# Site weather record · Riyadh · August 2026

Site 24.7136, 46.6753. 31 of 31 days recorded, 31 finalised from ERA5 (the rest are preliminary model analysis and are replaced automatically once ERA5 is published).

- Rain 0.1 mm against a pro-rata normal of 0 mm (normal under 1 mm, so no percentage; full-month normal 0 mm, 1991-2020).
- Rain days (1 mm or more): 0 against a pro-rata normal of 0.0.
- Heavy rain days (above the site's 1-in-10-day amount, 0 mm): 0; exceptional (above 1-in-100-day, 0 mm): 31.
- Days with gusts above the 1-in-10-day value (13 m/s): 1; days hotter than the 1-in-10-day maximum (44.7 °C): 21.
- Working hours lost to weather (caution or stop): outdoor labour 143 h, concrete pour 279 h, asphalt & surfacing 4 h, crane lifts 4 h, work at height 21 h, painting & coatings 0 h, earthworks 0 h.

| date | source | rain mm | max mm/h | Tmax °C | gust m/s | WBGT sun °C | flags | go h Outdoor labour | go h Concrete pour | go h Asphalt & surfacing | go h Crane lifts | go h Work at height | go h Painting & coatings | go h Earthworks |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2026-08-01 | ERA5 (final) | 0.0 | 0.0 | 45.6 | 9.8 | 29.2 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 5 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-02 | ERA5 (final) | 0.0 | 0.0 | 45.0 | 9.3 | 29.1 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 5 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-03 | ERA5 (final) | 0.0 | 0.0 | 45.1 | 12.8 | 28.1 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 5 | 0 | 8 | 9 | 5 | 9 | 9 |
| 2026-08-04 | ERA5 (final) | 0.0 | 0.0 | 45.3 | 12.1 | 29.3 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 4 | 0 | 9 | 9 | 7 | 9 | 9 |
| 2026-08-05 | ERA5 (final) | 0.0 | 0.0 | 45.3 | 7.8 | 29.6 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 4 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-06 | ERA5 (final) | 0.0 | 0.0 | 45.1 | 9.7 | 30.1 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 3 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-07 | ERA5 (final) | 0.0 | 0.0 | 45.2 | 9.3 | 29.3 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 4 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-08 | ERA5 (final) | 0.0 | 0.0 | 45.3 | 7.7 | 30.7 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 4 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-09 | ERA5 (final) | 0.0 | 0.0 | 45.0 | 11.2 | 30.5 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 4 | 0 | 9 | 9 | 8 | 9 | 9 |
| 2026-08-10 | ERA5 (final) | 0.1 | 0.1 | 45.2 | 8.3 | 31.0 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 2 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-11 | ERA5 (final) | 0.0 | 0.0 | 44.9 | 7.0 | 31.8 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 2 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-12 | ERA5 (final) | 0.0 | 0.0 | 44.7 | 6.2 | 32.1 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 1 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-13 | ERA5 (final) | 0.0 | 0.0 | 45.7 | 9.4 | 30.7 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 4 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-14 | ERA5 (final) | 0.0 | 0.0 | 45.2 | 9.2 | 30.1 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 3 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-15 | ERA5 (final) | 0.0 | 0.0 | 45.3 | 8.0 | 30.7 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 3 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-16 | ERA5 (final) | 0.0 | 0.0 | 45.6 | 5.7 | 30.3 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 2 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-17 | ERA5 (final) | 0.0 | 0.0 | 46.0 | 6.6 | 31.0 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 4 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-18 | ERA5 (final) | 0.0 | 0.0 | 46.0 | 5.6 | 31.2 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 3 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-19 | ERA5 (final) | 0.0 | 0.0 | 44.2 | 10.4 | 30.7 | rain exceptional (above 1-in-100-day) | 4 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-20 | ERA5 (final) | 0.0 | 0.0 | 42.5 | 10.4 | 28.2 | rain exceptional (above 1-in-100-day) | 8 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-21 | ERA5 (final) | 0.0 | 0.0 | 42.2 | 14.0 | 26.5 | rain exceptional (above 1-in-100-day); gust above 1-in-10-day | 9 | 0 | 6 | 5 | 3 | 9 | 9 |
| 2026-08-22 | ERA5 (final) | 0.0 | 0.0 | 42.5 | 11.2 | 26.9 | rain exceptional (above 1-in-100-day) | 9 | 0 | 9 | 9 | 7 | 9 | 9 |
| 2026-08-23 | ERA5 (final) | 0.0 | 0.0 | 43.2 | 12.3 | 27.8 | rain exceptional (above 1-in-100-day) | 9 | 0 | 9 | 9 | 5 | 9 | 9 |
| 2026-08-24 | ERA5 (final) | 0.0 | 0.0 | 44.1 | 11.1 | 28.6 | rain exceptional (above 1-in-100-day) | 6 | 0 | 9 | 9 | 7 | 9 | 9 |
| 2026-08-25 | ERA5 (final) | 0.0 | 0.0 | 44.4 | 7.0 | 30.6 | rain exceptional (above 1-in-100-day) | 4 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-26 | ERA5 (final) | 0.0 | 0.0 | 44.4 | 7.8 | 28.3 | rain exceptional (above 1-in-100-day) | 4 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-27 | ERA5 (final) | 0.0 | 0.0 | 44.1 | 10.3 | 29.5 | rain exceptional (above 1-in-100-day) | 4 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-28 | ERA5 (final) | 0.0 | 0.0 | 44.9 | 8.1 | 30.3 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 5 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-29 | ERA5 (final) | 0.0 | 0.0 | 44.8 | 8.1 | 28.9 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 3 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-30 | ERA5 (final) | 0.0 | 0.0 | 45.4 | 7.9 | 30.0 | rain exceptional (above 1-in-100-day); heat above 1-in-10-day | 5 | 0 | 9 | 9 | 9 | 9 | 9 |
| 2026-08-31 | ERA5 (final) | 0.0 | 0.0 | 44.3 | 8.5 | 29.8 | rain exceptional (above 1-in-100-day) | 4 | 0 | 9 | 9 | 9 | 9 | 9 |

*How to use this record: under FIDIC 2017 Sub-Clause 8.5 (1999 Sub-Clause 8.4) a contractor may claim time for exceptionally adverse climatic conditions. This record shows how the month compared with the site's own 1991-2020 climate. It is a weather record for the site location, not a site measurement; a site rain gauge and daily diary remain the primary evidence, and the contract's own definition of 'exceptional' governs.*