# Site weather record · Mbale · November 2026

Site 1.0821, 34.1750. 13 of 30 days recorded, 6 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 227.6 mm against a pro-rata normal of 397 mm (57 % of normal; full-month normal 917 mm, 1991-2020).
- Rain days (1 mm or more): 13 against a pro-rata normal of 12.9.
- Heavy rain days (above the site's 1-in-10-day amount, 52 mm): 1; exceptional (above 1-in-100-day, 116 mm): 0.
- Days with gusts above the 1-in-10-day value (8 m/s): 1; days hotter than the 1-in-10-day maximum (27.8 °C): 2.
- Working hours lost to weather (caution or stop): outdoor labour 0 h, concrete pour 37 h, asphalt & surfacing 94 h, crane lifts 0 h, work at height 59 h, painting & coatings 74 h, earthworks 69 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-11-01 | ERA5 (final) | 26.9 | 5.2 | 26.7 | 8.1 | 26.3 | gust above 1-in-10-day | 8 | 4 | 0 | 8 | 3 | 2 | 0 |
| 2026-11-02 | ERA5 (final) | 15.3 | 4.0 | 26.5 | 7.9 | 26.8 |  | 8 | 6 | 1 | 8 | 4 | 2 | 0 |
| 2026-11-03 | ERA5 (final) | 15.9 | 4.0 | 27.4 | 5.9 | 27.7 |  | 8 | 7 | 0 | 8 | 2 | 2 | 0 |
| 2026-11-04 | ERA5 (final) | 3.7 | 0.9 | 28.7 | 6.1 | 27.8 | heat above 1-in-10-day | 8 | 8 | 2 | 8 | 5 | 4 | 1 |
| 2026-11-11 | ERA5 (final) | 49.9 | 6.3 | 26.0 | 4.6 | 24.8 |  | 8 | 0 | 0 | 8 | 0 | 0 | 0 |
| 2026-11-12 | ERA5 (final) | 69.6 | 9.1 | 23.0 | 5.7 | 22.7 | rain heavy (above 1-in-10-day) | 8 | 2 | 0 | 8 | 1 | 1 | 0 |
| 2026-11-13 | model analysis (preliminary) | 5.2 | 2.3 | 25.1 | 6.0 | 25.1 |  | 8 | 7 | 0 | 8 | 6 | 4 | 7 |
| 2026-11-14 | model analysis (preliminary) | 9.4 | 3.7 | 25.8 | 6.2 | 26.2 |  | 8 | 3 | 0 | 8 | 2 | 1 | 3 |
| 2026-11-15 | model analysis (preliminary) | 9.1 | 3.2 | 26.6 | 5.7 | 27.6 |  | 8 | 7 | 0 | 8 | 5 | 3 | 5 |
| 2026-11-16 | model analysis (preliminary) | 6.1 | 2.4 | 26.9 | 5.4 | 27.9 |  | 8 | 7 | 0 | 8 | 4 | 3 | 6 |
| 2026-11-17 | model analysis (preliminary) | 6.6 | 4.9 | 26.7 | 6.2 | 27.2 |  | 8 | 7 | 3 | 8 | 5 | 3 | 5 |
| 2026-11-18 | model analysis (preliminary) | 6.3 | 1.9 | 26.9 | 6.3 | 28.2 |  | 8 | 3 | 2 | 8 | 2 | 0 | 2 |
| 2026-11-19 | model analysis (preliminary) | 3.6 | 1.9 | 28.1 | 6.4 | 28.5 | heat above 1-in-10-day | 8 | 6 | 2 | 8 | 6 | 5 | 6 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*