# Site weather record · Jinja · July 2026

Site 0.4244, 33.2042. 31 of 31 days recorded, 31 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 73.9 mm against a pro-rata normal of 116 mm (64 % of normal; full-month normal 116 mm, 1991-2020).
- Rain days (1 mm or more): 16 against a pro-rata normal of 20.6.
- Heavy rain days (above the site's 1-in-10-day amount, 9 mm): 2; exceptional (above 1-in-100-day, 16 mm): 0.
- Days with gusts above the 1-in-10-day value (9 m/s): 2; days hotter than the 1-in-10-day maximum (26.9 °C): 19.
- Working hours lost to weather (caution or stop): outdoor labour 2 h, concrete pour 36 h, asphalt & surfacing 143 h, crane lifts 0 h, work at height 59 h, painting & coatings 152 h, earthworks 71 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-07-01 | ERA5 (final) | 2.8 | 1.3 | 27.9 | 7.4 | 26.7 | heat above 1-in-10-day | 8 | 6 | 0 | 8 | 4 | 1 | 5 |
| 2026-07-02 | ERA5 (final) | 1.6 | 0.6 | 26.5 | 8.2 | 25.6 |  | 8 | 8 | 4 | 8 | 8 | 3 | 8 |
| 2026-07-03 | ERA5 (final) | 0.0 | 0.0 | 27.5 | 8.1 | 25.7 | heat above 1-in-10-day | 8 | 7 | 8 | 8 | 8 | 5 | 8 |
| 2026-07-04 | ERA5 (final) | 0.2 | 0.1 | 29.3 | 6.0 | 27.1 | heat above 1-in-10-day | 8 | 8 | 3 | 8 | 8 | 6 | 8 |
| 2026-07-05 | ERA5 (final) | 0.5 | 0.1 | 28.2 | 7.3 | 26.3 | heat above 1-in-10-day | 8 | 8 | 3 | 8 | 8 | 4 | 8 |
| 2026-07-06 | ERA5 (final) | 0.1 | 0.1 | 27.2 | 8.6 | 25.7 | gust above 1-in-10-day; heat above 1-in-10-day | 8 | 7 | 7 | 8 | 8 | 5 | 8 |
| 2026-07-07 | ERA5 (final) | 0.2 | 0.1 | 26.5 | 7.3 | 25.2 |  | 8 | 8 | 5 | 8 | 8 | 5 | 8 |
| 2026-07-08 | ERA5 (final) | 0.6 | 0.2 | 26.8 | 5.5 | 26.5 |  | 8 | 8 | 3 | 8 | 7 | 4 | 8 |
| 2026-07-09 | ERA5 (final) | 0.1 | 0.1 | 27.5 | 6.2 | 25.5 | heat above 1-in-10-day | 8 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-07-10 | ERA5 (final) | 0.1 | 0.1 | 28.4 | 6.5 | 26.7 | heat above 1-in-10-day | 8 | 7 | 6 | 8 | 8 | 6 | 8 |
| 2026-07-11 | ERA5 (final) | 5.6 | 1.6 | 27.5 | 5.6 | 27.7 | heat above 1-in-10-day | 8 | 5 | 2 | 8 | 2 | 0 | 4 |
| 2026-07-12 | ERA5 (final) | 1.8 | 0.8 | 25.9 | 5.6 | 26.9 |  | 8 | 8 | 2 | 8 | 7 | 0 | 4 |
| 2026-07-13 | ERA5 (final) | 6.5 | 1.1 | 26.1 | 6.5 | 27.2 |  | 8 | 5 | 0 | 8 | 4 | 2 | 0 |
| 2026-07-14 | ERA5 (final) | 4.9 | 2.1 | 26.9 | 6.0 | 26.2 | heat above 1-in-10-day | 8 | 6 | 3 | 8 | 6 | 3 | 0 |
| 2026-07-15 | ERA5 (final) | 0.0 | 0.0 | 27.8 | 5.3 | 27.4 | heat above 1-in-10-day | 8 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-07-16 | ERA5 (final) | 0.2 | 0.1 | 28.7 | 8.3 | 27.2 | heat above 1-in-10-day | 8 | 8 | 5 | 8 | 8 | 5 | 8 |
| 2026-07-17 | ERA5 (final) | 0.9 | 0.3 | 27.1 | 5.8 | 26.9 | heat above 1-in-10-day | 8 | 8 | 2 | 8 | 7 | 4 | 8 |
| 2026-07-18 | ERA5 (final) | 11.4 | 3.5 | 23.7 | 6.2 | 24.9 | rain heavy (above 1-in-10-day) | 8 | 2 | 1 | 8 | 2 | 0 | 2 |
| 2026-07-19 | ERA5 (final) | 0.2 | 0.1 | 26.7 | 5.7 | 26.4 |  | 8 | 8 | 5 | 8 | 8 | 3 | 2 |
| 2026-07-20 | ERA5 (final) | 2.7 | 0.8 | 26.3 | 5.6 | 26.7 |  | 8 | 6 | 0 | 8 | 3 | 2 | 5 |
| 2026-07-21 | ERA5 (final) | 1.8 | 1.6 | 27.5 | 7.6 | 27.0 | heat above 1-in-10-day | 8 | 7 | 5 | 8 | 6 | 2 | 7 |
| 2026-07-22 | ERA5 (final) | 2.9 | 1.8 | 27.0 | 5.1 | 27.3 | heat above 1-in-10-day | 8 | 7 | 2 | 8 | 6 | 3 | 6 |
| 2026-07-23 | ERA5 (final) | 3.1 | 1.6 | 27.9 | 5.6 | 28.3 | heat above 1-in-10-day | 6 | 6 | 0 | 8 | 6 | 3 | 6 |
| 2026-07-24 | ERA5 (final) | 0.8 | 0.4 | 27.8 | 6.8 | 27.7 | heat above 1-in-10-day | 8 | 8 | 2 | 8 | 7 | 3 | 7 |
| 2026-07-25 | ERA5 (final) | 0.0 | 0.0 | 27.3 | 6.6 | 26.6 | heat above 1-in-10-day | 8 | 8 | 8 | 8 | 8 | 8 | 8 |
| 2026-07-26 | ERA5 (final) | 5.4 | 1.5 | 26.5 | 7.4 | 25.6 |  | 8 | 5 | 2 | 8 | 2 | 0 | 4 |
| 2026-07-27 | ERA5 (final) | 5.3 | 1.7 | 26.3 | 5.9 | 25.9 |  | 8 | 3 | 2 | 8 | 2 | 0 | 1 |
| 2026-07-28 | ERA5 (final) | 1.6 | 0.6 | 28.7 | 7.0 | 27.6 | heat above 1-in-10-day | 8 | 7 | 4 | 8 | 7 | 3 | 5 |
| 2026-07-29 | ERA5 (final) | 10.8 | 3.1 | 24.5 | 6.7 | 26.6 | rain heavy (above 1-in-10-day) | 8 | 7 | 0 | 8 | 0 | 0 | 0 |
| 2026-07-30 | ERA5 (final) | 1.4 | 0.6 | 26.5 | 6.1 | 27.2 |  | 8 | 7 | 2 | 8 | 7 | 2 | 7 |
| 2026-07-31 | ERA5 (final) | 0.4 | 0.1 | 27.4 | 9.0 | 26.2 | gust above 1-in-10-day; heat above 1-in-10-day | 8 | 8 | 3 | 8 | 8 | 4 | 8 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*