# Site weather record · Lusaka · February 2026

Site -15.3875, 28.3228. 28 of 28 days recorded, 28 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 158.6 mm against a pro-rata normal of 188 mm (84 % of normal; full-month normal 188 mm, 1991-2020).
- Rain days (1 mm or more): 26 against a pro-rata normal of 22.0.
- Heavy rain days (above the site's 1-in-10-day amount, 15 mm): 0; exceptional (above 1-in-100-day, 31 mm): 0.
- Days with gusts above the 1-in-10-day value (12 m/s): 3; days hotter than the 1-in-10-day maximum (28.1 °C): 1.
- Working hours lost to weather (caution or stop): outdoor labour 1 h, concrete pour 38 h, asphalt & surfacing 168 h, crane lifts 0 h, work at height 81 h, painting & coatings 132 h, earthworks 132 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-02-01 | ERA5 (final) | 0.7 | 0.2 | 26.7 | 9.4 | 25.8 |  | 8 | 8 | 2 | 8 | 7 | 5 | 1 |
| 2026-02-02 | ERA5 (final) | 6.7 | 2.2 | 24.4 | 7.0 | 24.2 |  | 8 | 6 | 0 | 8 | 5 | 3 | 6 |
| 2026-02-03 | ERA5 (final) | 6.8 | 3.5 | 26.2 | 7.6 | 25.7 |  | 8 | 6 | 3 | 8 | 5 | 3 | 0 |
| 2026-02-04 | ERA5 (final) | 2.0 | 1.1 | 26.2 | 10.8 | 24.5 |  | 8 | 7 | 2 | 8 | 7 | 6 | 0 |
| 2026-02-05 | ERA5 (final) | 2.8 | 2.3 | 26.5 | 10.5 | 24.7 |  | 8 | 8 | 2 | 8 | 8 | 7 | 8 |
| 2026-02-06 | ERA5 (final) | 7.5 | 2.5 | 26.9 | 9.6 | 25.7 |  | 8 | 7 | 3 | 8 | 5 | 4 | 6 |
| 2026-02-07 | ERA5 (final) | 9.5 | 5.3 | 25.7 | 7.8 | 25.5 |  | 8 | 6 | 0 | 8 | 3 | 1 | 0 |
| 2026-02-08 | ERA5 (final) | 8.4 | 6.2 | 26.8 | 9.9 | 25.7 |  | 8 | 5 | 4 | 8 | 5 | 2 | 0 |
| 2026-02-09 | ERA5 (final) | 4.0 | 2.7 | 26.9 | 9.8 | 25.0 |  | 8 | 7 | 1 | 8 | 5 | 3 | 3 |
| 2026-02-10 | ERA5 (final) | 12.5 | 4.0 | 23.6 | 10.9 | 23.1 |  | 8 | 5 | 2 | 8 | 3 | 1 | 3 |
| 2026-02-11 | ERA5 (final) | 2.4 | 0.6 | 25.9 | 7.4 | 24.8 |  | 8 | 8 | 3 | 8 | 7 | 3 | 3 |
| 2026-02-12 | ERA5 (final) | 7.7 | 2.5 | 25.2 | 5.8 | 25.5 |  | 8 | 6 | 2 | 8 | 4 | 2 | 6 |
| 2026-02-13 | ERA5 (final) | 1.0 | 0.6 | 26.3 | 7.8 | 26.1 |  | 8 | 7 | 6 | 8 | 6 | 4 | 0 |
| 2026-02-14 | ERA5 (final) | 14.7 | 5.3 | 26.2 | 9.7 | 24.7 |  | 8 | 6 | 3 | 8 | 4 | 1 | 5 |
| 2026-02-15 | ERA5 (final) | 5.4 | 1.0 | 26.8 | 5.9 | 27.5 |  | 8 | 8 | 0 | 8 | 5 | 5 | 0 |
| 2026-02-16 | ERA5 (final) | 6.7 | 3.3 | 24.5 | 9.2 | 24.1 |  | 8 | 6 | 1 | 8 | 6 | 1 | 4 |
| 2026-02-17 | ERA5 (final) | 0.2 | 0.1 | 24.2 | 12.2 | 22.5 | gust above 1-in-10-day | 8 | 8 | 5 | 8 | 5 | 5 | 4 |
| 2026-02-18 | ERA5 (final) | 8.5 | 4.9 | 25.4 | 10.1 | 24.4 |  | 8 | 5 | 4 | 8 | 5 | 3 | 5 |
| 2026-02-19 | ERA5 (final) | 11.0 | 2.4 | 25.5 | 7.7 | 24.4 |  | 8 | 5 | 1 | 8 | 3 | 1 | 0 |
| 2026-02-20 | ERA5 (final) | 5.8 | 3.3 | 25.4 | 7.5 | 25.9 |  | 8 | 5 | 0 | 8 | 4 | 1 | 0 |
| 2026-02-21 | ERA5 (final) | 11.2 | 4.8 | 26.4 | 9.5 | 25.5 |  | 8 | 5 | 1 | 8 | 3 | 1 | 0 |
| 2026-02-22 | ERA5 (final) | 2.5 | 0.9 | 26.6 | 11.5 | 25.5 | gust above 1-in-10-day | 8 | 7 | 0 | 8 | 4 | 3 | 2 |
| 2026-02-23 | ERA5 (final) | 1.2 | 0.4 | 26.2 | 7.5 | 25.5 |  | 8 | 8 | 3 | 8 | 6 | 5 | 7 |
| 2026-02-24 | ERA5 (final) | 2.8 | 0.9 | 27.6 | 7.0 | 26.1 |  | 8 | 8 | 0 | 8 | 5 | 4 | 8 |
| 2026-02-25 | ERA5 (final) | 3.5 | 1.6 | 28.7 | 5.4 | 28.4 | heat above 1-in-10-day | 7 | 8 | 1 | 8 | 7 | 6 | 7 |
| 2026-02-26 | ERA5 (final) | 7.0 | 4.1 | 28.0 | 6.6 | 26.6 |  | 8 | 7 | 4 | 8 | 4 | 2 | 6 |
| 2026-02-27 | ERA5 (final) | 2.8 | 2.4 | 27.8 | 10.2 | 25.7 |  | 8 | 7 | 3 | 8 | 7 | 5 | 1 |
| 2026-02-28 | ERA5 (final) | 3.3 | 1.9 | 27.5 | 11.8 | 26.2 | gust above 1-in-10-day | 8 | 7 | 0 | 8 | 5 | 5 | 7 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*
