# Site weather record · Manama · June 2026

Site 26.2285, 50.5860. 30 of 30 days recorded, 30 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 0.0 mm against a pro-rata normal of 0 mm (normal under 1 mm, so no percentage; full-month normal 0 mm, 1991-2020).
- Rain days (1 mm or more): 0 against a pro-rata normal of 0.0.
- Heavy rain days (above the site's 1-in-10-day amount, 0 mm): 0; exceptional (above 1-in-100-day, 0 mm): 30.
- Days with gusts above the 1-in-10-day value (13 m/s): 0; days hotter than the 1-in-10-day maximum (34.8 °C): 6.
- Working hours lost to weather (caution or stop): outdoor labour 267 h, concrete pour 219 h, asphalt & surfacing 32 h, crane lifts 3 h, work at height 16 h, painting & coatings 7 h, earthworks 0 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-06-01 | ERA5 (final) | 0.0 | 0.0 | 31.0 | 8.6 | 29.2 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-02 | ERA5 (final) | 0.0 | 0.0 | 32.5 | 6.8 | 30.3 | rain exceptional (above 1-in-100-day) | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-03 | ERA5 (final) | 0.0 | 0.0 | 32.8 | 9.0 | 30.8 | rain exceptional (above 1-in-100-day) | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-04 | ERA5 (final) | 0.0 | 0.0 | 33.1 | 10.3 | 30.0 | rain exceptional (above 1-in-100-day) | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-05 | ERA5 (final) | 0.0 | 0.0 | 33.8 | 12.9 | 29.5 | rain exceptional (above 1-in-100-day) | 0 | 0 | 0 | 8 | 1 | 9 | 9 |
| 2026-06-06 | ERA5 (final) | 0.0 | 0.0 | 33.8 | 12.1 | 29.8 | rain exceptional (above 1-in-100-day) | 0 | 0 | 2 | 9 | 6 | 9 | 9 |
| 2026-06-07 | ERA5 (final) | 0.0 | 0.0 | 33.0 | 6.1 | 30.9 | rain exceptional (above 1-in-100-day) | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-08 | ERA5 (final) | 0.0 | 0.0 | 31.9 | 8.4 | 29.6 | rain exceptional (above 1-in-100-day) | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-09 | ERA5 (final) | 0.0 | 0.0 | 32.7 | 5.8 | 31.1 | rain exceptional (above 1-in-100-day) | 1 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-10 | ERA5 (final) | 0.0 | 0.0 | 33.2 | 5.4 | 33.3 | rain exceptional (above 1-in-100-day) | 0 | 8 | 9 | 9 | 9 | 8 | 9 |
| 2026-06-11 | ERA5 (final) | 0.0 | 0.0 | 33.2 | 6.6 | 32.1 | rain exceptional (above 1-in-100-day) | 0 | 1 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-12 | ERA5 (final) | 0.0 | 0.0 | 34.3 | 11.0 | 31.1 | rain exceptional (above 1-in-100-day) | 0 | 0 | 8 | 9 | 9 | 9 | 9 |
| 2026-06-13 | ERA5 (final) | 0.0 | 0.0 | 33.7 | 11.2 | 30.9 | rain exceptional (above 1-in-100-day) | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-14 | ERA5 (final) | 0.0 | 0.0 | 34.1 | 6.5 | 32.0 | rain exceptional (above 1-in-100-day) | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-15 | ERA5 (final) | 0.0 | 0.0 | 33.3 | 7.3 | 33.5 | rain exceptional (above 1-in-100-day) | 0 | 6 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-16 | ERA5 (final) | 0.0 | 0.0 | 34.2 | 12.9 | 30.2 | rain exceptional (above 1-in-100-day) | 0 | 0 | 2 | 7 | 4 | 9 | 9 |
| 2026-06-17 | ERA5 (final) | 0.0 | 0.0 | 33.8 | 12.9 | 29.9 | rain exceptional (above 1-in-100-day) | 0 | 0 | 8 | 9 | 9 | 9 | 9 |
| 2026-06-18 | ERA5 (final) | 0.0 | 0.0 | 32.6 | 6.8 | 31.5 | rain exceptional (above 1-in-100-day) | 0 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-19 | ERA5 (final) | 0.0 | 0.0 | 31.8 | 5.2 | 31.9 | rain exceptional (above 1-in-100-day) | 0 | 8 | 9 | 9 | 9 | 6 | 9 |
| 2026-06-20 | ERA5 (final) | 0.0 | 0.0 | 32.8 | 4.3 | 32.9 | rain exceptional (above 1-in-100-day) | 0 | 9 | 9 | 9 | 9 | 7 | 9 |
| 2026-06-21 | ERA5 (final) | 0.0 | 0.0 | 34.9 | 5.2 | 32.6 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-22 | ERA5 (final) | 0.0 | 0.0 | 34.4 | 8.8 | 32.4 | rain exceptional (above 1-in-100-day) | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-23 | ERA5 (final) | 0.0 | 0.0 | 34.2 | 5.4 | 33.1 | rain exceptional (above 1-in-100-day) | 0 | 1 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-24 | ERA5 (final) | 0.0 | 0.0 | 34.2 | 6.3 | 33.6 | rain exceptional (above 1-in-100-day) | 0 | 8 | 9 | 9 | 9 | 8 | 9 |
| 2026-06-25 | ERA5 (final) | 0.0 | 0.0 | 34.8 | 10.9 | 31.1 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 0 | 3 | 9 | 9 | 9 | 9 |
| 2026-06-26 | ERA5 (final) | 0.0 | 0.0 | 35.2 | 7.2 | 32.6 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-27 | ERA5 (final) | 0.0 | 0.0 | 35.4 | 7.7 | 32.6 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-28 | ERA5 (final) | 0.0 | 0.0 | 33.9 | 6.5 | 32.1 | rain exceptional (above 1-in-100-day) | 0 | 5 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-29 | ERA5 (final) | 0.0 | 0.0 | 35.1 | 9.5 | 31.6 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-30 | ERA5 (final) | 0.0 | 0.0 | 35.2 | 10.9 | 31.7 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 0 | 8 | 9 | 9 | 9 | 9 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*