# Site weather record · Manama · January 2026

Site 26.2285, 50.5860. 31 of 31 days recorded, 31 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 0.4 mm against a pro-rata normal of 15 mm (3 % of normal; full-month normal 15 mm, 1991-2020).
- Rain days (1 mm or more): 0 against a pro-rata normal of 3.0.
- Heavy rain days (above the site's 1-in-10-day amount, 1 mm): 0; exceptional (above 1-in-100-day, 12 mm): 0.
- Days with gusts above the 1-in-10-day value (14 m/s): 5; days hotter than the 1-in-10-day maximum (20.6 °C): 0.
- Working hours lost to weather (caution or stop): outdoor labour 0 h, concrete pour 39 h, asphalt & surfacing 73 h, crane lifts 27 h, work at height 67 h, painting & coatings 103 h, earthworks 0 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-01-01 | ERA5 (final) | 0.0 | 0.0 | 19.5 | 7.6 | 16.1 |  | 9 | 9 | 9 | 9 | 9 | 9 | 9 |
| 2026-01-02 | ERA5 (final) | 0.0 | 0.0 | 19.4 | 7.6 | 19.2 |  | 9 | 9 | 9 | 9 | 9 | 9 | 9 |
| 2026-01-03 | ERA5 (final) | 0.0 | 0.0 | 20.4 | 7.9 | 21.6 |  | 9 | 9 | 9 | 9 | 9 | 0 | 9 |
| 2026-01-04 | ERA5 (final) | 0.0 | 0.0 | 20.0 | 14.5 | 18.3 | gust above 1-in-10-day | 9 | 0 | 0 | 1 | 0 | 8 | 9 |
| 2026-01-05 | ERA5 (final) | 0.0 | 0.0 | 17.0 | 12.5 | 16.2 |  | 9 | 9 | 0 | 9 | 0 | 5 | 9 |
| 2026-01-06 | ERA5 (final) | 0.0 | 0.0 | 17.5 | 9.4 | 16.9 |  | 9 | 9 | 9 | 9 | 9 | 6 | 9 |
| 2026-01-07 | ERA5 (final) | 0.0 | 0.0 | 18.4 | 8.0 | 17.5 |  | 9 | 9 | 9 | 9 | 9 | 9 | 9 |
| 2026-01-08 | ERA5 (final) | 0.0 | 0.0 | 18.7 | 7.7 | 17.7 |  | 9 | 9 | 9 | 9 | 9 | 7 | 9 |
| 2026-01-09 | ERA5 (final) | 0.0 | 0.0 | 18.4 | 6.0 | 19.5 |  | 9 | 9 | 9 | 9 | 9 | 8 | 9 |
| 2026-01-10 | ERA5 (final) | 0.0 | 0.0 | 18.8 | 9.1 | 18.3 |  | 9 | 9 | 9 | 9 | 9 | 2 | 9 |
| 2026-01-11 | ERA5 (final) | 0.0 | 0.0 | 18.7 | 9.6 | 18.0 |  | 9 | 9 | 9 | 9 | 9 | 5 | 9 |
| 2026-01-12 | ERA5 (final) | 0.0 | 0.0 | 18.2 | 7.2 | 18.2 |  | 9 | 9 | 9 | 9 | 9 | 4 | 9 |
| 2026-01-13 | ERA5 (final) | 0.0 | 0.0 | 20.2 | 10.1 | 19.5 |  | 9 | 9 | 9 | 9 | 9 | 0 | 9 |
| 2026-01-14 | ERA5 (final) | 0.0 | 0.0 | 19.0 | 9.2 | 19.3 |  | 9 | 9 | 9 | 9 | 9 | 4 | 9 |
| 2026-01-15 | ERA5 (final) | 0.0 | 0.0 | 19.0 | 11.5 | 17.6 |  | 9 | 2 | 4 | 9 | 2 | 9 | 9 |
| 2026-01-16 | ERA5 (final) | 0.0 | 0.0 | 17.7 | 13.5 | 15.2 |  | 9 | 5 | 0 | 2 | 0 | 9 | 9 |
| 2026-01-17 | ERA5 (final) | 0.0 | 0.0 | 16.3 | 12.2 | 15.3 |  | 9 | 9 | 5 | 9 | 5 | 9 | 9 |
| 2026-01-18 | ERA5 (final) | 0.0 | 0.0 | 17.4 | 7.3 | 16.4 |  | 9 | 9 | 9 | 9 | 9 | 9 | 9 |
| 2026-01-19 | ERA5 (final) | 0.2 | 0.2 | 18.6 | 10.3 | 16.8 |  | 9 | 9 | 6 | 9 | 8 | 8 | 9 |
| 2026-01-20 | ERA5 (final) | 0.0 | 0.0 | 18.4 | 8.0 | 18.7 |  | 9 | 9 | 9 | 9 | 9 | 5 | 9 |
| 2026-01-21 | ERA5 (final) | 0.0 | 0.0 | 17.4 | 15.7 | 15.4 | gust above 1-in-10-day | 9 | 2 | 0 | 0 | 0 | 7 | 9 |
| 2026-01-22 | ERA5 (final) | 0.0 | 0.0 | 16.1 | 14.6 | 14.2 | gust above 1-in-10-day | 9 | 0 | 0 | 7 | 2 | 9 | 9 |
| 2026-01-23 | ERA5 (final) | 0.0 | 0.0 | 16.2 | 7.9 | 16.7 |  | 9 | 9 | 9 | 9 | 9 | 9 | 9 |
| 2026-01-24 | ERA5 (final) | 0.0 | 0.0 | 17.9 | 11.2 | 16.5 |  | 9 | 9 | 9 | 9 | 9 | 6 | 9 |
| 2026-01-25 | ERA5 (final) | 0.2 | 0.2 | 19.1 | 14.4 | 17.7 | gust above 1-in-10-day | 9 | 6 | 2 | 8 | 5 | 6 | 9 |
| 2026-01-26 | ERA5 (final) | 0.0 | 0.0 | 16.6 | 14.3 | 15.8 | gust above 1-in-10-day | 9 | 9 | 0 | 9 | 1 | 4 | 9 |
| 2026-01-27 | ERA5 (final) | 0.0 | 0.0 | 17.1 | 7.5 | 18.6 |  | 9 | 9 | 9 | 9 | 9 | 0 | 9 |
| 2026-01-28 | ERA5 (final) | 0.0 | 0.0 | 18.1 | 11.3 | 18.4 |  | 9 | 9 | 9 | 9 | 9 | 0 | 9 |
| 2026-01-29 | ERA5 (final) | 0.0 | 0.0 | 18.8 | 10.5 | 18.4 |  | 9 | 9 | 9 | 9 | 9 | 4 | 9 |
| 2026-01-30 | ERA5 (final) | 0.0 | 0.0 | 18.1 | 8.5 | 18.9 |  | 9 | 9 | 9 | 9 | 9 | 3 | 9 |
| 2026-01-31 | ERA5 (final) | 0.0 | 0.0 | 18.7 | 7.5 | 18.6 |  | 9 | 9 | 9 | 9 | 9 | 3 | 9 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*
