# Site weather record · Muscat · November 2026

Site 23.5880, 58.3829. 13 of 30 days recorded, 6 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 4.3 mm against a pro-rata normal of 5 mm (82 % of normal; full-month normal 12 mm, 1991-2020).
- Rain days (1 mm or more): 1 against a pro-rata normal of 0.4.
- Heavy rain days (above the site's 1-in-10-day amount, 0 mm): 13; exceptional (above 1-in-100-day, 8 mm): 0.
- Days with gusts above the 1-in-10-day value (11 m/s): 3; days hotter than the 1-in-10-day maximum (33.1 °C): 4.
- Working hours lost to weather (caution or stop): outdoor labour 35 h, concrete pour 79 h, asphalt & surfacing 18 h, crane lifts 0 h, work at height 16 h, painting & coatings 7 h, earthworks 3 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-11-01 | ERA5 (final) | 0.0 | 0.0 | 32.5 | 8.3 | 30.1 | rain heavy (above 1-in-10-day) | 2 | 6 | 9 | 9 | 9 | 9 | 9 |
| 2026-11-02 | ERA5 (final) | 0.0 | 0.0 | 34.5 | 9.1 | 30.6 | rain heavy (above 1-in-10-day); heat above 1-in-10-day | 2 | 4 | 9 | 9 | 9 | 9 | 9 |
| 2026-11-03 | ERA5 (final) | 0.0 | 0.0 | 35.1 | 9.5 | 29.5 | rain heavy (above 1-in-10-day); heat above 1-in-10-day | 3 | 1 | 9 | 9 | 9 | 9 | 9 |
| 2026-11-04 | ERA5 (final) | 0.0 | 0.0 | 36.1 | 9.6 | 30.0 | rain heavy (above 1-in-10-day); heat above 1-in-10-day | 3 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-11-05 | ERA5 (final) | 0.0 | 0.0 | 35.0 | 10.1 | 29.8 | rain heavy (above 1-in-10-day); heat above 1-in-10-day | 4 | 1 | 9 | 9 | 9 | 9 | 9 |
| 2026-11-12 | ERA5 (final) | 0.0 | 0.0 | 32.8 | 10.1 | 28.8 | rain heavy (above 1-in-10-day) | 5 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-11-13 | model analysis (preliminary) | 0.0 | 0.0 | 30.1 | 12.3 | 26.6 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 9 | 1 | 9 | 9 | 6 | 9 | 9 |
| 2026-11-14 | model analysis (preliminary) | 0.0 | 0.0 | 28.6 | 12.8 | 25.6 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 9 | 1 | 9 | 9 | 4 | 9 | 9 |
| 2026-11-15 | model analysis (preliminary) | 0.0 | 0.0 | 29.3 | 8.6 | 26.5 | rain heavy (above 1-in-10-day) | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-11-16 | model analysis (preliminary) | 0.5 | 0.2 | 29.3 | 8.4 | 26.8 | rain heavy (above 1-in-10-day) | 9 | 5 | 5 | 9 | 9 | 9 | 9 |
| 2026-11-17 | model analysis (preliminary) | 0.7 | 0.2 | 29.4 | 8.4 | 26.7 | rain heavy (above 1-in-10-day) | 9 | 5 | 3 | 9 | 8 | 8 | 9 |
| 2026-11-18 | model analysis (preliminary) | 0.9 | 0.4 | 29.6 | 11.0 | 27.0 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 9 | 4 | 5 | 9 | 5 | 6 | 8 |
| 2026-11-19 | model analysis (preliminary) | 2.2 | 1.7 | 30.7 | 10.4 | 27.8 | rain heavy (above 1-in-10-day) | 9 | 5 | 5 | 9 | 6 | 6 | 7 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*
