# Site weather record · Riyadh · April 2026

Site 24.7136, 46.6753. 30 of 30 days recorded, 30 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 12.0 mm against a pro-rata normal of 14 mm (87 % of normal; full-month normal 14 mm, 1991-2020).
- Rain days (1 mm or more): 3 against a pro-rata normal of 2.7.
- Heavy rain days (above the site's 1-in-10-day amount, 1 mm): 5; exceptional (above 1-in-100-day, 7 mm): 0.
- Days with gusts above the 1-in-10-day value (14 m/s): 2; days hotter than the 1-in-10-day maximum (38.2 °C): 0.
- Working hours lost to weather (caution or stop): outdoor labour 0 h, concrete pour 206 h, asphalt & surfacing 53 h, crane lifts 19 h, work at height 52 h, painting & coatings 15 h, earthworks 1 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-04-01 | ERA5 (final) | 0.0 | 0.0 | 28.9 | 10.1 | 24.4 |  | 9 | 5 | 9 | 9 | 9 | 7 | 9 |
| 2026-04-02 | ERA5 (final) | 0.0 | 0.0 | 28.0 | 6.8 | 20.5 |  | 9 | 5 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-03 | ERA5 (final) | 0.0 | 0.0 | 33.6 | 6.2 | 24.7 |  | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-04 | ERA5 (final) | 0.3 | 0.2 | 35.5 | 16.3 | 25.4 | gust above 1-in-10-day | 9 | 0 | 7 | 6 | 4 | 9 | 9 |
| 2026-04-05 | ERA5 (final) | 1.9 | 0.8 | 27.5 | 9.4 | 24.0 | rain heavy (above 1-in-10-day) | 9 | 5 | 8 | 9 | 9 | 7 | 9 |
| 2026-04-06 | ERA5 (final) | 0.0 | 0.0 | 28.2 | 7.7 | 21.4 |  | 9 | 2 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-07 | ERA5 (final) | 0.0 | 0.0 | 27.2 | 7.5 | 21.0 |  | 9 | 3 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-08 | ERA5 (final) | 0.1 | 0.1 | 30.5 | 13.7 | 21.7 |  | 9 | 0 | 4 | 7 | 6 | 9 | 9 |
| 2026-04-09 | ERA5 (final) | 0.0 | 0.0 | 29.2 | 13.3 | 19.9 |  | 9 | 0 | 9 | 7 | 2 | 9 | 9 |
| 2026-04-10 | ERA5 (final) | 0.0 | 0.0 | 28.5 | 9.9 | 21.7 |  | 9 | 3 | 9 | 9 | 9 | 8 | 9 |
| 2026-04-11 | ERA5 (final) | 4.5 | 1.6 | 32.1 | 13.9 | 25.0 | rain heavy (above 1-in-10-day) | 9 | 1 | 5 | 6 | 2 | 8 | 8 |
| 2026-04-12 | ERA5 (final) | 0.0 | 0.0 | 28.4 | 9.3 | 23.5 |  | 9 | 4 | 9 | 9 | 9 | 8 | 9 |
| 2026-04-13 | ERA5 (final) | 2.1 | 1.0 | 30.4 | 9.4 | 24.8 | rain heavy (above 1-in-10-day) | 9 | 4 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-14 | ERA5 (final) | 0.1 | 0.1 | 30.5 | 8.6 | 24.2 |  | 9 | 4 | 9 | 9 | 9 | 8 | 9 |
| 2026-04-15 | ERA5 (final) | 0.2 | 0.1 | 27.1 | 6.2 | 23.6 |  | 9 | 6 | 6 | 9 | 9 | 7 | 9 |
| 2026-04-16 | ERA5 (final) | 0.1 | 0.1 | 29.3 | 6.6 | 23.3 |  | 9 | 6 | 5 | 9 | 9 | 9 | 9 |
| 2026-04-17 | ERA5 (final) | 0.1 | 0.1 | 31.3 | 7.7 | 24.9 |  | 9 | 2 | 6 | 9 | 9 | 9 | 9 |
| 2026-04-18 | ERA5 (final) | 0.0 | 0.0 | 35.1 | 12.5 | 24.5 |  | 9 | 0 | 9 | 9 | 6 | 9 | 9 |
| 2026-04-19 | ERA5 (final) | 0.2 | 0.2 | 36.7 | 10.6 | 26.5 |  | 9 | 0 | 7 | 9 | 8 | 8 | 9 |
| 2026-04-20 | ERA5 (final) | 0.0 | 0.0 | 33.8 | 15.7 | 25.2 | gust above 1-in-10-day | 9 | 0 | 2 | 5 | 1 | 9 | 9 |
| 2026-04-21 | ERA5 (final) | 0.3 | 0.1 | 32.9 | 11.3 | 25.2 |  | 9 | 0 | 6 | 9 | 8 | 9 | 9 |
| 2026-04-22 | ERA5 (final) | 0.7 | 0.3 | 30.0 | 10.2 | 24.7 | rain heavy (above 1-in-10-day) | 9 | 3 | 9 | 9 | 9 | 8 | 9 |
| 2026-04-23 | ERA5 (final) | 0.2 | 0.1 | 27.1 | 12.6 | 23.1 |  | 9 | 2 | 6 | 9 | 6 | 8 | 9 |
| 2026-04-24 | ERA5 (final) | 0.4 | 0.2 | 32.6 | 13.3 | 24.7 |  | 9 | 2 | 5 | 8 | 5 | 8 | 9 |
| 2026-04-25 | ERA5 (final) | 0.1 | 0.1 | 32.4 | 11.9 | 24.2 |  | 9 | 3 | 6 | 9 | 7 | 9 | 9 |
| 2026-04-26 | ERA5 (final) | 0.0 | 0.0 | 33.9 | 13.4 | 25.6 |  | 9 | 1 | 9 | 5 | 3 | 9 | 9 |
| 2026-04-27 | ERA5 (final) | 0.0 | 0.0 | 35.6 | 11.6 | 25.3 |  | 9 | 0 | 9 | 9 | 8 | 9 | 9 |
| 2026-04-28 | ERA5 (final) | 0.0 | 0.0 | 35.4 | 9.7 | 27.7 |  | 9 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-04-29 | ERA5 (final) | 0.7 | 0.2 | 30.0 | 9.9 | 24.0 | rain heavy (above 1-in-10-day) | 9 | 0 | 0 | 9 | 8 | 8 | 9 |
| 2026-04-30 | ERA5 (final) | 0.0 | 0.0 | 33.1 | 10.8 | 24.8 |  | 9 | 1 | 9 | 9 | 9 | 9 | 9 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*