Site note · Friday 20 November · issued 04:43

Storms likely from 14:00: finish lifts, roof and asphalt work before then.

Rain 6 mm · 99%Storms likely from 14:00Heat (WBGT) 30 °CGusts 9 m/s at hook height
Concrete pourStop

No window today

0809101112141516

Limited by rain, storms. No pour window: postpone, or pour under cover.

Asphalt & surfacingStop

No window today

0809101112141516

Limited by rain or wet surface, storms. No dry window: do not lay or spray.

Painting & coatingsStop

No window today

0809101112141516

Limited by rain, humidity or dew. Too humid or wet for painting and coatings.

Crane liftsLimited

Go 08-10 h

0809101112141516

Limited by storms. Check the anemometer before each lift.

Work at heightLimited

Go 08-10 h

0809101112141516

Limited by storms, rain. Clear roofs and scaffolds before storms.

EarthworksLimited

Go 08-13 h

0809101112141516

Limited by rain. Protect formation and stockpiles.

Outdoor labourGo with care

Work/rest cycles

0809101112141516

Work/rest cycles 08-13 h, 14-17 h: at the peak, 15 min work / 45 min rest. Water every 20 min, shade for breaks.

  • Dust: PM2.5 up to 41 µg/m³; damp down haul roads and cutting work; masks for dusty tasks.

Next days

Saturday 21 November

Storms likely from 15:00: finish lifts, roof and asphalt work before then.

Sunday 22 November

Storms possible from 12:00: do exposed work in the morning.

Monday 23 November

Heat stress: stop moderate work in the sun 12-13 h.

Hours are go hours, 08:00-17:00 with lunch excluded; 08-13 means from 08:00 until the lunch break. Screening guidance from a forecast: the contract, crane manufacturer's limits and site H&S plan come first.

Seven-day site meteogram

Seven-day site meteogram: heat, rain and storms, wind, sun and cloud, concrete and painting, go hours per trade, daily summary and regional maps

Trade panels, the same forecast with only what each trade needs: concrete, asphalt, painting and earthworks · cranes and work at height · heat and outdoor labour

Hourly numbers and per-trade status (CSV) · Thresholds used · Forecasts as issued

Cards to share

The same forecast as images for WhatsApp, LinkedIn, X, Instagram and Facebook, refreshed each morning. Today's briefing · Today (Status / Stories) · Hour-by-hour grid · Printable A4 briefing (PDF) · The week · LinkedIn carousel (PDF) · Caption

Today's site card The week on site cardHow to read the card

Monthly record

Rain against the 1991-2020 normal, heavy and exceptional days, and working hours lost. Days start as preliminary model analysis and are replaced by ERA5 about a week later. Useful as supporting evidence for extension-of-time claims (FIDIC 2017 Sub-Clause 8.5); a site rain gauge and the daily diary remain the primary record.

monthdaysrain mmof normalheavy daysexceptional days concrete h lostlabour (heat) h lostdaily
2026-111336.1106 %201084CSV
2026-1031104.559 %0024147CSV
2026-0930515.7269 %427430CSV
2026-0831124.389 %30366CSV
2026-0731252.8118 %214926CSV
2026-0630518.5177 %338190CSV
2026-0531197.891 %5053159CSV
2026-043082.163 %1024195CSV
2026-033177.185 %2042196CSV
2026-022853.7119 %4017162CSV
2026-013139.4126 %408177CSV

Screening guidance from a weather forecast, not an instruction. The contract specification, crane manufacturer's limits and site health-and-safety plan take precedence. Forecast and ERA5 data: Open-Meteo (open-meteo.com, CC BY 4.0).

By Gava Charles · Kampala Heat Atlas