# Site weather record · Maputo · April 2026

Site -25.9692, 32.5732. 30 of 30 days recorded, 30 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 118.2 mm against a pro-rata normal of 42 mm (284 % of normal; full-month normal 42 mm, 1991-2020).
- Rain days (1 mm or more): 13 against a pro-rata normal of 6.5.
- Heavy rain days (above the site's 1-in-10-day amount, 4 mm): 3; exceptional (above 1-in-100-day, 18 mm): 4.
- Days with gusts above the 1-in-10-day value (13 m/s): 4; days hotter than the 1-in-10-day maximum (30.7 °C): 5.
- Working hours lost to weather (caution or stop): outdoor labour 24 h, concrete pour 64 h, asphalt & surfacing 108 h, crane lifts 6 h, work at height 54 h, painting & coatings 108 h, earthworks 55 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-04-01 | ERA5 (final) | 0.7 | 0.1 | 28.6 | 7.3 | 27.9 |  | 8 | 8 | 2 | 8 | 8 | 6 | 8 |
| 2026-04-02 | ERA5 (final) | 0.8 | 0.2 | 28.1 | 10.2 | 26.1 |  | 8 | 4 | 2 | 8 | 7 | 6 | 8 |
| 2026-04-03 | ERA5 (final) | 3.1 | 0.5 | 26.0 | 5.9 | 24.7 |  | 8 | 8 | 0 | 8 | 4 | 3 | 6 |
| 2026-04-04 | ERA5 (final) | 0.0 | 0.0 | 28.1 | 8.2 | 25.4 |  | 8 | 4 | 8 | 8 | 8 | 7 | 8 |
| 2026-04-05 | ERA5 (final) | 0.0 | 0.0 | 28.5 | 6.7 | 26.5 |  | 8 | 8 | 8 | 8 | 8 | 6 | 8 |
| 2026-04-06 | ERA5 (final) | 0.1 | 0.1 | 30.8 | 11.4 | 30.2 | heat above 1-in-10-day | 6 | 4 | 8 | 8 | 8 | 6 | 8 |
| 2026-04-07 | ERA5 (final) | 2.5 | 0.3 | 25.3 | 13.2 | 23.8 | gust above 1-in-10-day | 8 | 4 | 0 | 6 | 1 | 2 | 8 |
| 2026-04-08 | ERA5 (final) | 2.5 | 0.4 | 26.2 | 7.1 | 25.0 |  | 8 | 8 | 2 | 8 | 7 | 6 | 8 |
| 2026-04-09 | ERA5 (final) | 0.0 | 0.0 | 27.1 | 6.2 | 25.4 |  | 8 | 8 | 8 | 8 | 8 | 6 | 8 |
| 2026-04-10 | ERA5 (final) | 0.0 | 0.0 | 27.9 | 6.5 | 26.1 |  | 8 | 8 | 8 | 8 | 8 | 6 | 8 |
| 2026-04-11 | ERA5 (final) | 0.0 | 0.0 | 29.7 | 7.1 | 28.0 |  | 8 | 7 | 8 | 8 | 8 | 6 | 8 |
| 2026-04-12 | ERA5 (final) | 0.0 | 0.0 | 28.6 | 7.6 | 27.8 |  | 8 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-04-13 | ERA5 (final) | 1.0 | 0.3 | 30.6 | 7.1 | 29.4 |  | 5 | 8 | 7 | 8 | 7 | 5 | 8 |
| 2026-04-14 | ERA5 (final) | 0.1 | 0.1 | 29.8 | 6.4 | 28.3 |  | 6 | 8 | 5 | 8 | 8 | 4 | 8 |
| 2026-04-15 | ERA5 (final) | 0.0 | 0.0 | 30.9 | 9.0 | 28.9 | heat above 1-in-10-day | 5 | 4 | 8 | 8 | 8 | 6 | 8 |
| 2026-04-16 | ERA5 (final) | 2.8 | 0.9 | 27.5 | 6.9 | 26.9 |  | 8 | 8 | 0 | 8 | 8 | 3 | 8 |
| 2026-04-17 | ERA5 (final) | 0.0 | 0.0 | 30.7 | 9.9 | 27.5 | heat above 1-in-10-day | 8 | 3 | 8 | 8 | 8 | 6 | 8 |
| 2026-04-18 | ERA5 (final) | 0.9 | 0.3 | 30.0 | 11.2 | 27.7 |  | 8 | 2 | 2 | 8 | 6 | 7 | 7 |
| 2026-04-19 | ERA5 (final) | 0.3 | 0.3 | 30.4 | 7.1 | 28.7 |  | 7 | 8 | 5 | 8 | 7 | 4 | 7 |
| 2026-04-20 | ERA5 (final) | 19.6 | 6.8 | 33.3 | 11.8 | 31.5 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 2 | 2 | 6 | 8 | 8 | 6 | 8 |
| 2026-04-21 | ERA5 (final) | 19.2 | 3.8 | 24.9 | 10.4 | 25.5 | rain exceptional (above 1-in-100-day) | 8 | 4 | 0 | 8 | 1 | 0 | 0 |
| 2026-04-22 | ERA5 (final) | 18.8 | 2.8 | 23.8 | 14.0 | 23.3 | rain exceptional (above 1-in-100-day); gust above 1-in-10-day | 8 | 4 | 0 | 8 | 0 | 0 | 0 |
| 2026-04-23 | ERA5 (final) | 20.0 | 2.0 | 20.5 | 14.3 | 19.9 | rain exceptional (above 1-in-100-day); gust above 1-in-10-day | 8 | 1 | 0 | 4 | 0 | 0 | 0 |
| 2026-04-24 | ERA5 (final) | 12.5 | 1.2 | 22.7 | 10.6 | 21.6 | rain heavy (above 1-in-10-day) | 8 | 1 | 0 | 8 | 0 | 0 | 0 |
| 2026-04-25 | ERA5 (final) | 4.9 | 0.7 | 25.4 | 7.2 | 24.1 | rain heavy (above 1-in-10-day) | 8 | 7 | 3 | 8 | 6 | 4 | 0 |
| 2026-04-26 | ERA5 (final) | 0.0 | 0.0 | 29.2 | 5.1 | 28.3 |  | 5 | 8 | 8 | 8 | 8 | 5 | 8 |
| 2026-04-27 | ERA5 (final) | 0.0 | 0.0 | 31.9 | 14.0 | 30.0 | gust above 1-in-10-day; heat above 1-in-10-day | 4 | 5 | 8 | 8 | 8 | 6 | 8 |
| 2026-04-28 | ERA5 (final) | 5.4 | 0.6 | 22.6 | 10.4 | 20.6 | rain heavy (above 1-in-10-day) | 8 | 8 | 0 | 8 | 4 | 0 | 5 |
| 2026-04-29 | ERA5 (final) | 2.9 | 0.6 | 20.9 | 10.0 | 19.1 |  | 8 | 8 | 2 | 8 | 8 | 6 | 0 |
| 2026-04-30 | ERA5 (final) | 0.1 | 0.1 | 25.6 | 8.6 | 24.3 |  | 8 | 8 | 8 | 8 | 8 | 5 | 8 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*