# Site weather record · Manama · August 2026

Site 26.2285, 50.5860. 31 of 31 days recorded, 31 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 0.0 mm against a pro-rata normal of 0 mm (normal under 1 mm, so no percentage; full-month normal 0 mm, 1991-2020).
- Rain days (1 mm or more): 0 against a pro-rata normal of 0.0.
- Heavy rain days (above the site's 1-in-10-day amount, 0 mm): 0; exceptional (above 1-in-100-day, 0 mm): 31.
- Days with gusts above the 1-in-10-day value (11 m/s): 1; days hotter than the 1-in-10-day maximum (36.4 °C): 17.
- Working hours lost to weather (caution or stop): outdoor labour 279 h, concrete pour 167 h, asphalt & surfacing 9 h, crane lifts 1 h, work at height 10 h, painting & coatings 24 h, earthworks 0 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-08-01 | ERA5 (final) | 0.0 | 0.0 | 36.0 | 5.3 | 34.9 | rain exceptional (above 1-in-100-day) | 0 | 6 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-02 | ERA5 (final) | 0.0 | 0.0 | 36.5 | 6.0 | 34.8 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-03 | ERA5 (final) | 0.0 | 0.0 | 36.1 | 5.8 | 34.9 | rain exceptional (above 1-in-100-day) | 0 | 6 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-04 | ERA5 (final) | 0.0 | 0.0 | 35.7 | 8.5 | 35.3 | rain exceptional (above 1-in-100-day) | 0 | 5 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-05 | ERA5 (final) | 0.0 | 0.0 | 35.6 | 5.7 | 35.4 | rain exceptional (above 1-in-100-day) | 0 | 6 | 9 | 9 | 9 | 5 | 9 |
| 2026-08-06 | ERA5 (final) | 0.0 | 0.0 | 37.7 | 6.5 | 36.2 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 5 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-07 | ERA5 (final) | 0.0 | 0.0 | 37.6 | 6.0 | 34.7 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-08 | ERA5 (final) | 0.0 | 0.0 | 36.7 | 6.5 | 34.8 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 2 | 9 | 9 | 9 | 8 | 9 |
| 2026-08-09 | ERA5 (final) | 0.0 | 0.0 | 36.0 | 9.8 | 34.4 | rain exceptional (above 1-in-100-day) | 0 | 5 | 9 | 9 | 9 | 8 | 9 |
| 2026-08-10 | ERA5 (final) | 0.0 | 0.0 | 36.2 | 9.3 | 36.2 | rain exceptional (above 1-in-100-day) | 0 | 6 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-11 | ERA5 (final) | 0.0 | 0.0 | 36.7 | 6.4 | 36.0 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 7 | 9 | 9 | 9 | 6 | 9 |
| 2026-08-12 | ERA5 (final) | 0.0 | 0.0 | 38.3 | 6.1 | 35.8 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-13 | ERA5 (final) | 0.0 | 0.0 | 35.8 | 6.5 | 35.1 | rain exceptional (above 1-in-100-day) | 0 | 6 | 9 | 9 | 9 | 7 | 9 |
| 2026-08-14 | ERA5 (final) | 0.0 | 0.0 | 36.7 | 5.4 | 36.3 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 9 | 9 | 9 | 9 | 8 | 9 |
| 2026-08-15 | ERA5 (final) | 0.0 | 0.0 | 37.7 | 6.4 | 34.9 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-16 | ERA5 (final) | 0.0 | 0.0 | 37.8 | 7.9 | 35.1 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-17 | ERA5 (final) | 0.0 | 0.0 | 37.3 | 6.6 | 35.4 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-18 | ERA5 (final) | 0.0 | 0.0 | 36.6 | 4.7 | 35.5 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 7 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-19 | ERA5 (final) | 0.0 | 0.0 | 37.6 | 9.0 | 34.6 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-20 | ERA5 (final) | 0.0 | 0.0 | 37.1 | 12.9 | 31.6 | rain exceptional (above 1-in-100-day); gust above 1-in-10-day; heat above 1-in-10-day | 0 | 0 | 0 | 8 | 1 | 9 | 9 |
| 2026-08-21 | ERA5 (final) | 0.0 | 0.0 | 35.9 | 11.1 | 32.4 | rain exceptional (above 1-in-100-day) | 0 | 0 | 9 | 9 | 7 | 9 | 9 |
| 2026-08-22 | ERA5 (final) | 0.0 | 0.0 | 35.9 | 5.7 | 32.9 | rain exceptional (above 1-in-100-day) | 0 | 1 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-23 | ERA5 (final) | 0.0 | 0.0 | 35.6 | 4.9 | 35.0 | rain exceptional (above 1-in-100-day) | 0 | 7 | 9 | 9 | 9 | 8 | 9 |
| 2026-08-24 | ERA5 (final) | 0.0 | 0.0 | 36.3 | 6.5 | 34.4 | rain exceptional (above 1-in-100-day) | 0 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-25 | ERA5 (final) | 0.0 | 0.0 | 36.3 | 6.4 | 34.6 | rain exceptional (above 1-in-100-day) | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-26 | ERA5 (final) | 0.0 | 0.0 | 35.1 | 5.7 | 35.9 | rain exceptional (above 1-in-100-day) | 0 | 7 | 9 | 9 | 9 | 5 | 9 |
| 2026-08-27 | ERA5 (final) | 0.0 | 0.0 | 35.5 | 5.6 | 36.0 | rain exceptional (above 1-in-100-day) | 0 | 9 | 9 | 9 | 9 | 3 | 9 |
| 2026-08-28 | ERA5 (final) | 0.0 | 0.0 | 36.6 | 5.8 | 34.9 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 5 | 9 | 9 | 9 | 8 | 9 |
| 2026-08-29 | ERA5 (final) | 0.0 | 0.0 | 37.4 | 5.0 | 34.7 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-30 | ERA5 (final) | 0.0 | 0.0 | 37.0 | 5.2 | 35.1 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 7 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-31 | ERA5 (final) | 0.0 | 0.0 | 36.6 | 11.0 | 34.4 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 0 | 0 | 9 | 9 | 9 | 9 | 9 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*