# Site weather record · Riyadh · June 2026

Site 24.7136, 46.6753. 30 of 30 days recorded, 30 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 0.0 mm against a pro-rata normal of 0 mm (normal under 1 mm, so no percentage; full-month normal 0 mm, 1991-2020).
- Rain days (1 mm or more): 0 against a pro-rata normal of 0.0.
- Heavy rain days (above the site's 1-in-10-day amount, 0 mm): 0; exceptional (above 1-in-100-day, 0 mm): 30.
- Days with gusts above the 1-in-10-day value (14 m/s): 0; days hotter than the 1-in-10-day maximum (44.3 °C): 9.
- Working hours lost to weather (caution or stop): outdoor labour 54 h, concrete pour 268 h, asphalt & surfacing 0 h, crane lifts 0 h, work at height 16 h, painting & coatings 0 h, earthworks 0 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-06-01 | ERA5 (final) | 0.0 | 0.0 | 42.9 | 9.1 | 28.6 | rain exceptional (above 1-in-100-day) | 7 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-02 | ERA5 (final) | 0.0 | 0.0 | 44.2 | 8.1 | 29.4 | rain exceptional (above 1-in-100-day) | 5 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-03 | ERA5 (final) | 0.0 | 0.0 | 44.6 | 9.3 | 29.0 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 5 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-04 | ERA5 (final) | 0.0 | 0.0 | 42.5 | 7.7 | 28.7 | rain exceptional (above 1-in-100-day) | 5 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-05 | ERA5 (final) | 0.0 | 0.0 | 42.3 | 7.7 | 27.9 | rain exceptional (above 1-in-100-day) | 9 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-06 | ERA5 (final) | 0.0 | 0.0 | 44.3 | 9.5 | 28.6 | rain exceptional (above 1-in-100-day) | 6 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-07 | ERA5 (final) | 0.0 | 0.0 | 44.5 | 8.7 | 28.3 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 5 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-08 | ERA5 (final) | 0.0 | 0.0 | 43.9 | 11.6 | 28.1 | rain exceptional (above 1-in-100-day) | 7 | 0 | 9 | 9 | 7 | 9 | 9 |
| 2026-06-09 | ERA5 (final) | 0.0 | 0.0 | 44.7 | 11.9 | 28.1 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 8 | 0 | 9 | 9 | 7 | 9 | 9 |
| 2026-06-10 | ERA5 (final) | 0.0 | 0.0 | 45.7 | 8.6 | 29.5 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 5 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-11 | ERA5 (final) | 0.0 | 0.0 | 43.5 | 8.5 | 28.0 | rain exceptional (above 1-in-100-day) | 8 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-12 | ERA5 (final) | 0.0 | 0.0 | 44.0 | 11.9 | 27.5 | rain exceptional (above 1-in-100-day) | 9 | 0 | 9 | 9 | 6 | 9 | 9 |
| 2026-06-13 | ERA5 (final) | 0.0 | 0.0 | 43.1 | 5.9 | 29.4 | rain exceptional (above 1-in-100-day) | 6 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-14 | ERA5 (final) | 0.0 | 0.0 | 44.4 | 8.6 | 28.7 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 6 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-15 | ERA5 (final) | 0.0 | 0.0 | 44.5 | 10.7 | 28.1 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 7 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-16 | ERA5 (final) | 0.0 | 0.0 | 41.9 | 10.1 | 27.4 | rain exceptional (above 1-in-100-day) | 9 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-17 | ERA5 (final) | 0.0 | 0.0 | 41.7 | 11.4 | 27.3 | rain exceptional (above 1-in-100-day) | 9 | 0 | 9 | 9 | 6 | 9 | 9 |
| 2026-06-18 | ERA5 (final) | 0.0 | 0.0 | 42.4 | 6.6 | 28.0 | rain exceptional (above 1-in-100-day) | 8 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-19 | ERA5 (final) | 0.0 | 0.0 | 42.6 | 7.3 | 27.7 | rain exceptional (above 1-in-100-day) | 9 | 1 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-20 | ERA5 (final) | 0.0 | 0.0 | 43.7 | 11.3 | 27.7 | rain exceptional (above 1-in-100-day) | 9 | 0 | 9 | 9 | 8 | 9 | 9 |
| 2026-06-21 | ERA5 (final) | 0.0 | 0.0 | 43.8 | 9.6 | 27.9 | rain exceptional (above 1-in-100-day) | 9 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-22 | ERA5 (final) | 0.0 | 0.0 | 44.8 | 10.9 | 28.5 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 7 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-23 | ERA5 (final) | 0.0 | 0.0 | 44.9 | 10.0 | 29.5 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 5 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-24 | ERA5 (final) | 0.0 | 0.0 | 44.9 | 12.2 | 27.6 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 9 | 0 | 9 | 9 | 4 | 9 | 9 |
| 2026-06-25 | ERA5 (final) | 0.0 | 0.0 | 43.6 | 10.3 | 28.1 | rain exceptional (above 1-in-100-day) | 8 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-26 | ERA5 (final) | 0.0 | 0.0 | 43.3 | 6.2 | 29.0 | rain exceptional (above 1-in-100-day) | 5 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-27 | ERA5 (final) | 0.0 | 0.0 | 43.6 | 7.0 | 29.5 | rain exceptional (above 1-in-100-day) | 5 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-28 | ERA5 (final) | 0.0 | 0.0 | 43.0 | 8.7 | 28.1 | rain exceptional (above 1-in-100-day) | 8 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-29 | ERA5 (final) | 0.0 | 0.0 | 43.0 | 10.7 | 27.9 | rain exceptional (above 1-in-100-day) | 9 | 1 | 9 | 9 | 9 | 9 | 9 |
| 2026-06-30 | ERA5 (final) | 0.0 | 0.0 | 42.1 | 9.1 | 27.5 | rain exceptional (above 1-in-100-day) | 9 | 0 | 9 | 9 | 9 | 9 | 9 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*
