# Site weather record · Gaborone · November 2026

Site -24.6282, 25.9231. 13 of 30 days recorded, 6 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 6.6 mm against a pro-rata normal of 29 mm (22 % of normal; full-month normal 68 mm, 1991-2020).
- Rain days (1 mm or more): 3 against a pro-rata normal of 4.4.
- Heavy rain days (above the site's 1-in-10-day amount, 7 mm): 0; exceptional (above 1-in-100-day, 28 mm): 0.
- Days with gusts above the 1-in-10-day value (14 m/s): 0; days hotter than the 1-in-10-day maximum (36.2 °C): 2.
- Working hours lost to weather (caution or stop): outdoor labour 18 h, concrete pour 91 h, asphalt & surfacing 17 h, crane lifts 3 h, work at height 24 h, painting & coatings 3 h, earthworks 1 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-11-01 | ERA5 (final) | 0.0 | 0.0 | 36.2 | 12.1 | 29.1 |  | 5 | 0 | 8 | 8 | 8 | 8 | 8 |
| 2026-11-02 | ERA5 (final) | 1.6 | 1.4 | 33.5 | 9.0 | 27.3 |  | 8 | 2 | 4 | 8 | 7 | 7 | 7 |
| 2026-11-03 | ERA5 (final) | 0.3 | 0.1 | 34.9 | 9.7 | 28.1 |  | 7 | 0 | 5 | 8 | 8 | 8 | 8 |
| 2026-11-04 | ERA5 (final) | 0.1 | 0.1 | 36.0 | 10.7 | 29.8 |  | 4 | 0 | 8 | 8 | 8 | 8 | 8 |
| 2026-11-05 | ERA5 (final) | 0.5 | 0.1 | 37.2 | 11.2 | 28.7 | heat above 1-in-10-day | 3 | 0 | 4 | 8 | 7 | 8 | 8 |
| 2026-11-12 | ERA5 (final) | 0.0 | 0.0 | 38.5 | 8.0 | 29.9 | heat above 1-in-10-day | 4 | 0 | 8 | 8 | 8 | 8 | 8 |
| 2026-11-13 | model analysis (preliminary) | 0.0 | 0.0 | 35.8 | 11.9 | 28.1 |  | 7 | 0 | 8 | 8 | 5 | 8 | 8 |
| 2026-11-14 | model analysis (preliminary) | 3.1 | 1.7 | 34.2 | 11.4 | 26.8 |  | 8 | 2 | 6 | 8 | 8 | 8 | 8 |
| 2026-11-15 | model analysis (preliminary) | 1.0 | 0.3 | 31.9 | 13.0 | 25.5 |  | 8 | 0 | 4 | 5 | 2 | 6 | 8 |
| 2026-11-16 | model analysis (preliminary) | 0.0 | 0.0 | 32.3 | 13.5 | 27.8 |  | 8 | 7 | 8 | 8 | 8 | 8 | 8 |
| 2026-11-17 | model analysis (preliminary) | 0.0 | 0.0 | 33.2 | 12.4 | 26.7 |  | 8 | 1 | 8 | 8 | 4 | 8 | 8 |
| 2026-11-18 | model analysis (preliminary) | 0.0 | 0.0 | 31.0 | 12.2 | 26.2 |  | 8 | 0 | 8 | 8 | 2 | 8 | 8 |
| 2026-11-19 | model analysis (preliminary) | 0.0 | 0.0 | 33.7 | 12.3 | 26.9 |  | 8 | 1 | 8 | 8 | 5 | 8 | 8 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*