# Site weather record · Riyadh · March 2026

Site 24.7136, 46.6753. 31 of 31 days recorded, 31 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 20.4 mm against a pro-rata normal of 11 mm (179 % of normal; full-month normal 11 mm, 1991-2020).
- Rain days (1 mm or more): 6 against a pro-rata normal of 1.9.
- Heavy rain days (above the site's 1-in-10-day amount, 0 mm): 8; exceptional (above 1-in-100-day, 8 mm): 0.
- Days with gusts above the 1-in-10-day value (14 m/s): 3; days hotter than the 1-in-10-day maximum (33.1 °C): 2.
- Working hours lost to weather (caution or stop): outdoor labour 0 h, concrete pour 157 h, asphalt & surfacing 46 h, crane lifts 10 h, work at height 50 h, painting & coatings 33 h, earthworks 21 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-03-01 | ERA5 (final) | 0.0 | 0.0 | 23.9 | 9.9 | 17.9 |  | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-03-02 | ERA5 (final) | 0.0 | 0.0 | 22.9 | 9.1 | 17.0 |  | 9 | 4 | 9 | 9 | 9 | 9 | 9 |
| 2026-03-03 | ERA5 (final) | 6.4 | 1.1 | 14.8 | 11.2 | 10.9 | rain heavy (above 1-in-10-day) | 9 | 3 | 3 | 9 | 2 | 4 | 4 |
| 2026-03-04 | ERA5 (final) | 0.0 | 0.0 | 18.8 | 11.3 | 13.8 |  | 9 | 3 | 8 | 9 | 8 | 9 | 4 |
| 2026-03-05 | ERA5 (final) | 0.0 | 0.0 | 21.6 | 5.0 | 16.4 |  | 9 | 8 | 8 | 9 | 9 | 9 | 9 |
| 2026-03-06 | ERA5 (final) | 0.0 | 0.0 | 22.3 | 8.0 | 14.5 |  | 9 | 4 | 9 | 9 | 9 | 9 | 9 |
| 2026-03-07 | ERA5 (final) | 0.0 | 0.0 | 24.2 | 11.8 | 17.1 |  | 9 | 2 | 9 | 9 | 7 | 9 | 9 |
| 2026-03-08 | ERA5 (final) | 0.6 | 0.4 | 28.1 | 12.1 | 20.3 | rain heavy (above 1-in-10-day) | 9 | 3 | 8 | 9 | 7 | 9 | 9 |
| 2026-03-09 | ERA5 (final) | 0.0 | 0.0 | 22.9 | 11.6 | 17.8 |  | 9 | 1 | 9 | 9 | 5 | 9 | 9 |
| 2026-03-10 | ERA5 (final) | 1.9 | 0.5 | 18.5 | 11.7 | 16.2 | rain heavy (above 1-in-10-day) | 9 | 8 | 3 | 9 | 6 | 6 | 6 |
| 2026-03-11 | ERA5 (final) | 0.0 | 0.0 | 23.6 | 11.6 | 20.6 |  | 9 | 5 | 9 | 9 | 6 | 8 | 9 |
| 2026-03-12 | ERA5 (final) | 1.8 | 0.3 | 23.6 | 11.3 | 22.8 | rain heavy (above 1-in-10-day) | 9 | 9 | 1 | 9 | 7 | 4 | 8 |
| 2026-03-13 | ERA5 (final) | 0.0 | 0.0 | 30.0 | 7.0 | 24.7 |  | 9 | 5 | 9 | 9 | 9 | 6 | 9 |
| 2026-03-14 | ERA5 (final) | 0.0 | 0.0 | 28.8 | 11.3 | 23.1 |  | 9 | 4 | 9 | 9 | 6 | 6 | 9 |
| 2026-03-15 | ERA5 (final) | 0.0 | 0.0 | 33.8 | 13.9 | 24.1 | gust above 1-in-10-day; heat above 1-in-10-day | 9 | 2 | 8 | 4 | 2 | 8 | 9 |
| 2026-03-16 | ERA5 (final) | 0.0 | 0.0 | 36.0 | 13.8 | 24.4 | gust above 1-in-10-day; heat above 1-in-10-day | 9 | 1 | 9 | 9 | 9 | 9 | 9 |
| 2026-03-17 | ERA5 (final) | 0.1 | 0.1 | 27.2 | 11.4 | 23.0 |  | 9 | 4 | 9 | 9 | 9 | 8 | 9 |
| 2026-03-18 | ERA5 (final) | 0.0 | 0.0 | 27.0 | 9.6 | 21.8 |  | 9 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-03-19 | ERA5 (final) | 1.1 | 0.6 | 25.4 | 13.1 | 19.2 | rain heavy (above 1-in-10-day) | 9 | 1 | 5 | 9 | 8 | 8 | 8 |
| 2026-03-20 | ERA5 (final) | 0.2 | 0.1 | 28.2 | 10.8 | 20.4 |  | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-03-21 | ERA5 (final) | 0.7 | 0.4 | 29.0 | 9.5 | 23.0 | rain heavy (above 1-in-10-day) | 9 | 5 | 9 | 9 | 9 | 9 | 9 |
| 2026-03-22 | ERA5 (final) | 1.7 | 1.0 | 31.9 | 12.3 | 24.6 | rain heavy (above 1-in-10-day) | 9 | 1 | 6 | 9 | 6 | 8 | 9 |
| 2026-03-23 | ERA5 (final) | 0.2 | 0.1 | 30.3 | 8.9 | 24.8 |  | 9 | 7 | 5 | 9 | 9 | 7 | 9 |
| 2026-03-24 | ERA5 (final) | 0.3 | 0.2 | 28.7 | 11.8 | 22.9 |  | 9 | 5 | 9 | 9 | 9 | 7 | 9 |
| 2026-03-25 | ERA5 (final) | 0.0 | 0.0 | 31.1 | 12.7 | 22.6 |  | 9 | 1 | 9 | 9 | 6 | 9 | 9 |
| 2026-03-26 | ERA5 (final) | 5.3 | 1.9 | 24.4 | 16.3 | 21.4 | rain heavy (above 1-in-10-day); gust above 1-in-10-day | 9 | 4 | 0 | 4 | 4 | 6 | 9 |
| 2026-03-27 | ERA5 (final) | 0.0 | 0.0 | 21.9 | 10.8 | 17.7 |  | 9 | 7 | 9 | 9 | 9 | 8 | 3 |
| 2026-03-28 | ERA5 (final) | 0.0 | 0.0 | 24.1 | 4.4 | 20.8 |  | 9 | 9 | 9 | 9 | 9 | 8 | 9 |
| 2026-03-29 | ERA5 (final) | 0.0 | 0.0 | 29.3 | 10.9 | 21.8 |  | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-03-30 | ERA5 (final) | 0.0 | 0.0 | 32.7 | 12.4 | 23.2 |  | 9 | 1 | 9 | 9 | 5 | 9 | 9 |
| 2026-03-31 | ERA5 (final) | 0.1 | 0.1 | 31.1 | 9.9 | 25.7 |  | 9 | 6 | 7 | 9 | 9 | 9 | 9 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*