# Site weather record · Kuwait City · April 2026

Site 29.3759, 47.9774. 30 of 30 days recorded, 30 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 25.6 mm against a pro-rata normal of 7 mm (389 % of normal; full-month normal 7 mm, 1991-2020).
- Rain days (1 mm or more): 4 against a pro-rata normal of 1.5.
- Heavy rain days (above the site's 1-in-10-day amount, 0 mm): 7; exceptional (above 1-in-100-day, 6 mm): 1.
- Days with gusts above the 1-in-10-day value (14 m/s): 1; days hotter than the 1-in-10-day maximum (33.1 °C): 1.
- Working hours lost to weather (caution or stop): outdoor labour 0 h, concrete pour 152 h, asphalt & surfacing 49 h, crane lifts 2 h, work at height 37 h, painting & coatings 41 h, earthworks 17 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-04-01 | ERA5 (final) | 0.0 | 0.0 | 23.8 | 11.3 | 19.3 |  | 9 | 2 | 9 | 9 | 5 | 8 | 9 |
| 2026-04-02 | ERA5 (final) | 0.0 | 0.0 | 25.6 | 8.0 | 20.8 |  | 9 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-03 | ERA5 (final) | 0.2 | 0.2 | 24.8 | 6.3 | 23.2 | rain heavy (above 1-in-10-day) | 9 | 9 | 5 | 9 | 8 | 8 | 9 |
| 2026-04-04 | ERA5 (final) | 4.5 | 1.0 | 24.5 | 8.9 | 22.7 | rain heavy (above 1-in-10-day) | 9 | 6 | 0 | 9 | 3 | 3 | 4 |
| 2026-04-05 | ERA5 (final) | 0.0 | 0.0 | 24.3 | 7.7 | 20.7 |  | 9 | 4 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-06 | ERA5 (final) | 0.0 | 0.0 | 24.9 | 5.3 | 21.2 |  | 9 | 7 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-07 | ERA5 (final) | 0.0 | 0.0 | 26.4 | 7.2 | 21.1 |  | 9 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-08 | ERA5 (final) | 0.0 | 0.0 | 27.9 | 5.9 | 23.7 |  | 9 | 4 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-09 | ERA5 (final) | 0.0 | 0.0 | 26.0 | 8.3 | 23.7 |  | 9 | 9 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-10 | ERA5 (final) | 0.0 | 0.0 | 27.1 | 6.1 | 24.5 |  | 9 | 9 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-11 | ERA5 (final) | 1.2 | 0.6 | 26.6 | 9.8 | 22.0 | rain heavy (above 1-in-10-day) | 9 | 3 | 5 | 9 | 8 | 8 | 9 |
| 2026-04-12 | ERA5 (final) | 14.4 | 4.0 | 23.1 | 10.3 | 23.1 | rain exceptional (above 1-in-100-day) | 9 | 6 | 0 | 9 | 4 | 0 | 0 |
| 2026-04-13 | ERA5 (final) | 0.2 | 0.1 | 25.6 | 7.9 | 24.9 | rain heavy (above 1-in-10-day) | 9 | 9 | 7 | 9 | 9 | 4 | 8 |
| 2026-04-14 | ERA5 (final) | 0.0 | 0.0 | 26.3 | 9.0 | 23.1 |  | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-15 | ERA5 (final) | 0.0 | 0.0 | 26.5 | 10.3 | 21.3 |  | 9 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-16 | ERA5 (final) | 0.0 | 0.0 | 28.7 | 12.4 | 21.8 |  | 9 | 0 | 3 | 9 | 4 | 9 | 9 |
| 2026-04-17 | ERA5 (final) | 0.0 | 0.0 | 29.4 | 9.1 | 24.1 |  | 9 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-18 | ERA5 (final) | 0.0 | 0.0 | 29.2 | 10.2 | 24.8 |  | 9 | 1 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-19 | ERA5 (final) | 0.0 | 0.0 | 30.0 | 11.5 | 25.1 |  | 9 | 0 | 8 | 9 | 7 | 9 | 9 |
| 2026-04-20 | ERA5 (final) | 3.7 | 0.6 | 27.9 | 14.2 | 23.1 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 9 | 5 | 0 | 7 | 2 | 2 | 7 |
| 2026-04-21 | ERA5 (final) | 0.7 | 0.3 | 24.5 | 13.3 | 23.9 | rain heavy (above 1-in-10-day) | 9 | 9 | 5 | 9 | 8 | 2 | 9 |
| 2026-04-22 | ERA5 (final) | 0.0 | 0.0 | 27.8 | 8.8 | 25.4 |  | 9 | 4 | 9 | 9 | 9 | 5 | 9 |
| 2026-04-23 | ERA5 (final) | 0.0 | 0.0 | 27.5 | 8.6 | 24.5 |  | 9 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-24 | ERA5 (final) | 0.0 | 0.0 | 27.6 | 5.2 | 23.9 |  | 9 | 6 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-25 | ERA5 (final) | 0.0 | 0.0 | 26.9 | 9.0 | 24.6 |  | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-26 | ERA5 (final) | 0.0 | 0.0 | 30.0 | 7.8 | 27.4 |  | 9 | 6 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-27 | ERA5 (final) | 0.0 | 0.0 | 31.5 | 12.2 | 27.1 |  | 9 | 1 | 9 | 9 | 7 | 9 | 9 |
| 2026-04-28 | ERA5 (final) | 0.7 | 0.4 | 33.2 | 12.5 | 27.9 | rain heavy (above 1-in-10-day); heat above 1-in-10-day | 9 | 1 | 8 | 9 | 6 | 9 | 9 |
| 2026-04-29 | ERA5 (final) | 0.0 | 0.0 | 29.9 | 12.3 | 26.2 |  | 9 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-30 | ERA5 (final) | 0.0 | 0.0 | 31.3 | 8.2 | 25.1 |  | 9 | 1 | 9 | 9 | 9 | 9 | 9 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*