final) | 21.7 | 3.0 | 23.0 | 13.2 | 22.7 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 8 | 1 | 0 | 7 | 0 | 0 | 0 |
| 2026-03-07 | ERA5 (final) | 0.6 | 0.3 | 30.2 | 7.3 | 26.7 |  | 8 | 5 | 5 | 8 | 8 | 6 | 2 |
| 2026-03-08 | ERA5 (final) | 0.5 | 0.4 | 26.8 | 11.1 | 23.6 |  | 8 | 4 | 4 | 8 | 7 | 7 | 7 |
| 2026-03-09 | ERA5 (final) | 0.8 | 0.3 | 26.9 | 9.5 | 23.9 |  | 8 | 5 | 6 | 8 | 8 | 8 | 8 |
| 2026-03-10 | ERA5 (final) | 0.2 | 0.1 | 27.9 | 6.9 | 24.0 |  | 8 | 5 | 4 | 8 | 8 | 6 | 8 |
| 2026-03-11 | ERA5 (final) | 0.0 | 0.0 | 27.7 | 6.1 | 24.7 |  | 8 | 6 | 8 | 8 | 8 | 6 | 8 |
| 2026-03-12 | ERA5 (final) | 2.8 | 1.5 | 25.8 | 8.9 | 24.6 |  | 8 | 7 | 4 | 8 | 5 | 4 | 5 |
| 2026-03-13 | ERA5 (final) | 6.3 | 2.1 | 26.2 | 8.8 | 24.3 | rain heavy (above 1-in-10-day) | 8 | 8 | 6 | 8 | 8 | 6 | 8 |
| 2026-03-14 | ERA5 (final) | 22.9 | 2.8 | 26.1 | 7.0 | 24.8 | rain heavy (above 1-in-10-day) | 8 | 7 | 0 | 8 | 6 | 4 | 0 |
| 2026-03-15 | ERA5 (final) | 12.6 | 4.7 | 24.7 | 8.4 | 23.6 | rain heavy (above 1-in-10-day) | 8 | 7 | 0 | 8 | 3 | 1 | 0 |
| 2026-03-16 | ERA5 (final) | 4.5 | 1.5 | 25.7 | 8.0 | 25.1 |  | 8 | 7 | 0 | 8 | 3 | 2 | 0 |
| 2026-03-17 | ERA5 (final) | 0.5 | 0.1 | 26.7 | 5.6 | 26.0 |  | 8 | 8 | 2 | 8 | 8 | 6 | 8 |
| 2026-03-18 | ERA5 (final) | 3.0 | 0.7 | 25.6 | 5.5 | 26.7 |  | 8 | 8 | 0 | 8 | 7 | 3 | 8 |
| 2026-03-19 | ERA5 (final) | 0.6 | 0.2 | 29.5 | 5.3 | 27.6 |  | 8 | 8 | 3 | 8 | 8 | 6 | 8 |
| 2026-03-20 | ERA5 (final) | 0.7 | 0.2 | 29.0 | 9.3 | 27.1 |  | 8 | 8 | 2 | 8 | 8 | 5 | 8 |
| 2026-03-21 | ERA5 (final) | 20.5 | 3.2 | 24.1 | 9.8 | 24.5 | rain heavy (above 1-in-10-day) | 8 | 4 | 0 | 8 | 1 | 0 | 3 |
| 2026-03-22 | ERA5 (final) | 30.5 | 2.8 | 23.0 | 10.7 | 22.3 | rain exceptional (above 1-in-100-day) | 8 | 0 | 0 | 8 | 0 | 0 | 0 |
| 2026-03-23 | ERA5 (final) | 8.8 | 1.4 | 26.0 | 7.8 | 25.3 | rain heavy (above 1-in-10-day) | 8 | 8 | 0 | 8 | 1 | 1 | 0 |
| 2026-03-24 | ERA5 (final) | 1.4 | 0.3 | 29.2 | 10.0 | 26.3 |  | 8 | 5 | 1 | 8 | 5 | 3 | 7 |
| 2026-03-25 | ERA5 (final) | 1.1 | 0.4 | 27.3 | 7.8 | 25.3 |  | 8 | 8 | 0 | 8 | 7 | 3 | 7 |
| 2026-03-26 | ERA5 (final) | 0.2 | 0.1 | 29.2 | 6.1 | 28.2 |  | 7 | 8 | 4 | 8 | 8 | 6 | 8 |
| 2026-03-27 | ERA5 (final) | 0.2 | 0.1 | 29.6 | 9.5 | 27.5 |  | 8 | 8 | 7 | 8 | 8 | 6 | 8 |
| 2026-03-28 | ERA5 (final) | 0.2 | 0.1 | 29.1 | 5.9 | 28.0 |  | 8 | 8 | 5 | 8 | 8 | 5 | 8 |
| 2026-03-29 | ERA5 (final) | 0.1 | 0.1 | 31.1 | 5.4 | 28.9 |  | 5 | 7 | 8 | 8 | 8 | 7 | 8 |
| 2026-03-30 | ERA5 (final) | 0.4 | 0.3 | 30.5 | 5.9 | 29.3 |  | 4 | 8 | 4 | 8 | 8 | 6 | 8 |
| 2026-03-31 | ERA5 (final) | 0.8 | 0.2 | 28.3 | 8.4 | 26.6 |  | 8 | 8 | 2 | 8 | 8 | 4 | 8 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*
