Site -26.2041, 28.0473. 31 of 31 days recorded, 31 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 221.3 mm against a pro-rata normal of 89 mm (249 % of normal; full-month normal 89 mm, 1991-2020).
- Rain days (1 mm or more): 22 against a pro-rata normal of 12.7.
- Heavy rain days (above the site's 1-in-10-day amount, 9 mm): 6; exceptional (above 1-in-100-day, 27 mm): 2.
- Days with gusts above the 1-in-10-day value (12 m/s): 4; days hotter than the 1-in-10-day maximum (27.2 °C): 0.
- Working hours lost to weather (caution or stop): outdoor labour 0 h, concrete pour 68 h, asphalt & surfacing 166 h, crane lifts 10 h, work at height 112 h, painting & coatings 189 h, earthworks 154 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-03-01 | ERA5 (final) | 8.8 | 4.6 | 21.1 | 15.1 | 21.4 | gust above 1-in-10-day | 9 | 6 | 3 | 4 | 2 | 0 | 3 |
| 2026-03-02 | ERA5 (final) | 8.2 | 1.8 | 25.6 | 6.5 | 22.3 |  | 9 | 7 | 1 | 9 | 6 | 5 | 0 |
| 2026-03-03 | ERA5 (final) | 1.5 | 0.4 | 21.6 | 8.9 | 20.5 |  | 9 | 9 | 4 | 9 | 7 | 2 | 8 |
| 2026-03-04 | ERA5 (final) | 1.6 | 0.9 | 22.1 | 7.4 | 21.8 |  | 9 | 9 | 5 | 9 | 9 | 3 | 9 |
| 2026-03-05 | ERA5 (final) | 7.5 | 2.2 | 21.0 | 10.1 | 21.4 |  | 9 | 5 | 2 | 9 | 2 | 0 | 3 |
| 2026-03-06 | ERA5 (final) | 28.6 | 3.3 | 21.0 | 15.1 | 20.9 | rain exceptional (above 1-in-100-day); gust above 1-in-10-day | 9 | 2 | 0 | 8 | 0 | 0 | 0 |
| 2026-03-07 | ERA5 (final) | 0.0 | 0.0 | 24.5 | 8.9 | 22.3 |  | 9 | 8 | 9 | 9 | 9 | 6 | 0 |
| 2026-03-08 | ERA5 (final) | 0.0 | 0.0 | 21.1 | 14.7 | 19.1 | gust above 1-in-10-day | 9 | 7 | 8 | 5 | 2 | 7 | 9 |
| 2026-03-09 | ERA5 (final) | 0.2 | 0.1 | 22.2 | 9.4 | 20.7 |  | 9 | 9 | 5 | 9 | 9 | 7 | 9 |
| 2026-03-10 | ERA5 (final) | 0.0 | 0.0 | 23.0 | 9.5 | 19.2 |  | 9 | 4 | 8 | 9 | 9 | 7 | 9 |
| 2026-03-11 | ERA5 (final) | 0.0 | 0.0 | 23.3 | 9.4 | 19.6 |  | 9 | 4 | 8 | 9 | 9 | 7 | 9 |
| 2026-03-12 | ERA5 (final) | 15.3 | 2.4 | 17.0 | 8.3 | 16.5 | rain heavy (above 1-in-10-day) | 9 | 1 | 0 | 9 | 0 | 0 | 0 |
| 2026-03-13 | ERA5 (final) | 9.0 | 3.2 | 21.6 | 7.1 | 21.2 |  | 9 | 8 | 5 | 9 | 6 | 4 | 1 |
| 2026-03-14 | ERA5 (final) | 7.1 | 3.3 | 20.8 | 6.2 | 21.1 |  | 9 | 8 | 4 | 9 | 5 | 2 | 0 |
| 2026-03-15 | ERA5 (final) | 16.4 | 2.0 | 18.2 | 6.9 | 17.6 | rain heavy (above 1-in-10-day) | 9 | 3 | 0 | 9 | 2 | 0 | 0 |
| 2026-03-16 | ERA5 (final) | 13.9 | 5.2 | 21.9 | 7.2 | 21.7 | rain heavy (above 1-in-10-day) | 9 | 7 | 0 | 9 | 4 | 1 | 0 |
| 2026-03-17 | ERA5 (final) | 12.3 | 4.1 | 22.9 | 5.1 | 24.3 | rain heavy (above 1-in-10-day) | 9 | 6 | 4 | 9 | 5 | 1 | 0 |
| 2026-03-18 | ERA5 (final) | 6.6 | 2.4 | 22.4 | 8.1 | 22.2 |  | 9 | 9 | 0 | 9 | 7 | 2 | 0 |
| 2026-03-19 | ERA5 (final) | 1.4 | 0.5 | 24.6 | 7.1 | 23.9 |  | 9 | 9 | 6 | 9 | 8 | 4 | 4 |
| 2026-03-20 | ERA5 (final) | 2.2 | 0.8 | 24.5 | 8.6 | 23.4 |  | 9 | 8 | 3 | 9 | 8 | 3 | 8 |
| 2026-03-21 | ERA5 (final) | 17.6 | 2.4 | 20.8 | 7.4 | 21.2 | rain heavy (above 1-in-10-day) | 9 | 4 | 2 | 9 | 2 | 0 | 3 |
| 2026-03-22 | ERA5 (final) | 9.8 | 2.0 | 20.4 | 12.3 | 19.6 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 9 | 7 | 0 | 9 | 0 | 0 | 0 |
| 2026-03-23 | ERA5 (final) | 38.7 | 7.4 | 20.2 | 7.3 | 21.6 | rain exceptional (above 1-in-100-day) | 9 | 2 | 0 | 9 | 0 | 0 | 0 |
| 2026-03-24 | ERA5 (final) | 1.4 | 0.3 | 23.9 | 9.8 | 22.5 |  | 9 | 9 | 2 | 9 | 6 | 4 | 1 |
| 2026-03-25 | ERA5 (final) | 3.0 | 1.3 | 23.9 | 7.6 | 23.5 |  | 9 | 8 | 3 | 9 | 6 | 2 | 7 |
| 2026-03-26 | ERA5 (final) | 5.3 | 2.4 | 25.0 | 5.2 | 24.9 |  | 9 | 8 | 6 | 9 | 7 | 4 | 8 |
| 2026-03-27 | ERA5 (final) | 0.8 | 0.2 | 25.5 | 8.7 | 23.7 |  | 9 | 9 | 5 | 9 | 8 | 5 | 1 |
| 2026-03-28 | ERA5 (final) | 0.9 | 0.6 | 22.7 | 10.3 | 21.7 |  | 9 | 8 | 5 | 9 | 8 | 3 | 8 |
| 2026-03-29 | ERA5 (final) | 0.7 | 0.2 | 25.6 | 8.7 | 23.3 |  | 9 | 9 | 5 | 9 | 8 | 5 | 9 |
| 2026-03-30 | ERA5 (final) | 0.8 | 0.3 | 25.5 | 5.9 | 24.0 |  | 9 | 9 | 5 | 9 | 7 | 4 | 8 |
| 2026-03-31 | ERA5 (final) | 1.7 | 0.8 | 24.4 | 6.4 | 24.8 |  | 9 | 9 | 5 | 9 | 6 | 2 | 8 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*