# Site weather record · Kigali · November 2026

Site -1.9441, 30.0619. 13 of 30 days recorded, 6 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 46.5 mm against a pro-rata normal of 56 mm (82 % of normal; full-month normal 130 mm, 1991-2020).
- Rain days (1 mm or more): 11 against a pro-rata normal of 9.8.
- Heavy rain days (above the site's 1-in-10-day amount, 10 mm): 1; exceptional (above 1-in-100-day, 19 mm): 0.
- Days with gusts above the 1-in-10-day value (10 m/s): 0; days hotter than the 1-in-10-day maximum (26.8 °C): 1.
- Working hours lost to weather (caution or stop): outdoor labour 0 h, concrete pour 9 h, asphalt & surfacing 77 h, crane lifts 0 h, work at height 27 h, painting & coatings 63 h, earthworks 22 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-11-01 | ERA5 (final) | 1.7 | 0.7 | 23.7 | 6.7 | 22.9 |  | 9 | 8 | 0 | 9 | 8 | 5 | 8 |
| 2026-11-02 | ERA5 (final) | 0.7 | 0.7 | 26.2 | 8.8 | 24.1 |  | 9 | 8 | 7 | 9 | 8 | 5 | 8 |
| 2026-11-03 | ERA5 (final) | 2.7 | 1.2 | 24.1 | 7.5 | 23.6 |  | 9 | 9 | 4 | 9 | 8 | 5 | 9 |
| 2026-11-04 | ERA5 (final) | 0.8 | 0.4 | 26.7 | 8.3 | 24.9 |  | 9 | 9 | 9 | 9 | 9 | 6 | 9 |
| 2026-11-05 | ERA5 (final) | 1.1 | 0.4 | 27.6 | 9.3 | 25.5 | heat above 1-in-10-day | 9 | 7 | 5 | 9 | 7 | 5 | 8 |
| 2026-11-12 | ERA5 (final) | 5.2 | 1.3 | 25.2 | 5.0 | 26.0 |  | 9 | 9 | 2 | 9 | 9 | 6 | 9 |
| 2026-11-13 | model analysis (preliminary) | 16.4 | 5.2 | 23.1 | 7.3 | 23.8 | rain heavy (above 1-in-10-day) | 9 | 7 | 0 | 9 | 3 | 1 | 0 |
| 2026-11-14 | model analysis (preliminary) | 6.1 | 1.3 | 24.8 | 7.0 | 23.8 |  | 9 | 9 | 0 | 9 | 5 | 2 | 5 |
| 2026-11-15 | model analysis (preliminary) | 1.2 | 0.3 | 25.0 | 7.5 | 23.9 |  | 9 | 9 | 3 | 9 | 6 | 4 | 7 |
| 2026-11-16 | model analysis (preliminary) | 1.0 | 0.4 | 25.4 | 8.0 | 25.2 |  | 9 | 9 | 4 | 9 | 8 | 6 | 9 |
| 2026-11-17 | model analysis (preliminary) | 4.1 | 1.7 | 24.9 | 9.7 | 23.6 |  | 9 | 8 | 3 | 9 | 8 | 5 | 8 |
| 2026-11-18 | model analysis (preliminary) | 1.1 | 0.2 | 25.0 | 7.0 | 23.8 |  | 9 | 9 | 2 | 9 | 6 | 3 | 9 |
| 2026-11-19 | model analysis (preliminary) | 4.4 | 1.5 | 24.6 | 8.6 | 24.5 |  | 9 | 7 | 1 | 9 | 5 | 1 | 6 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*
