Site weather · Dammam

For contractors and site managers: the next seven days as workable hours per trade, with a short site note, refreshed every morning at 06:00. Every day is also archived, so the record of what the weather did, month by month and compared with the site's 1991-2020 climate, builds up on its own.

Site note · Friday 20 November · issued 06:43

Pour concrete 07-12 h; fast drying limits the rest of the day.

Rain 0 mm · 0%Storms lowHeat (WBGT) 27 °CGusts 5 m/s at hook height
Concrete pourLimited

Go 07-12 h, 13-15 h, 16-17 h

070809101113141516

Limited by fast drying. Curing cover and windbreaks ready.

Painting & coatingsLimited

Go 09-12 h, 13-17 h

070809101113141516

Limited by humidity or dew. Check the surface is 3 °C above dew point.

No weather limitsGo

Outdoor labour, Asphalt & surfacing, Crane lifts, Work at height, Earthworks

Work as planned; keep an eye on the sky.

  • Dust: PM2.5 up to 62 µg/m³; damp down haul roads and cutting work; masks for dusty tasks.

Next days

Saturday 21 November

Pour concrete 07-10 h; fast drying limits the rest of the day.

Sunday 22 November

Pour concrete 07-11 h; fast drying limits the rest of the day.

Monday 23 November

Some limits today: check your trade below.

Hours are go hours, 07:00-17:00 with lunch excluded; 08-13 means from 08:00 until the lunch break. Screening guidance from a forecast: the contract, crane manufacturer's limits and site H&S plan come first.

Seven-day site meteogram

Seven-day site meteogram: heat, rain and storms, wind, sun and cloud, concrete and painting, go hours per trade, daily summary and regional maps

Trade panels, the same forecast with only what each trade needs: concrete, asphalt, painting and earthworks · cranes and work at height · heat and outdoor labour

Hourly numbers and per-trade status (CSV) · Thresholds used · Forecasts as issued

Cards to share

The same forecast as images for WhatsApp, LinkedIn, X, Instagram and Facebook, refreshed each morning. Today's briefing · Today (Status / Stories) · Hour-by-hour grid · Printable A4 briefing (PDF) · The week · LinkedIn carousel (PDF) · Caption

Today's site card The week on site cardHow to read the card

Monthly record

Rain against the 1991-2020 normal, heavy and exceptional days, and working hours lost. Days start as preliminary model analysis and are replaced by ERA5 about a week later. Useful as supporting evidence for extension-of-time claims (FIDIC 2017 Sub-Clause 8.5); a site rain gauge and the daily diary remain the primary record.

monthdaysrain mmof normalheavy daysexceptional days concrete h lostlabour (heat) h lostdaily
2026-11130.34 %006028CSV
2026-10310.4–310184250CSV
2026-09300.0–030229246CSV
2026-08310.0–031255266CSV
2026-07310.0–031273244CSV
2026-06300.0–030260230CSV
2026-05310.0–31025966CSV
2026-04308.9211 %2911970CSV
2026-033191.9728 %123960CSV
2026-02282.522 %201140CSV
2026-01310.32 %00850CSV

Screening guidance from a weather forecast, not an instruction. The contract specification, crane manufacturer's limits and site health-and-safety plan take precedence. Forecast and ERA5 data: Open-Meteo (open-meteo.com, CC BY 4.0).

By Gava Charles · Kampala Heat Atlas