Site weather · Muscat

For contractors and site managers: the next seven days as workable hours per trade, with a short site note, refreshed every morning at 06:00. Every day is also archived, so the record of what the weather did, month by month and compared with the site's 1991-2020 climate, builds up on its own.

Site note · Friday 20 November · issued 07:43

Storms possible from 14:00: do exposed work in the morning.

Rain 1 mm · 83%Storms possible from 14:00Heat (WBGT) 26 °CGusts 11 m/s at hook height
Concrete pourLimited

Go 07-10 h

070809101113141516

Limited by rain, storms, fast drying. Curing cover and windbreaks ready.

Asphalt & surfacingLimited

Go 07-10 h

070809101113141516

Limited by rain or wet surface, storms. Never lay or spray on a wet surface.

Crane liftsLimited

Go 07-12 h, 13-14 h

070809101113141516

Limited by storms. Check the anemometer before each lift.

Work at heightLimited

Go 07-12 h

070809101113141516

Limited by storms, rain. Clear roofs and scaffolds before storms.

Painting & coatingsLimited

Go 08-12 h

070809101113141516

Limited by rain, humidity or dew. Check the surface is 3 °C above dew point.

EarthworksLimited

Go 07-12 h, 14-17 h

070809101113141516

Limited by rain. Protect formation and stockpiles.

No weather limitsGo

Outdoor labour

Work as planned; keep an eye on the sky.

Next days

Saturday 21 November

Pour concrete 07-12 h; fast drying limits the rest of the day.

Sunday 22 November

Pour concrete 07-11 h; fast drying limits the rest of the day.

Monday 23 November

Pour concrete 07-12 h; fast drying limits the rest of the day.

Hours are go hours, 07:00-17:00 with lunch excluded; 08-13 means from 08:00 until the lunch break. Screening guidance from a forecast: the contract, crane manufacturer's limits and site H&S plan come first.

Seven-day site meteogram

Seven-day site meteogram: heat, rain and storms, wind, sun and cloud, concrete and painting, go hours per trade, daily summary and regional maps

Trade panels, the same forecast with only what each trade needs: concrete, asphalt, painting and earthworks · cranes and work at height · heat and outdoor labour

Hourly numbers and per-trade status (CSV) · Thresholds used · Forecasts as issued

Cards to share

The same forecast as images for WhatsApp, LinkedIn, X, Instagram and Facebook, refreshed each morning. Today's briefing · Today (Status / Stories) · Hour-by-hour grid · Printable A4 briefing (PDF) · The week · LinkedIn carousel (PDF) · Caption

Today's site card The week on site cardHow to read the card

Monthly record

Rain against the 1991-2020 normal, heavy and exceptional days, and working hours lost. Days start as preliminary model analysis and are replaced by ERA5 about a week later. Useful as supporting evidence for extension-of-time claims (FIDIC 2017 Sub-Clause 8.5); a site rain gauge and the daily diary remain the primary record.

monthdaysrain mmof normalheavy daysexceptional days concrete h lostlabour (heat) h lostdaily
2026-11134.382 %1307935CSV
2026-10311.8139 %310191238CSV
2026-09300.0–030219257CSV
2026-08310.00 %310232278CSV
2026-07310.00 %310233277CSV
2026-06300.00 %300243262CSV
2026-05310.0–310270253CSV
2026-04309.0129 %29121280CSV
2026-033185.2470 %6213922CSV
2026-02281.110 %2801110CSV
2026-01312.011 %10900CSV

Screening guidance from a weather forecast, not an instruction. The contract specification, crane manufacturer's limits and site health-and-safety plan take precedence. Forecast and ERA5 data: Open-Meteo (open-meteo.com, CC BY 4.0).

By Gava Charles · Kampala Heat Atlas