# Site weather record · Riyadh · February 2026

Site 24.7136, 46.6753. 28 of 28 days recorded, 28 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 0.7 mm against a pro-rata normal of 5 mm (13 % of normal; full-month normal 5 mm, 1991-2020).
- Rain days (1 mm or more): 0 against a pro-rata normal of 1.5.
- Heavy rain days (above the site's 1-in-10-day amount, 0 mm): 2; exceptional (above 1-in-100-day, 5 mm): 0.
- Days with gusts above the 1-in-10-day value (13 m/s): 0; days hotter than the 1-in-10-day maximum (29.4 °C): 7.
- Working hours lost to weather (caution or stop): outdoor labour 0 h, concrete pour 163 h, asphalt & surfacing 7 h, crane lifts 0 h, work at height 20 h, painting & coatings 2 h, earthworks 0 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-02-01 | ERA5 (final) | 0.0 | 0.0 | 28.9 | 7.2 | 22.0 |  | 9 | 5 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-02 | ERA5 (final) | 0.0 | 0.0 | 28.7 | 9.4 | 20.4 |  | 9 | 4 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-03 | ERA5 (final) | 0.0 | 0.0 | 29.0 | 10.5 | 19.3 |  | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-04 | ERA5 (final) | 0.0 | 0.0 | 22.8 | 10.3 | 16.8 |  | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-05 | ERA5 (final) | 0.0 | 0.0 | 21.5 | 7.8 | 16.4 |  | 9 | 4 | 8 | 9 | 9 | 9 | 9 |
| 2026-02-06 | ERA5 (final) | 0.2 | 0.1 | 21.0 | 12.1 | 16.2 | rain heavy (above 1-in-10-day) | 9 | 4 | 6 | 9 | 5 | 9 | 9 |
| 2026-02-07 | ERA5 (final) | 0.5 | 0.2 | 25.5 | 11.8 | 19.9 | rain heavy (above 1-in-10-day) | 9 | 3 | 7 | 9 | 5 | 8 | 9 |
| 2026-02-08 | ERA5 (final) | 0.0 | 0.0 | 27.8 | 9.1 | 20.3 |  | 9 | 4 | 9 | 9 | 9 | 8 | 9 |
| 2026-02-09 | ERA5 (final) | 0.0 | 0.0 | 29.6 | 7.6 | 22.2 | heat above 1-in-10-day | 9 | 4 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-10 | ERA5 (final) | 0.0 | 0.0 | 31.1 | 9.8 | 22.3 | heat above 1-in-10-day | 9 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-11 | ERA5 (final) | 0.0 | 0.0 | 31.7 | 12.1 | 21.6 | heat above 1-in-10-day | 9 | 0 | 9 | 9 | 6 | 9 | 9 |
| 2026-02-12 | ERA5 (final) | 0.0 | 0.0 | 31.5 | 10.1 | 21.6 | heat above 1-in-10-day | 9 | 1 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-13 | ERA5 (final) | 0.0 | 0.0 | 31.5 | 8.6 | 22.1 | heat above 1-in-10-day | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-14 | ERA5 (final) | 0.0 | 0.0 | 31.3 | 11.7 | 21.8 | heat above 1-in-10-day | 9 | 1 | 9 | 9 | 7 | 9 | 9 |
| 2026-02-15 | ERA5 (final) | 0.0 | 0.0 | 26.5 | 10.8 | 19.1 |  | 9 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-16 | ERA5 (final) | 0.0 | 0.0 | 24.2 | 10.7 | 17.2 |  | 9 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-17 | ERA5 (final) | 0.0 | 0.0 | 24.7 | 4.6 | 19.2 |  | 9 | 7 | 8 | 9 | 9 | 9 | 9 |
| 2026-02-18 | ERA5 (final) | 0.0 | 0.0 | 26.7 | 10.7 | 17.5 |  | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-19 | ERA5 (final) | 0.0 | 0.0 | 27.7 | 9.4 | 19.3 |  | 9 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-20 | ERA5 (final) | 0.0 | 0.0 | 27.0 | 4.8 | 21.3 |  | 9 | 7 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-21 | ERA5 (final) | 0.0 | 0.0 | 26.7 | 5.8 | 19.5 |  | 9 | 5 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-22 | ERA5 (final) | 0.0 | 0.0 | 27.6 | 5.0 | 21.5 |  | 9 | 7 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-23 | ERA5 (final) | 0.0 | 0.0 | 29.0 | 7.9 | 19.9 |  | 9 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-24 | ERA5 (final) | 0.0 | 0.0 | 30.7 | 12.8 | 20.9 | heat above 1-in-10-day | 9 | 1 | 9 | 9 | 5 | 9 | 9 |
| 2026-02-25 | ERA5 (final) | 0.0 | 0.0 | 23.5 | 12.4 | 17.1 |  | 9 | 1 | 9 | 9 | 6 | 9 | 9 |
| 2026-02-26 | ERA5 (final) | 0.0 | 0.0 | 24.1 | 6.1 | 18.4 |  | 9 | 7 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-27 | ERA5 (final) | 0.0 | 0.0 | 29.1 | 9.9 | 20.2 |  | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-02-28 | ERA5 (final) | 0.0 | 0.0 | 28.3 | 11.4 | 21.1 |  | 9 | 2 | 9 | 9 | 9 | 9 | 9 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*
