# Site weather record · Kuwait City · July 2026

Site 29.3759, 47.9774. 31 of 31 days recorded, 31 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 0.0 mm against a pro-rata normal of 0 mm (normal under 1 mm, so no percentage; full-month normal 0 mm, 1991-2020).
- Rain days (1 mm or more): 0 against a pro-rata normal of 0.0.
- Heavy rain days (above the site's 1-in-10-day amount, 0 mm): 0; exceptional (above 1-in-100-day, 0 mm): 31.
- Days with gusts above the 1-in-10-day value (15 m/s): 3; days hotter than the 1-in-10-day maximum (43.8 °C): 6.
- Working hours lost to weather (caution or stop): outdoor labour 230 h, concrete pour 279 h, asphalt & surfacing 77 h, crane lifts 32 h, work at height 81 h, painting & coatings 0 h, earthworks 0 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-07-01 | ERA5 (final) | 0.0 | 0.0 | 42.1 | 11.3 | 30.6 | rain exceptional (above 1-in-100-day) | 2 | 0 | 5 | 9 | 7 | 9 | 9 |
| 2026-07-02 | ERA5 (final) | 0.0 | 0.0 | 42.7 | 11.7 | 30.8 | rain exceptional (above 1-in-100-day) | 2 | 0 | 5 | 9 | 6 | 9 | 9 |
| 2026-07-03 | ERA5 (final) | 0.0 | 0.0 | 42.0 | 11.8 | 32.2 | rain exceptional (above 1-in-100-day) | 2 | 0 | 8 | 9 | 7 | 9 | 9 |
| 2026-07-04 | ERA5 (final) | 0.0 | 0.0 | 40.9 | 7.9 | 34.3 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-07-05 | ERA5 (final) | 0.0 | 0.0 | 42.4 | 7.0 | 32.3 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-07-06 | ERA5 (final) | 0.0 | 0.0 | 42.7 | 10.6 | 32.1 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-07-07 | ERA5 (final) | 0.0 | 0.0 | 42.4 | 12.8 | 31.6 | rain exceptional (above 1-in-100-day) | 1 | 0 | 4 | 9 | 4 | 9 | 9 |
| 2026-07-08 | ERA5 (final) | 0.0 | 0.0 | 41.4 | 11.9 | 31.1 | rain exceptional (above 1-in-100-day) | 3 | 0 | 8 | 9 | 7 | 9 | 9 |
| 2026-07-09 | ERA5 (final) | 0.0 | 0.0 | 41.1 | 11.5 | 30.6 | rain exceptional (above 1-in-100-day) | 1 | 0 | 5 | 9 | 5 | 9 | 9 |
| 2026-07-10 | ERA5 (final) | 0.0 | 0.0 | 41.5 | 10.7 | 30.4 | rain exceptional (above 1-in-100-day) | 2 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-07-11 | ERA5 (final) | 0.0 | 0.0 | 41.8 | 13.7 | 31.0 | rain exceptional (above 1-in-100-day) | 2 | 0 | 5 | 7 | 4 | 9 | 9 |
| 2026-07-12 | ERA5 (final) | 0.0 | 0.0 | 42.5 | 12.3 | 30.6 | rain exceptional (above 1-in-100-day) | 3 | 0 | 5 | 9 | 5 | 9 | 9 |
| 2026-07-13 | ERA5 (final) | 0.0 | 0.0 | 44.4 | 11.0 | 32.1 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 1 | 0 | 9 | 9 | 8 | 9 | 9 |
| 2026-07-14 | ERA5 (final) | 0.0 | 0.0 | 44.5 | 11.1 | 32.5 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 1 | 0 | 8 | 9 | 8 | 9 | 9 |
| 2026-07-15 | ERA5 (final) | 0.0 | 0.0 | 44.8 | 15.0 | 31.6 | rain exceptional (above 1-in-100-day); gust above 1-in-10-day; heat above 1-in-10-day | 1 | 0 | 5 | 5 | 4 | 9 | 9 |
| 2026-07-16 | ERA5 (final) | 0.0 | 0.0 | 44.8 | 15.0 | 31.5 | rain exceptional (above 1-in-100-day); gust above 1-in-10-day; heat above 1-in-10-day | 1 | 0 | 3 | 5 | 2 | 9 | 9 |
| 2026-07-17 | ERA5 (final) | 0.0 | 0.0 | 42.5 | 7.3 | 32.6 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-07-18 | ERA5 (final) | 0.0 | 0.0 | 43.7 | 8.1 | 33.6 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-07-19 | ERA5 (final) | 0.0 | 0.0 | 46.1 | 12.9 | 32.5 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 1 | 0 | 5 | 8 | 4 | 9 | 9 |
| 2026-07-20 | ERA5 (final) | 0.0 | 0.0 | 44.2 | 15.1 | 31.7 | rain exceptional (above 1-in-100-day); gust above 1-in-10-day; heat above 1-in-10-day | 1 | 0 | 0 | 1 | 0 | 9 | 9 |
| 2026-07-21 | ERA5 (final) | 0.0 | 0.0 | 43.2 | 14.2 | 30.3 | rain exceptional (above 1-in-100-day) | 2 | 0 | 1 | 4 | 1 | 9 | 9 |
| 2026-07-22 | ERA5 (final) | 0.0 | 0.0 | 42.8 | 10.0 | 31.3 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-07-23 | ERA5 (final) | 0.0 | 0.0 | 42.4 | 9.4 | 31.5 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-07-24 | ERA5 (final) | 0.0 | 0.0 | 42.5 | 9.5 | 32.9 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-07-25 | ERA5 (final) | 0.0 | 0.0 | 42.3 | 10.1 | 31.7 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-07-26 | ERA5 (final) | 0.0 | 0.0 | 41.9 | 11.6 | 30.9 | rain exceptional (above 1-in-100-day) | 2 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-07-27 | ERA5 (final) | 0.0 | 0.0 | 41.5 | 13.4 | 30.5 | rain exceptional (above 1-in-100-day) | 3 | 0 | 0 | 5 | 0 | 9 | 9 |
| 2026-07-28 | ERA5 (final) | 0.0 | 0.0 | 42.1 | 13.8 | 30.5 | rain exceptional (above 1-in-100-day) | 3 | 0 | 0 | 5 | 0 | 9 | 9 |
| 2026-07-29 | ERA5 (final) | 0.0 | 0.0 | 42.1 | 10.5 | 31.7 | rain exceptional (above 1-in-100-day) | 3 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-07-30 | ERA5 (final) | 0.0 | 0.0 | 41.6 | 7.7 | 33.2 | rain exceptional (above 1-in-100-day) | 2 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-07-31 | ERA5 (final) | 0.0 | 0.0 | 40.3 | 6.5 | 33.3 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*